protection works 中文意思是什麼

protection works 解釋
保護工程
  • protection : n 1 保護,保衛,防禦,掩護,包庇,照顧 (from; against)。2 保護者,防護物 (against); 〈美俚〉...
  • works : 的印表機描述格式
  1. Principles of treating the works of applied art as the objects of copyright protection

    實用藝術品納入著作權對象的原則
  2. With the rapid development of urban construction, the protection of water environment is more and more important and the waste water treatment establishment has been gradually completed. and it brings a lot of data of sewage pipe network and appurtenant works

    目前我國城市建設發展迅速,城市水體保護越來越受到重視,相應的污水處理設施也越來越完善,污水管網及其附屬設施的信息量越來越大。
  3. Six foundation works : first, projects to prevent flood, avoiding huai river overflow again ; second, projects of comprehensive traffic, perfecting the highway, railway, waterway and aviating traffic network ; third, ecological environmental protection project to improve peoples living conditions and strengthen environmental ecological construction progressively ; fourth, construction of " digital fuyang ", realizing datamation of product design, automation of production process, and electronization of commercial market ; fifth, sincere project of fuyang, advancing all kinds of sincere institutional improvement of same trade, forming morals based on sincerity, and personal integrity ; sixth, talents market project, developing human resources diversely

    六項基礎工程:一是防洪保安工程,切實根除淮河心腹之患;二是綜合交通工程,完善公、鐵、水、空綜合交通網路;三是生態環保工程,改善人居生活條件,加強環境生態建設;四是數字阜陽工程, .逐步實現產品設計數據化、生產過程自動化、營銷商務電子化;五是誠信阜陽工程,推進各類同業誠信制度建設,形成誠信為本、操守為重的社會風尚;六是人才強市工程,多方位開發人力資源。
  4. The protection of historical buildings works as a basilic tache in urban history conservation. the paper study on the selection and control between listed buildings and cultural relic buildings, and new uses for old buildings in u. k. all of these will help on use for reference of our urban history conservation

    本文通過對英國登錄建築與我國文物建築保護在確認與保護控制方面的比較研究,同時針對我國對待大量性的地方風土建築保護方法單一的現實問題,研究分析了英國歷史建築保護靈活多樣的再利用設計方法,為我國城市歷史保護提供若干可供借鑒的理論與方法。
  5. Ced requested csce to provide adequate evidence on the legality of the source of materials. csce produced a letter showing that the materials came from the flood protection works contractor

    土木工程署要求中國建築證明該批石料來源的合法性,該公司遂出示一封信件顯示有關物料來自進行東涌河治理工程的承建商。
  6. In september 2003, ced s contractor, china state construction engineering ( hk ) ltd ( csce ), approached rural committee s flood protection works contractor to inspect the materials of the stockpile to see if the materials were acceptable for use in ced s project

    今年九月,本署承建商中國建築工程(香港)有限公司(中國建築)與該名受聘于東涌鄉事委員會的承建商接觸,以檢視該批石料是否適合土木工程署工程之用。
  7. The concrete abatise groups frame as an advanced technique is used in flood protection, river regulation and bank protection works

    混凝土榪槎群框架結構是防洪、治河、護岸工程中出現的一項新技術,針對其水流特性的基礎性研究還很不足。
  8. Therefore we should choose length, width, height and interval of frames according to water height and demand of velocity. the results can be used for reference to the design of bank protection works

    隨著l h 、 b h 、 a h的增加,框架群后對應點垂線平均流速的減速率也逐漸增加,保護區長度、寬度也不斷增加,因此,應根據不同的水深和減速率要求拋投相應長度、寬度、高度、間距的框架群。
  9. The structure of prestressed anchor - rope and groundsill is one of the most effective sheathing works, it is used wildly in some slop protection works. the structure is made up of prestressed anchor - rope and groundsill. the combined structure can utilize the latent energy of rock or soil mass

    預應力錨索地梁結構是一種極其有效且正推廣應用於各工程部門的支擋防護體系。該結構由預應力錨索和地梁共同組成。
  10. On 18 september 2003, ced s consultant inspected jointly with the contractor the pebbles stockpiled near hau wong temple at tung chung and was advised that the materials belonged to a construction company carrying out " flood protection " works for the stream

    土木工程署的工程顧問,在二三年九月十八日聯同承建商檢視堆存於東涌侯王宮附近的卵石時,獲告知該等物料屬一間在東涌河整治河道的建築公司所有。
  11. Aiming at the 28km long river regulation and protection works on fuyuan reach where the river evolutions are complicated and the dimensions of control works are difficult to calculate, this dissertation is to study three - dimensional numerical analogue not only under natural conditions but also under ten regulation schemes, using the river sediment quasi - two - dimensional model associated with the river sediment plane two - dimensional model and the river three - dimensional model

    針對江道演變復雜,工程布局及控導工程結構尺寸難以計算的撫遠28公里長江段的防護整治工程,按天然情況和10個不同整治方案利用河流泥沙準二維數學模型、河流泥沙平面二維數學模型和河道三維水流數學模型結合進行三維整體的數值模擬。
  12. For example, two environmental seminars were held in september 2005 under the programme which featured environmental management, environmental performance reporting, environmental auditing and environmental protection works in hong kong

    當中包括於2005年9月舉辦兩個環保講座,內容包括環境管理環境工作報告環境審核的概念及香港環境保護工作。
  13. E associated works including at - grade roads, drainage, sewers, watermains, slope stabilization and protection works, traffic aids, street lighting, electrical and mechanical works, traffic control and surveillance system works, fire services main, irrigation system, hard and soft landscaping, fire hydrants and emergency crossing

    進行相關的地面道路排水及污水渠輸水管斜坡鞏固護坡電氣及機械園景建築及種植花木緊急過路處工程設置輔助交通設備交通管制及監察系統裝設街道照明設備安裝消防水管街井頭灌溉系統。
  14. Erosion protection works

    防止侵蝕工程
  15. Slope surface protection works

    斜坡護面工程
  16. Village flood protection works

    鄉村防洪工程
  17. Construction supervision on foundation treatment for jiujiang city s flood - protection works

    九江市防洪工程基礎處理施工監理
  18. Prh tenants required to carry out fire protection works before retrofitting the balcony of their units with windows

    公屋住戶在露臺加裝窗戶前須進行防火工程
  19. Tin shui wai development - village flood protection works for sheung cheung wai, phase 2 - construction of interceptor drains

    天水圍發展計劃上璋圍鄉村防洪工程第2期敷設截流渠
  20. The panel discussed papers on sil re. methodology for the evaluation of economic internal rate of return, configuration of sil, protection works for north hong kong island line, job opportunities to be created and examples of eirr calculations

    事務委員會討論南港島鐵路的文件中有關經濟內部回報率的評估方法南港島鐵路的規劃北港島線的路線預留工程所帶來的就業機會,以及經濟內部回報率的計算實例等事項。
分享友人