rail test 中文意思是什麼

rail test 解釋
鋼軌試驗
  • rail : n 1 (圍欄等的)橫木,橫檔;(釘帽架等用的)橫條,欄桿,扶手;〈pl 〉圍欄。2 軌道;鋼軌;鐵路;〈...
  • test : n 1 檢驗,檢查;考查;測驗;考試;考驗。2 檢驗用品;試金石;【化學】試藥;(判斷的)標準。3 【化...
  1. Few test runs will take place on kcr east rail in the early morning of 10 april after the close of traffic between sha tin and tai po market stations

    廣東鐵將於四月十日凌晨在沙田至大埔墟車站之間進行試車。
  2. But there has been no track spectrum that can reflect the real condition of chinese rail for a long time. many organizations have put forward some conclusions of track spectrum, but there is no unite conclusion at present in china. power calculation of locomotive and experiment on the rolling and vibration test - bed have to adopt foreign track spectrum

    但長期以來沒有能反映我國實際軌道狀況的軌道譜,雖然國內很多機構都已提出一些軌道譜的結論,但尚沒有統一性的結論提出,機車車輛動力學計算和滾動振動試驗臺試驗均只有採用國外軌道譜。
  3. " the test will be useful for us to confirm the performance of the new pantograph of our trains, " a spokesman for kcr east rail said

    九廣東鐵發言人稱:試車所得的資料將有助於我們確定新列車集電弓之功能。
  4. The study on non - contact and automatical measuring system for measurement of wheelset geometric parameters is very important, which can not only help to improve the quality of wheelset test, to increase the development of digital - railway, but also can give much information on studying wheel - rail geometric contract

    輪對幾何參數的非接觸自動測量,可以提高車輛段輪對檢修的質量,有助於實現數字化鐵路的目標,而且可為研究輪軌接觸幾何關系提供重要的數據。因此,對輪對自動測量系統的研究,具有重要意義。
  5. Numerical analysis of eddy nondestructive test for surface hardness of rail

    渦流無損檢測淬火鋼軌踏面硬度的數值分析
  6. Containers must be redelivered clean. note permissible weight limits for road and rail transport. the technical details of 1cctank container for yellow phosphorus : working pressure : 0. 4mpa test pressure : 0. 6mpa external dimensions ( lx w x h ) mm : 6058 x 2438 x 2591 maximum gross : 30480 kg stacking height : 9 x 30480 kg insulation

    這種罐箱容量大,密封性能好,使用周期長,抗振強度高,不易被損壞,操作方法實用;而我國現在使用的250l塑料桶,其回收或處理成本高,且污染環境,所以iso1cc黃磷罐式集裝箱是一種理想的替代塑料桶的貯運設備。
  7. Test method for measuring shear properties of structural adhesives by the modified - rail test

    用變形鋼軌試驗測定結構膠粘劑的剪切特性的試驗方法
  8. Verification regulation of 3000kn rail static bending test machine

    3000kn鋼軌靜彎試驗機檢定規程
  9. Using the time dependent finite element method of age - adjusted effective modulus, the author calculates the deflection which is induced by shrinkage and creep in a continuous rigid frame bridge of urban rail transit, and further compares with the site test result, the conclusion is very meaningful

    摘要採用按齡期調整有效模量的時變分析有限元法,對城市軌道交通預應力混凝土連續剛構橋的收縮徐變變形進行了理論計算,並與實測結果進行了對比分析,結果表明理論計算是可信的。
  10. About thirty passengers in the train were injured. the fire services department arrived shortly to rescue the passengers. . " the above formed the scenario of a joint exercise held at kcr hung hom station by kcr east rail and various emergency services departments to test the effectiveness in carrying out emergency evacuation and rescue operation

    名手持鐵棒的男子于上午十時三十分突然跳軌,被當時一輛正駛進紅?車站月臺的列車撞倒,列車即時脫軌並撞向月臺邊,首兩卡車嚴重受損,車上約有三十名乘客受傷,消防人員於事發后隨即抵達現場,進行緊急救援工作及協助乘客離開現場
  11. The test data indicates that the silencing cover which is set on the rail has gotten good silencing effect

    測試數據說明在道軌上加設消聲套后取得了良好的消聲效果。
  12. In this thesis, a parameterized maglev train and maglev rail models have been set up in simpack. these models are based on real information of the qiingcheng test maglev rail and tr08 in shanghai. the simpack is a kinematics and dynamics simulation software with multi - body system

    論文在德國航空航天局開發的simpack多體系統模擬平臺上,以青城山試驗示範線和上海tr08實際工程情況為研究背景,根據實際結構情況建立了參數化的磁浮列車及其磁浮線路的模擬模型。
  13. Standard test method for in - plane shear properties of polymer matrix composite materials by the rail shear method

    軌道剪切法測定聚合母體組合材料平面剪切特性的標準試驗方法
  14. Aiming at the coal under the building, rail and water, difficultly - mined coal and the side of strip mine, hardly mined, but it is utilization for the ucg study on field test of air coal gas, water coal gas, rich oxygen coal on the side of strip the side of strip mine mine of fu xin, using the ucg for the mineral well, getting the method for building stove of ucg, obtain different coal gas group and heat value for the different gasification craft high volatile, multiple thin coal seams on the side of strip mine are suitable to underground coal gasification to produce middle low heat value gas

    摘要針對「三下」煤層,難採煤層,復雜煤層以及露天邊坡剩餘的煤炭資源,並工開采不經濟或難以開采,可利用煤炭地下氣化將這些殘余資源得以回收利用,試驗利用礦井式煤炭地下氣化方式,對阜新礦露天邊坡進行了空氣煤氣、水煤氣、富氧煤氣的工業性試驗研究,通過煤炭地下氣化工業性試驗,得出在露天邊坡礦井式氣化建爐方式,不同氣化工藝的煤氣組分,熱值。
  15. " the findings of the test runs will be useful for us to confirm the performance of the new control software of the ktt through train, " a spokesman for kcr east rail said

    九廣東鐵發言人稱:試車所得的資料將有助於我們確定九廣通直通車所採用的新控制軟體之功能。
  16. We can design & manufacture whole assembly line and test equipment of window rail

    可完成:全套門窗導軌裝配及檢測工裝設備的設計製造。
  17. Cranes ; stability for non rail - mounted mobile cranes ; test loading and calculation

    起重機.無軌安裝移動式起重機的穩定性第2部分:試驗
  18. East rail is now carrying out test runs until mid december 2002 to make certain its trains will run smoothly under the new ato system. over this period, non passenger trains run in both directions between hung hom and lo wu stations during non - peak hours. two trains also run two nights every week after the close of operations

    測試的列車將不接載乘客,于非繁忙時間在紅?至羅湖車站之間行走;此外,測試期間,于每星期的兩個晚上收車后,會有兩列列車來回行走各站進行測試,以確保日常的服務不受影響。
  19. Few test runs on kcr east rail will be carried out in the early morning after the close of traffic between tai po market and lo wu stations

    廣東鐵將於八月六日凌晨在大埔墟至羅湖車站之間進行試車。
  20. Kowloon - canton railway corporation s west rail and light rail divisions carried out their first joint emergency exercise this morning ( 7 december ) to test the responsiveness of their rescue teams during an emergency

    十二月七日)進行首次聯合緊急事故演習,測試救援隊伍遇有緊急事故時的應變能力。
分享友人