remaining duration 中文意思是什麼

remaining duration 解釋
尚需工期
  • remaining : 保持
  • duration : n. 1. 持久,持續。2. 持續時間,存在時間;期間。adj. -al
  1. Major indices include reserve, remaining oil, recovery, cementing quality, incremental oil from measures taken, revenue from measures, measure increment input & output ratio, valid period of measures, duration of investment return of measures, validity of measures and economic efficiency, etc. through scientific analysis and studies on stimulation measures taken in different geologic blocks, the most proper measure based on geologic condition under certain economic policies are found to guide and manage oilfield production so as to decrease risks of investment and improve economic benefit, there fore to maximize the benefit

    主要指標有儲量、剩餘油、采出程度、固井質量;措施增油量、措施收益、措施增量投入產出比、措施有效期、措施投入回收期、措施有效率和經濟有效率等。通過對全油田不同地質區塊所採用的各項增產措施進行科學的分析和研究,找出在一定的經濟政策條件下,針對不同地質情況,採用最適宜的增產技術措施,來正確指導和管理油田生產,減少措施投入的風險,提高經濟效益,實現效益最大化。
  2. Hunter ' s mark : the duration remaining graphic will now display properly for hunter ' s mark after it has been refreshed on a target, and will properly consume mana when recasting it to refresh its duration

    獵人印記:當重新上標記以後,圖標表示的持續時間將正確刷新,並且將正確消耗法力。
  3. Therefore some bond investors tend to reduce the duration, or the average remaining maturity, of their bond portfolio in times of rising interest rates

    因此,部分債券投資者在利息上升期間會嘗試縮短其債券組合的期限,亦即平均剩餘期限。
  4. At least, actual start date, actual finish date, percentage of completion, remaining duration, more than these 4 are required if necessary

    至少,實際起動日期,實際完成日期,完成百分比,剩餘工期。如必需,更多輸入。
  5. Displays actual information, including actual start date, actual finish date, percent complete, actual duration, remaining duration, actual cost, and actual work

    顯示實際信息,包括實際開始日期、實際完成日期、完成百分比、實際工期、剩餘工期、實際成本和實際工時。
  6. When you enter the actual duration of a task, microsoft project updates the actual start date, the percentage of the task that is complete, and the duration of the task remaining in the schedule

    輸入任務的實際工期時, microsoftproject將更新實際開始日期、任務的已完成百分比以及日程中任務的剩餘工期。
  7. Article 13 : the duration of validity of the exploration and survey permit or the mining permit upon the transfer of the mineral exploration right or mining right shall be the remaining time period of the duration of validity of the original mineral exploration permit or mining permit minus the year ( s ) during which exploration or mining has already been conducted

    第十三條:探礦權、采礦權轉讓后,勘查許可證、采礦許可證的有效期限,為原勘查許可證、采礦許可證的有效期減去已經進行勘查、采礦的年限的剩餘期限。
  8. Devastate : the duration remaining graphic will now display properly for sunder armor after it has been refreshed on a target by devastate

    擊毀:擊毀刷新的破甲能正確的現實持續時間了。
分享友人