relocation phase 中文意思是什麼

relocation phase 解釋
遷移階段
  • relocation : 變換布置
  • phase : n 1 形勢,局面,狀態;階級。2 方面,側面。3 【天文學】(月等的)變相,盈虧;【物、天】相,周相,...
  1. To add " recently " after " grave concerns expressed " ; to delete ", and for the effective conservation of " after " the queen s pier in central " and substitute with " and their discussion on the four proposals put forth by the government for dealing with " ; to delete " adopt " after " immediately " and substitute with " make reference to " ; to delete " and to undertake to adopt conservation in - situ, minimal interference, preservation of the original condition and protection of the heritage environment as the principles for formulating " after " in 2000 " and substitute with " to formulate " ; to delete " implementing " after " expeditiously " and substitute with " implement " ; to add " reasonable, practical and " after " the most " ; to delete " in - situ, including proper adjustments to the current works projects and designs of future projects to avoid damaging the existing structure of the queen s pier " after " preserving the queen s pier " ; and to delete " of works projects on the present site of the queen s pier " after " minimize the impact " and substitute with " on the central reclamation phase iii works which are underway, and to commence as soon as possible discussion involving public participation on the site and design concept for the relocation of the queen s pier "

    在"鑒于"之後加上"近期"在"社會各界"之後刪除"已經"在"強烈關注, "之後刪除"為有效保護" ,並以"以及就政府提出處理"代替在"皇后碼頭"之後加上"的4個方案作出討論"在"立即"之後刪除"采納" ,並以"參考"代替在"中國文物古跡保護準則, "之後刪除"並承諾以原址保護減少干預保存原狀保護文物環境等作為準則, "在"盡速實施"之後加上"最合理可行及"在"最有效的"之後刪除"原址保留" ,並以"保存"代替在"皇后碼頭方案, "之後刪除"包括妥善調整現有工程及設計未來工程,以避免對皇后碼頭現有結構造成損害,從而將皇后碼頭現址因" ,並以"讓正在進行中的中環第三期填海"代替及在緊接句號之前加上" ,並就重置皇后碼頭的選址及設計意念盡快展開有公眾參與的討論" 。
  2. In all, 10 000 vehicle journeys, 70 barge movements and 30 flights from kai tak to chek lap kok will have been made from the beginning of may until the scheduled end of the relocation in early august. about 6 000 new jobs will be created during the initial opening phase due to increased private sector participation and the introduction of competition in franchised services at the new airport

    事實上,由五月初開始,直至遷移計劃預計在八月初結束為止,在整個行動中,由啟德前往赤?角新機場的陸上交通工具,出動次數將高達1萬次,躉船和飛機的出動次數,則分別會有70次和30次。
分享友人