reclamation site 中文意思是什麼

reclamation site 解釋
填築區
  • reclamation : n. 1. 收回的請求;收復,取回;矯正;馴服;教化。2. 開墾,填築。3. (廢物的)翻造,再生;回收;土壤改良。
  • site : n 1 地點;位置;地基。2 場所,現場。3 遺址。4 【計算機】網站,站點〈電腦網路用戶的網站地址〉;萬...
  1. Construction of sewers and the north - east river wall and site formation work at tai o, the road improvement works for cheung chau old town, and the reclamation, road and drainage works at yung shue wan, lamma island are in progress

    大澳污水渠與東北河堤建造工程及地盤平整工程、長洲舊墟道路改善工程,以及南丫島榕樹灣的填海、道路及渠務工程,均在進行中。
  2. Except for the new hung hom bay reclamation, there has so far been no statutory planning restriction on the heights of residential buildings in the hung hom area, including the site of harbourfront landmark

    除了紅?灣新填海區外,紅?地區,包括「海名軒」所在地段,到目前為止並沒有對住宅樓宇高度作出法定的規劃限制。
  3. The purpose of this web site is to share my experiences with workers in any country on water logging in agricultural lands, irrigation induced soil salinity, subsurface drainage for agriculture ( horizontal and vertical ), reuse of groundwater, ground - water hydraulics, ( geo ) hydrology, rainfall and surface runoff relations, reclamation and improvement of water logged saline, salty, sodic alkaline, and acid sulphate soils, plant growth, crop production and responses as well as statistical analysis consisting of segmented linear regression and cumulative frequency distributions

    描述:探討農業耕地的水澇問題;灌溉導致的土壤鹽堿化;地表灌溉;地下水的再利用;地下水水力學;雨水與水流失的關系;淺地表排水;土壤開墾及水澇,酸性,堿性土壤的改良;片段線形回歸和累積頻數分佈的統計分析等。
  4. The central reclamation phase i provided the site for the airport railway hong kong station

    中環填海計劃第一期提供用地興建機場鐵路香港站。
  5. To add " recently " after " grave concerns expressed " ; to delete ", and for the effective conservation of " after " the queen s pier in central " and substitute with " and their discussion on the four proposals put forth by the government for dealing with " ; to delete " adopt " after " immediately " and substitute with " make reference to " ; to delete " and to undertake to adopt conservation in - situ, minimal interference, preservation of the original condition and protection of the heritage environment as the principles for formulating " after " in 2000 " and substitute with " to formulate " ; to delete " implementing " after " expeditiously " and substitute with " implement " ; to add " reasonable, practical and " after " the most " ; to delete " in - situ, including proper adjustments to the current works projects and designs of future projects to avoid damaging the existing structure of the queen s pier " after " preserving the queen s pier " ; and to delete " of works projects on the present site of the queen s pier " after " minimize the impact " and substitute with " on the central reclamation phase iii works which are underway, and to commence as soon as possible discussion involving public participation on the site and design concept for the relocation of the queen s pier "

    在"鑒于"之後加上"近期"在"社會各界"之後刪除"已經"在"強烈關注, "之後刪除"為有效保護" ,並以"以及就政府提出處理"代替在"皇后碼頭"之後加上"的4個方案作出討論"在"立即"之後刪除"采納" ,並以"參考"代替在"中國文物古跡保護準則, "之後刪除"並承諾以原址保護減少干預保存原狀保護文物環境等作為準則, "在"盡速實施"之後加上"最合理可行及"在"最有效的"之後刪除"原址保留" ,並以"保存"代替在"皇后碼頭方案, "之後刪除"包括妥善調整現有工程及設計未來工程,以避免對皇后碼頭現有結構造成損害,從而將皇后碼頭現址因" ,並以"讓正在進行中的中環第三期填海"代替及在緊接句號之前加上" ,並就重置皇后碼頭的選址及設計意念盡快展開有公眾參與的討論" 。
  6. A prime waterfront site of about 40 hectares at the southern tip of west kowloon reclamation has been earmarked for development into a world - class arts, cultural, commercial and entertainment district

    政府計劃把西九填海區南端一幅面積約四十公頃的海旁土地,發展為匯聚藝術、文化、商業及娛樂設施的世界級文娛藝術區。
  7. The planning and lands bureau launched the west kowloon reclamation concept plan competition on 6 april 2001 to invite conceptual proposals for the development of the 40 - hectare waterfront site at the southern tip of the west kowloon reclamation into an integrated arts, cultural and entertainment district

    規劃地政局於今年四月六日宣布展開西九填海區概念規劃比賽,徵求概念方案,以期將西九填海區南端一幅四十公頃海旁用地發展為綜合文娛藝術區。
  8. The planning and lands bureau launched the west kowloon reclamation concept plan competition on april 6, 2001 to invite conceptual proposals for the development of the 40 - hectare waterfront site at the southern tip of the west kowloon reclamation into an integrated arts, cultural and entertainment district

    規劃地政局於今年四月六日宣布展開西九填海區概念規劃比賽,徵求概念方案,以期把西九填海區南端一幅四十公頃海旁用地發展為綜合文娛藝術區。
  9. Reclamation, road and drainage works at yung shue wan on lamma island are also in progress. construction of the north - eastern riverwall and site formation work adjacent to lung tin estate in tai o is scheduled for completion in early 2002

    南丫島榕樹灣的填海、道路及渠務工程也在進行。大澳龍田?毗鄰的東北河堤建造工程及地盤平整工程,預定在二零零二年年初完成。
  10. For the project " reclamation works in north tsing yi ", some of the contaminants found within the site are classified as carcinogenic, eg. some heavy metals, pah and polychlorinated biphenyl ( pcb )

    至於「北青衣區填海工程」 ,在施工地點發現的污染物中有一些可被歸類為致癌物質,例如一些重金屬,多環芳香族碳氫化合物及多氯聯苯。
  11. 15 all waste materials, excluding river and pond sediment, shall be segregated into categories covering : excavated material or construction waste suitable for reuse on - site, reclamation or fill, construction waste for disposal at public dump or landfill, chemical waste, and general refuse

    除河流及塘底的沉積物之外,所有廢物應予分類,可包括:適合原地再用、用作填海或填料的挖掘物料或建築廢料;棄置於公眾傾卸場或堆填區的建築廢料;化學廢物;以及一般垃圾。
  12. Tsing yi north coastal road, castle peak road and fan kam road ), drainage improvement works in yuen long and shenzhen river, site formation, slope works, landfill, reinforced fill works, reclamation, and work on rock tunnels and caverns

    這些工務計劃包括了道路改善工程(例如青衣北岸道路、青山公路和粉錦公路) 、元朗及深圳河的排水渠改善工程、其他各類計劃的地盤平整及斜坡工程、填土及加筋填土工程、填海工程、開鑿巖石隧道及巖洞等。
  13. We have recently received news that on 15th july, a mid - level court in south korea ruled that the world s largest reclamation project, the 40, 100 ha saemangeum project on the west coast of south korea a site some four times the size of hong kong and supporting around 30 species of waterbird in internationally important numbers must stop, effective immediately

    世界自然基金會最近收到消息,指南韓中等法院在七月十五日裁定,終止全球規模最大,涉及范圍達40 , 000平方公里的南韓西岸新萬錦填海計劃。是次填海范圍是香港的四倍,扶養約30種具國際重要價值的水鳥品種,裁決即時生效。
  14. For the project " central reclamation phase iii ", the contaminated mud is disposed of at the east sha chau contaminated mud dump site

    在「中區填海第三期」工程項目中挖出的污泥,是會被棄置在東沙洲污泥卸置坑內。
  15. However the ongoing disturbance from construction and reclamation activities close to the main roosting site for the birds is of concern

    專家十分關注人類在這種雀鳥的主要棲息地附近不斷進行建築和填海工程,對它們造成的滋擾。
  16. The authors work out the re - use plan of the abandoned land resource of the mining area, which is integrated by afforestation of the branch path and the key scenic site, land reclamation and ecologic restoration of dump site of mining area, the high - quality production of nursery stock, forage grass, traditional chinese medicine and the green production, and the industry tourism and the eco - tourism

    摘要設計了集「礦區主幹道路、重點景區綠化、排土場復墾與生態重建、優質苗木生產、優質牧草生產、優質中藥材生產、綠色農產品生產、工業旅遊與生態旅遊」為一體的礦區廢棄土地資源再利用方案。
  17. The panel discussed wan chai development phase ii re. 439cl - wan chai reclamation phase 2 - consultants fees and site investigation

    事務委員會討論灣仔發展計劃第ii期,即有關灣仔填海工程第ii期439cl號工程計劃-顧問費用及地盤勘測。
  18. Fc approved a commitment to upgrade part of 343cl, entitled " central reclamation phase iii - consultants fees and site investigation ", to category a at an estimated cost of $ 35. 7 million in mod prices ; and retain the remainder of 343cl in category b, re - titled " central reclamation phase iii - engineering works "

    工務小組委員會通過一項承擔額,把386cl號工程計劃的核準預算費提高8 , 000萬元,即由25億6 , 400萬元增至26億4 , 400萬元(按付款當日價格計) 。
  19. South china transfer limited was granted a contract to build a station on a 2 - hectare west kowloon reclamation site, and has been in operation since december 1995. the station can process 2, 600 tons of waste a day

    該公司獲授合約于西九填海區興建面積達2公頃的廢物轉運站,已於1995年12月起投入服務,每日可處理廢物2 , 600公噸。
  20. Fenwick pier street eastbound and lung wui road eastbound between tim wa avenue and lung king street will be closed except access for the reclamation site office and fleet arcade. affected traffic will be diverted to use gloucester road and fleming road for wan chai north ; performing arts avenue northbound towards lung wui road will be closed except access for red cross headquarters

    除了前往填海工地辦事處及海軍商場的通道外,介乎添華道及龍景街的一段分域碼頭街東行及龍匯道東行將會封閉,前往灣仔北的車輛必須改行告士打道及菲林明道;
分享友人