  1. Grade separation of light rail at tuen mun pui to road

    分隔主要輕鐵及路面交匯處
  2. Extension of sui wo road from fo tan road to au pui wan street and from au pui wan street to kwei tei street

    將穗禾路由火炭路延申至背灣街,及由背灣街至桂地街
  3. The light rail track diversion works were carried out to facilitate the light rail grade separation works at pui to road

    輕鐵路軌改道工程是配合杯渡路架空輕鐵路軌工程而進行,以便騰出空間興建輕鐵高架橋。
  4. 2. you should attend the scheduled appointment at the driving services section, 19 pui ching road, homantin, kowloon for a simulator test to determine your fitness to drive

    請你于指定日期及時間前往九何文田培正道19號運輸署駕駛事務組接受模擬駕駛測試,藉以確定你是否適合駕駛車輛;
  5. Enquiries about the driver improvement scheme can be directed to citizen s easy link 1823 or in writing to the driving services section, transport department, 19 pui ching road, homantin, kowloon

    查詢如欲查詢有關駕駛改進計劃的詳情,請致電政府熱線1823或致函九龍培正道19號運輸署駕駛事務組。
  6. The girl, hui pui - yee, left her boarding school at nam long shan road in aberdeen in the evening of march 19 but failed to return afterwards. the staff of her school reported the case to police on the next day

    女童許佩儀自三月十九日晚上離開香港仔南朗山道的寄宿學校后,便告不知所蹤。學校職員于翌日報警求助。
  7. By mid year these works should have been completed west of pui to road

    預計至今年中,工程會延伸至杯渡路的西面。
  8. The improvement works will include widening at ho pong street and pui to road junction

    改善工程也包括擴闊河傍街及杯渡路交接處。
  9. Widening of existing roads and junctions at tuen mun heung sze wui road, yan ching street, pui to road and ho pong street

    擴闊現時屯門鄉事會路、仁政街、杯渡路及河傍街的路面及交接處。
  10. Pui to road, tuen mun, grade separation project the contractor is carrying out piling works east of tuen mun pui to road to divert the existing tracks

    承建商現正在杯渡路以東進行工程,主要是樁柱工程,並因應工程的需要進行輕鐵路軌改道。
  11. Shortly after 9. 15 pm, a light goods vehicle ( lgv ), driven by a 21 - year - old man, was travelling along tuen mun sze wui road towards pui to road

    下午約九時十五分,一輛由一名二十一歲男子駕駛的輕型貨車正沿屯門鄉事會路往杯渡路方向行駛。
  12. To tie in with the grade separation works of light rail, a section of light rail tracks at pui to road has been temporarily closed until the works are completed at the end of 2003

    配合架空輕鐵路軌工程,屯門杯渡路一段輕鐵路軌已經暫封,直至二零零三年底工程竣工為止。
  13. At junction of tuen mun heung sze wui road and pui to road, each carriageway approaching the junction will be widened to four lanes and one additional lane will be provided at the exits of the junction

    在屯門鄉事會路及杯渡路交接處,將所有駛向該交接處的行車線擴闊至四線,亦在駛離該交接處的各出口多增一條行車線。
  14. In addition to exhibition panels detailing the projects, light rail is also displaying two models that feature the two tin shui wai new extensions and the tuen mun pui to road grade separation project

    展覽內容除了展出多幅附有細致照片及詳細介紹各項工程的展覽板外,更展出杯渡路架空路軌工程及天水圍新支線工程的模型。
  15. For return trip, walk along the maclehose trail section 5 and take the bus route no. 72, 81 or 86b at tai po road shek lei pui reservoir bus stop to depart

    回程時可沿麥理浩徑第五段步行至大埔道,在石梨貝水塘車站乘搭72 , 81及86b號巴士離開。
  16. Silvermine bay, the local beach, is just a five - minute stroll east along the coastal road - but far better to catch a bus or pedal a rented bicycle four kilometres west to discover true solitude at the delightful pui o beach. this beach not only attracts picnickers but also a herd of water buffalo that wanders from the nearby rice fields at sundown to cool off in the surf

    上岸後向東走約5分鐘便到達銀礦灣海灘你亦可乘巴士或租一輛單車往西走,約4公裡外,就是貝澳海灘,那裡水清沙幼,不單吸引遊人暢泳野餐,就是附近農家的水牛也會在日落後聯袂下水,一洗整天的疲勞。
  17. Temporary bus routes 505 and 506 commence service on 14 july to tie in with the grade separation works at pui to road a section of light rail tracks at kin on will be temporarily closed starting from 14 july as works begin at pui to road. light rail will introduce two temporary bus routes - bus routes 505 and 506 - for passengers affected by the closure

    配合九廣鐵路公司架空輕鐵路軌工程進行,屯門杯渡路一段輕鐵路軌將由七月十四日開始暫時封閉,輕鐵將增設兩條臨時巴士線- 505及506線,為受影響的乘客提供服務。
  18. 1 on leaving princess margaret road flyover, keep left to join sheung hing st. and then turn right to join pui ching road w b, turn left at its junction with waterloo road w b

    1經公主道天橋后,靠左出常興街,轉右入培正道,再左轉窩打老道西行往西隧。
  19. The entire project is expected to finish at the end of 2003. at that time passengers will be able to transfer to west rail at light rail san fat stop. traffic flow at pui to road will also be improved by up to 40 %

    工程於二零零三年底完成後,乘客將可在輕鐵新發站轉乘西鐵,而杯渡路附近路面的交通容量可增加達百分之四十。