protection analysis project 中文意思是什麼

protection analysis project 解釋
保護分析計劃
  • protection : n 1 保護,保衛,防禦,掩護,包庇,照顧 (from; against)。2 保護者,防護物 (against); 〈美俚〉...
  • analysis : n. (pl. -ses )1. 分解,分析;【數學】解析。2. 梗概,要略。3. 〈美國〉用精神分析法治療(= psychoanalysis)。
  • project : vt 1 投擲,拋出;發射(炮彈等);噴射。2 使突出,使凸出。3 設計,規劃,計劃,打算,籌劃。4 投影;...
  1. Be familiar with hv, mv and lv power distribution systems and power factor correction study & harmonic analysis, ups and dc power systems, power fiscal metering, and all necessary calculations to one project including short circuit calculation and protective device coordination study, lightning protection calculation, generator power calculation etc

    熟悉項目中的高、中、低壓配電系統和功率因素補償研究及諧波分析, ups和直流電氣系統,功率計量,相關計算(包括短路計算和保護裝置協調分析,照明保護計算,發電機功率計算等) 。
  2. The scheme embraces four projects, namely ( 1 ) to build up sluices at anqiu bridge and nanzhou bridge ( and the one at anqiu bridge is the first choice ) so that pollutants can be from entering the lake ; 2 ) as a necessary accessory for the above project, to supplement water capacity from changdang lake as a strategic water source into the protection program, and culvert - pipe plan is recommended from two other alternatives through systematic analysis ; 3 ) to carry out comprehensive realignment for some reed regions which are located at the entrances of the lake, and to develop a wetland ecosystem mainly with some reeds ; and 4 ) to set up a green protection belt right round the lake, including planting reeds at lakebeach, building forest belt, developing bases of green foodstuff and disposing sludges in the lake base

    該方案由4個工程子系統組成, ( 1 )截污工程:在岸丘橋和南州橋位置各築一節制閘(而岸丘橋工程又是首選工程) ,以封住湖泊兩頭入流,杜絕污染物進入水源地的截污工程; ( 2 )引水工程:是截污工程的配套工程,利用下游長蕩湖來補充水量,並對3個引水工程設想進行了系統分析,推薦涵管方案,同時將長蕩湖作為該市戰略水源地一併納入保護體系中; ( 3 )濕地生態處理工程:對進入蕩區前的蘆葦區進行綜合整治,發展以蘆葦為主的濕地生態處理工程; ( 4 )環湖綠色自然保護帶工程:包括建設圍湖蘆葦蕩、環湖林帶、綠色食品基地以及污泥處置。
  3. The reactor protection system reliability analysis of daya bay npp is an important branch of the probabilistic risk assessment project of daya bay nuclear power plant. the purpose of probabilistic risk assessment of reducing reactor trip is to discover all the signals and the components which can result in reactor trip potentially, to assess the safety and reliability of systematic design, to find the potential design drawbacks and take effective measures to reduce such events

    大亞灣核電站反應堆保護系統是大亞灣核電站pra項目的重要的一個分支,大亞灣核電站減少緊急停堆pra (概率安全分析)是要找出各種可能引起機組緊急停堆的信號和部件,評價系統設計的安全性和可靠性,找到可能存在的設計缺陷,採取有效的防範措施,減少此類事件。
  4. The stability analysis and structural optimization design of the hydraulic automatic tilting gates with connecting lever and rolling wheel were carried out in the paper to make them not only be better applied in all kinds of water conservancy but also be wildly applied in ship project, city environmental protection, and other correlative project, further to better the social and living condition

    本文對連桿滾輪式水力自動翻板閘門進行穩定性分析和結構優化設計,使得它們不僅能更好地應用於各類水利水電工程中,而且能廣泛應用於航運工程、城市環境保護和其他相關工程中,將會對社會的發展和生活環境的改善有著重要的意義。
  5. Through the analysis on the law investment and production cost of the international exploration petroleum project, the factors controlling the foreign contractor were selected, new psc model were constructed and verified by actual project data, to test the adaptation of the new model to oil price and the extent of the protection to the host country

    通過分析石油勘探國際合作項目的投資、生產成本的規律,選擇控制外國承包商內部收益率的因子,並構建新的產品分成模式。通過實際項目數據對新的產品分成模式進行檢驗,比較分析,驗證新模式對原油價格波動適應性,對資源國資源的保護程度。
  6. Firstly, some factors such as the cost of the project, the protection of the enviroment, the revenue of the project and the dialectical relationship between these factors and the plan is discussed. secondly, " the unitary principle " is applied to set up a unitary evaluting system ; " the all - sidedness principle " is applied to have a comprehensive evaluation ; the qualifative analysis method and quantitative analysis are connected to be applied in the work to ensure the accuracy of the research work. 3. by inducing the key factors, quantizing the datas of input and output and the methods of operational research the plans evaluation, a evaluating model is stroke up to test vary plans

    2 、建設線路方案技術經濟評價各指標與評價體系的建立運用「統一的原則」 ,即進行本次綜合評價時,必須設定統一的評價指標體系,以客觀反映各不同方案的特點,便於進行比選;運用「全面性的原則」 ,即指標的設定要兼顧各個方案、兼顧結果與過程、兼顧規劃武漢理工人學碩士學位論文控制與近期建設,並要覆蓋城市規劃、交通改善、投資、建設可能性、環境等各個方面;運用「定性與定量相結合的原則」 ,即可以定量表述的內容盡量用定量指標來反映並建立數學模型,但是規劃方案的比選,亦需要定性的分析和判斷,因此指標體系中也納入了定性分析的內容。
  7. The paper describes the design process of libya western pipeline project, involved in the selection of pipe wall, stress analysis, anchor design, hydrotechnological protection and pipeline construction in right of way area, introduces the design characteristics different from the domestic pipeline design and construction

    摘要介紹了利比亞西部管道工程線路設計中管子壁厚選擇、應力分析、固定墩設計、水工保護、試壓介質、作業帶布置等方面的設計內容,指出了該工程線路設計與國內其他管道設計的不同點,設計經驗可為以後的類似工程設計提供借鑒。
  8. The reactor protection system reliability analysis is the indispensable branch of the model of probabilistic risk assessment of daya bay npp. the completion of this project will consummate the model of probabilistic risk assessment

    反應堆保護系統可靠性分析是大亞灣核電站的pra模型不可或缺的部分,該項工作的完成將使得pra模型更加完善。
  9. According to the result of the overall planning of containable utilization of water resource of shandong province during the initial period of 21 - centrury and the planning of urban water resource of the south - to - north water transfer project of shandong province and combining with the situation of the south - to - north water transfer project and through ample investigation and analysis, the paper evaluates comprehensively the quality and quantity of water resource of shandong province and points out the mail existing problems in the development and utilization and management and analyzes and forecasts scientifically the supply and demand situation of water resource of shandong province at the situation of different planning level year and different guarantee rate and advances the basic thinking, aim, task and requirement for solving the shortage problem of water resource of shandong province through comprehensive and systematic analysis from six aspects including water resource development, utilization, harnessing, d istribution, save and protection according to economic and social continuable development ' demand to water

    本報告根據《 21世紀初期山東省水資源可持續利用總體規劃》和《山東省南水北調城市水資源規劃》成果,結合南水北調工程情況,通過大量調查分析,全面評估了山東省水資源的質和量;指出了開發利用和管理方面存在的主要問題;科學分析和預測了不同規劃水平年、不同保證率情況下的山東水資源供需狀況;根據經濟社會可持續發展對水的需求,從水資源開發、利用、治理、配置、節約和保護六個方面進行了全面系統的分析,提出了解決山東省水資源緊缺的基本思路、目標、任務和要求。
  10. The research on corrosion of pre - stressed concrete bridge is a very complex project, the research involve the theory of pre - stressed concrete engineering, electrochemical mechanism, structural durability analysis, theory of control and etc. due to this reason, the research on this field is rare, and most relevant research is mainly on the development of pre - stressed concrete engineering, structural electrochemical mechanism, the method of monitoring, corrosion protection of service structure and structural durability analysis separately

    預應力混凝土橋梁的腐蝕研究是一項跨學科的課題,牽涉到預應力混凝土工程、電化學腐蝕、結構耐久性分析以及控制理論等多個方面。由於課題的復雜性,目前針對性的研究較少,絕大部分的相關工作主要集中於預應力混凝土工程的研究發展、結構電化學腐蝕機理及檢測方法的研究、在役結構的防腐蝕研究、結構的耐久性研究等幾個獨立的方面。
  11. According to the provisions of the cooperation agreement, the project proponents in hong kong should submit to the civil engineering department and the environmental protection department information on the project generating the dredged materials, the scale of the dumping operation and the statutory analysis of the contents of the materials

    按照《合作安排》訂定的原則,香港的工程建設者必須向土木工程署及環境保護署提交產生廢棄物的工程概況資料、傾倒作業的規模、成份法定分析等。
  12. Preliminary analysis and studies on the application of the river improvement techniques to the downstream serpentine channel of lihe river section in luanhe - tianjin water diversion project are made, and then the improvement plan for the downstream channel is explored through the development and application of both the technique of the concrete mats and the technique of geosynthetics mattress placed for the protection of the high and steep side slopes of the downstream channel of lihe river

    摘要針對引灤工程黎河下游多彎曲型河道採用的治理技術措施進行了初步的應用分析探討,並通過對黎河下游高陡邊坡防護中採用的模袋混凝土技術及軟體排技術進行的深入開發應用,探索了黎河下遊河道的治理方案。
  13. Based on the relay analysis and relay configuration of the yuncheng power network relay protection we drew out a project. in narrow sense, it gives equipment a right protective action. in broad sense, it works out a systemic of relay protection that answers to the change of yuncheng power network equipment and setting manner

    基於運城電網的繼電保護分析及整定配置,狹義的說就是給出每一個設備正確的保護動作性能,廣義的說,就是編制一個系統方案,以適應運城電網本身的設備及運行方式的變化,從而達到保護配置與選型、電網結構與運行整定的辨證統一,最大限度保證電網安全穩定運行和可靠供電。
  14. In this thesis we gave the advisable security requirements to the agent business of the industrial and commercial bank of shijiazhuang through the attack path analysis and the threatening elements analysis. moreover we designed the project of the security protection for the agent business by using the various security equipments such as vpn, firewall, ids, security management center, security kernel, antivirus equipment and so on. by the way, we made some suggestions in the aspect of the security management

    筆者通過對石家莊市工商銀行中間業務現狀的分析,採用「安全攻擊路徑分析」和「安全威脅因素分析」方法對該行中間業務的安全威脅進行了詳細的分析,提出了適當的安全需求,採用多種安全設備如vpn設備、防火墻、 ids 、安全管理中心、安全內核、防病毒等,設計出了保護中間業務的技術安全防護方案,並提出了安全管理方面的措施建議,最後,給出了保證中間業務正常運行的安全服務方案。
分享友人