rail carrying capacity 中文意思是什麼

rail carrying capacity 解釋
鐵路輸送能力
  • rail : n 1 (圍欄等的)橫木,橫檔;(釘帽架等用的)橫條,欄桿,扶手;〈pl 〉圍欄。2 軌道;鋼軌;鐵路;〈...
  • carrying : adj. 1. 裝載的。2. 運送的,運輸的。n. 1. 運送,運輸。2. 【紡織;印染】墊紗,給線。
  • capacity : n 1 包容力,吸收力,收容力。2 容積,容量;【電學】電容,負載量。3 能力,才幹,本領;性能,機能。4...
  1. The mathematics model among the time of sky window, carrying capacity and traveling speed is made in this paper. " v - mode sky window " and " plumb sky window " is deeply researched, the influence rule is found, and the conclusion is made. in addition, the paper discusses the feasibility of large maintenance machinery in rail whirl trunk, put forward the construction condition, the measure and attentive proceeding

    論文主要針對大型機械施工,通常採用的「 v型天窗」和「垂直天窗」 ,分別從它們各自對線路通過能力和列車旅行速度兩個方面,通過建立天窗時間與能力扣除和速度系數之間的數學模型,對其進行了深入的討論和研究,並最終找到了它們之間的影響規律,得出了結論。
  2. 2. present the characteristics of carrying capacity on mode of separating rail infrastructure from operation to show that traditional calculation methods of carrying capacity cannot adapt the new situation

    ( 2 )提出網運分離條件下的線路通過能力具有的特點,並分析了傳統通過能力計算方法在「網運分離」條件下的不適應性。
  3. 4. present the concept of carrying capacity under the condition of separating rail infrastructure from operation and establish the calculation model of several kinds of capacity which are carrying capacity, minimum carrying capacity, restrictive carrying capacity, golden time carrying capacity, rush hour carrying capacity and usual time carrying capacity

    ( 4 )提出了「網運分離」條件下線路通過能力的概念,建立了計算「網運分離」條件下線路通過能力、最小通過能力、限制通過能力、黃金時段通過能力、高峰時段通過能力、平緩時段通過能力的計算模型。
  4. Mr yeung said following the completion of the mid - life train refurbishment programme in december 1999, east rail s carrying capacity has been increased by 15 %

    楊啟彥又表示,隨著列車翻新計劃於一九九九年十二月完成,東鐵的載客能力提高了百分之十五。
  5. " this was due in large part to the substantial investment we have been making to enhance our productivity, by completing both refurbishment of our entire east rail fleet of trains and installation of an automatic train protection signalling system on the same line, " he said, adding both measures would increase east rail s passenger carrying capacity by 38 %

    他說:有此佳績,主要是因為我們致力提升生產力,並為此作出重大投資,包括全面翻新東鐵車廂,以及在東鐵安裝列車自動保障信號系統。這兩項措施使東鐵的總載客能力提高了百分之三十八。
  6. Based on the analysis of urban rail transit train routing and the relative factors, this paper argues that the adaptability of train carrying capacity is one of the sufficient conditions for adopting unconventional train routing

    摘要對城市軌道交通列車交路方案及選用時考慮的因素進行了分析,提出通過能力是否適應是採用特殊交路方案的充分條件。
分享友人