rail joint 中文意思是什麼

rail joint 解釋
鋼軌接頭
  • rail : n 1 (圍欄等的)橫木,橫檔;(釘帽架等用的)橫條,欄桿,扶手;〈pl 〉圍欄。2 軌道;鋼軌;鐵路;〈...
  • joint : n 1 接合,榫接合處,接合點。2 【解剖學】關節。3 【植物;植物學】節。4 【電學】接頭。5 【建築】接...
  1. Finite element stress concentration analysis of rail joint bolt

    鋼軌接頭螺栓的有限元應力集中分析
  2. Contract cc - 604 is awarded to costain - china harbour joint venture for the construction of the west rail depot buildings at a contract sum of hk $ 693 million

    Cc - 604是為西鐵興建車廠大樓,合約價值六億九千三百萬港元,中標公司為高捷達- -
  3. Rail movement joint

    路軌活動接合件
  4. As the bolt tension increase, the tension of rail web, stress of joint bar and stress of joint bolt would increase accordingly, but the displacement of rail would become smaller

    螺栓扭矩增大,接頭區鋼軌軌腰拉力、夾板應力、螺桿內應力都會增大,而鋼軌位移會隨著螺栓扭矩的增大而減小。
  5. Through planning innovation and design, to optimize regional functions and layout, rationalize rail transit networks, give prominence to functions of the guogongzhuang region as transfer joint of the south - western part of downtown, to strengthen function of public center of the area surrounding guogongzhuang station in its region, improve traffic conditions, service functions and environmental quality in this region, and set tod developmental pattern centering on rail transit

    挖掘車輛段用地和郭公莊站周邊可開發土地的效益,通過上蓋開發及車站周邊土地與車站的協調整合,促進土地的集約高效利用,提高軌道交通和周邊土地的綜合效益;同時,通過引進先進的設計理念,創造以人為本的,安全、便捷、舒適、高效的公共交通條件,完善換乘環境。
  6. Cast welded rail joint

    鑄焊鋼軌接頭
  7. The joint expert group had confirmed the strategic value of the rail link, and a study was now underway to establish the technical feasibility and commercial viability of erl

    聯席專家小組已確定鐵路線在策略上的價值,而有關方面現正進行研究,以確定區域快線在技術上是否可行及是否合符商業效益。
  8. A joint planning group has also been set up to examine the feasibility of the guangzhou - shenzhen - hong kong express rail link

    政府亦成立了聯合規劃小組,以探討在中港兩地建造廣深港高速鐵路的可行性。
  9. Contract cc - 603 is awarded to sun fook kong joint venture for the construction of the 8 - storey west rail headquarters building, which is located close to the new kam sheung road station in kam tin

    的合約是興建位於錦田的西鐵總部大樓,大樓樓高八層,毗鄰錦上路站,中標公司為新福港聯營公司。
  10. Development of vibration - reducing fishplate technique used in rail joint and its use

    鋼軌接頭減振夾板技術的發展及應用
  11. Bridge rail joint

    橋式鋼軌接頭
  12. The structure, the form and the function of the rail joint is summarized systematically in this paper. at the same time, the defect and disease of rail joint is also introduced

    本文較系統地總結了鋼軌接頭的構造、形式、功能,並對接頭區的缺陷及接頭病害作了簡單的介紹。
  13. The construction contracts for the southern section ( tai wai to shek mun ) and the northern section ( shek mun to wu kai sha ) of ma on shan rail were awarded to necso - china state joint venture at a price of about hk $ 3, 300 million

    馬鞍山鐵路南段(大圍至石門)和北段(石門至烏溪沙)的土木工程合約同時由力豪-中建聯營投得,兩份合約總值港幣三十三億元。
  14. The dynamic interaction between vehicle and track is one of fundamental problems among railway wheel / rail contact transporting system, it directly constrains the increase of railway running speed and load - carrying. the paper presents the computer simulation on the wheel / rail impact response at a rail joint. the results of the the simulation are compared with that of the experiment, and the model is validated

    本文在建立車輛軌道系統有限元模型的基礎上,著重對車輛通過軌道接頭處引起的沖擊問題進行了計算機模擬,並與車輛軌道系統現場實驗測得的數據進行了對比,驗證了有限元模型的正確性,進一步分析了軌道系統的動態響應,為提高車輛軌道系統的動態性能提供有價值的數據。
  15. As the analysis shows that stress of the outside joint bar of rail is higher than that of the inner joint bar when a wheel rolls over the rail joint. furthermore the change of bolt tension has great effect to the stress distribution and stress level of all parts of rail joint

    分析表明:接頭受力時,鋼軌外側夾板的應力水平比內側夾板的應力水平高;在受力條件相同的情況下,螺栓扭矩的變化對接頭各部件的應力分佈及應力水平有較大影響。
  16. The new model is built according to the real size of rail joint by finite element software ansys, thus can analyze the stress of all parts of rail joint

    該模型是利用有限元軟體ansys ,根據接頭的實際尺寸建立實體模型,可以對接頭各部件進行細致的應力分析。
  17. Insulating materials of insulated rail joint - test methods

    絕緣軌道接頭的絕緣材料.試驗方法
  18. 1 insulating materials of insulated rail joint - test methods amendment 1

    絕緣軌道接頭的絕緣材料.試驗方法
  19. After studying the former static calculation method of rail joint, a new calculation model of joint is presented in the article

    在與以往接頭靜力計算方法進行比較后,本文提出了一種新的接頭計算模型。
  20. In this paper we present improved draft of joint bar in the base of the analysis of rail joint. the draft is reasonable for it can make the stress evenly when a wheel rolls over the rail joint

    同時,本文根據對夾板的應力分析提出了改進的接頭夾板方案,認為該方案能使夾板均勻受力,在設計上是合理的。
分享友人