rail section 中文意思是什麼

rail section 解釋
鋼軌斷面
  • rail : n 1 (圍欄等的)橫木,橫檔;(釘帽架等用的)橫條,欄桿,扶手;〈pl 〉圍欄。2 軌道;鋼軌;鐵路;〈...
  • section : n 1 (外科、解剖的)切斷;切割;切開。2 【外科】切片,【金相】磨石。3 (果子的)瓣。4 【數學】截...
  1. The section of rail from tai wai to hung hom will still be constructed as planned. we have yet to receive considered views from kcrc on this

    由大圍至紅?的一段將仍按計劃興建。政府仍待九鐵公司就以上方案提出意見。
  2. In order to guarantee high - speed train running safe and stably, the safety reserve must be enough for the stability of high - speed railway over - section continuously welded rail ( cwr ) track

    為了保證高速列車安全、平穩地運行,高速鐵路跨區間無縫線路的穩定性必須有足夠的安全儲備。
  3. Essential strategic transport infrastructure, including central - wan chai bypass, island eastern corridor link, road p2, north hong kong island line, and connection for the fourth rail harbour crossing section of the shatin to central link

    建造必需的策略性運輸基礎設施,包括中環灣仔繞道、東區走廊連接路、 p2路、北港島線,以及沙田至中環鐵路線過海線段(第四條過海鐵路)的接駁道路
  4. It is proposed that the lrt system will adopt a standard rail gauge, power supply by overhead wires, main low - floor vehicles in six axes, one or two cars in one train set during the initial stage of revenue service, two or three cars in one train set in the later stage, 90m platform length, certificate payment system, type - b right - of - way on at - grade section, and signalling control for priority passing at intersections, etc

    建議採用之輕軌系統為標準軌距,架空線供電之大部分低底板輕軌車輛,每列車以二輛編組營運,月臺設計長度為60公尺,以付費證明系統收費,平面段采b型路權,交叉路口以交通號志管制,給予優先通行權。二線合計之建設成本,以89年幣值估算,約需新臺幣131億元。
  5. Many engineering pairs such as the wheel-and-rail combination described in section 8. 2. 1 generate elliptical contact areas.

    工程上的許多運動組合,諸如821節中所描述的車輪與鋼軌組合,都產生橢圓接觸面。
  6. Surveying and designing for vertical and horizontal section in wuhan no. 1 rapid rail transit engineering

    利用竣工測量資料更新城市矢量地形圖的方法探討
  7. This paper summarizes main research means for plane and vertical section ' s design criteria of high - speed wheel / rail railway line, and carries through simple appraisal for all kinds of research means in the end

    對高速輪軌鐵路線路平縱斷面設計標準的主要研究方法加以總結分析,對相關研究方法進行了簡單的總結。
  8. Existing high - speed ' s temporary criterion in china aim at high - speed wheel - rail railway simply, but plane and vertical section ' s design criteria for maglev railway which run at over 350km. p. h still have no criterion to comply with

    我國現有的京滬高速鐵路暫行規范,只是針對時速在200 350公里的高速輪軌鐵路,而時速在350公里以上的高速磁懸浮鐵路的平縱斷面設計標準還沒有可以依據的規范。
  9. Based on the integrated debugging drill management experiences of guangzhou metro for the modified project of line 2, the first operating section of line 3 and the university - town section of line 4, the paper analyzes and discusses the management mode of the multi - line integrated debugging drill in urban rail transit, and demonstrates that the application of project integrated management is effective in large - scale integrated debugging drill of urban rail transit

    摘要系統地總結廣州地鐵2號線調整工程、 3號線首通段、 4號線大學城專線同時開通前的綜調演練管理經驗,通過對城市軌道交通系統的多線綜調演練管理模式的分析和探討,證明項目集成管理在城市軌道交通大規模綜調演練中的應用是可行有效的。
  10. Hong kong section of guangzhou - shenzhen - hong kong express rail link

    廣深港高速鐵路香港段
  11. Many engineering pairs such as the wheel - and - rail combination described in section 8. 2. 1 generate elliptical contact areas

    工程上的許多運動組合,諸如8 2 1節中所描述的車輪與鋼軌組合,都產生橢圓接觸面。
  12. Vehicle - km other than tram and light rail vehicle obtained from ttsd traffic census section

    其他類別的車輛行駛里數由運輸署之交通及運輸調查部提供。
  13. It will share tracks with the kowloon southern link now under construction, the section of the existing west rail between nam cheong station and kam sheung road station, and then the northern link before branching out from san tin for connection with the mainland section of the erl at the boundary

    香港段將與興建中的九南線現行西鐵介乎南昌站及錦上路站一段和北環線共用路軌,然後再由新田分支至邊界與內地段連接。
  14. To tie in with the grade separation works of light rail, a section of light rail tracks at pui to road has been temporarily closed until the works are completed at the end of 2003

    配合架空輕鐵路軌工程,屯門杯渡路一段輕鐵路軌已經暫封,直至二零零三年底工程竣工為止。
  15. 2. acroding to real construction conditions of 150km track of section b26 - 1 on qin - shen passenger railway, the construction arrangement, scheme and task flow are summariaed for the construction of overinternal jointless rail on newly - built railway

    依據秦沈客運專線b26 - 1標段150km的正線軌道鋪設實際施工情況,對一次性鋪設跨區間無縫線路總體施工安排、施工方案和作業流程進行了總結。
  16. The railway development section continued its work on railway land issues, and the major clearance work for the west rail ( phase i ) has been completed

    鐵路發展組繼續處理與鐵路有關的土地工作。西鐵(第一期)的大型清理土地工作已經完成。收到的逾
  17. The construction contracts for the southern section ( tai wai to shek mun ) and the northern section ( shek mun to wu kai sha ) of ma on shan rail were awarded to necso - china state joint venture at a price of about hk $ 3, 300 million

    馬鞍山鐵路南段(大圍至石門)和北段(石門至烏溪沙)的土木工程合約同時由力豪-中建聯營投得,兩份合約總值港幣三十三億元。
  18. Analysis of abnormal wear of steel rail in curved section of railway

    鐵路曲線地段鋼軌不正常磨耗的分析
  19. In view of the research situation of the technologic and economic evaluation on the constructed program of the pacific road " section in the no : 1 route of wuhan city ' s light rail transit at present, especially the researchment on the trend of the route, the paper discussed detail research of the constructing plans by using various theories of fundamental construction econnmics, etc, based on the the general urban constructing plan of wuhan, etc. the qualitative analysis method and the quantitative analysis method are connected to be applied into this paper for the research work

    本文根據《武漢市城市總體規劃》 ( 1996 - 2020 ) , 《城市快速軌道交通工程項目建設標準》 , 《武漢市綜合交通規劃》 ( 1996 - 2020 )以及運籌學、技術經濟學、投資管理學、基本建設經濟學等原理和相關理論,對武漢輕軌交通一號線太平洋路段這部分關鍵建設線路方案的比選進行了論述及細化研究。本文採用定性分析與定量分析相結合的方法,對軌道線網初始方案進行測試與調整;對多個線路走向的初始方案進行篩選,確定兩個備選方案,再對軌道交通線網優選方案進行綜合比選評價,最終得出軌道交通線網的推薦方案,增強了建設方案的科學性和合理性。
  20. Type selection of shield machines for large cross - section underground railway tunnel on straight rail transit line in beijing

    北京鐵路直徑線大斷面地下隧道盾構機選型研究
分享友人