request for test 中文意思是什麼

request for test 解釋
請求測試
  • request : n 1 請求,懇求,懇請;要求,需要。2 要求物,需要品,請求之事;請求文,請願書。vt (鄭重或正式)請...
  • for : FOR f o r = free on rail 【商業】火車上交貨(價格)。1 〈表示目標、去向〉向,往。 leave [sail] f...
  • test : n 1 檢驗,檢查;考查;測驗;考試;考驗。2 檢驗用品;試金石;【化學】試藥;(判斷的)標準。3 【化...
  1. This event was arranged in response to master s previous request to all centers in the world to prepare for emergency situations. seoul center has prepared many items to meet those needs such as blankets, raincoats, rainboots, medicine and equipment to move victims. we are now planning to purchase a ham radio system and an initiate is going to take a test to get a certificate allowing him to use the ham system

    這項活動的安排是響應先前師父的指示,要求全世界各小中心,對緊急情況有所防備,漢城小中心已經備妥了許多物品以應不時之需,例如:毯子雨衣雨靴藥品以及一些搬運傷患的用品,現在我們正準備要購買無線電系統。
  2. Conclusions as following have got through test study : ( 1 ) when impact compaction technology is applied to treat collapsible loess subgrade, the effect depth may be treated generally can not override 80 cm and impact compaction pass is optimum at 30 times. ( 2 ) for stratified impact compaction of subgrade, when compactness of each level reaches codeslstandards loose laying depth of 80 cm fits 40 impact compaction pass is the optimum combination of subgrade construction. when average compactness in each level reaches codeslstandards loose laying depth of 80 cm fits 30 impact compaction pass is the optimum combination o ( 3 ) the quality control method may request impact compaction pass as the main control index and at the same time the final division settlement is less than 10 % of total settlement as large area subgrade is constructed

    通過試驗研究主要得出如下認識:沖擊壓實技術處理濕陷性黃土地基時,其有效處理深度一般不超過80cm ,沖壓遍數以30遍左右為宜;對路基分層沖壓,在要求土體中各點壓實度均達到規范要求時,路基沖壓最佳組合為虛鋪厚度80cm 、沖壓40遍;在只要求土體平均壓實度達到規范要求時,路基沖壓最佳組合為虛鋪厚度80cm 、沖壓30遍;大面積施工時,質量控制方法可按照在以沖壓遍數作為主要控制指標的同時,要求最後10遍分計沉降量小於累計沉降量10 ;在施工單位自己購置沖擊壓實機情況下,與傳統施工相比較,沖擊壓實技術是一種既能節約資金又能大量縮短工期的施工方法。
  3. The paper proposed the multi - parameters automatic inspection system plan. it has designed the mechanical drive organization as well as the part localization and clamps, has carried on the theory and the experiment for the different parameter request measuring method feasibility analyzes, has designed the measuring system test and control hardware and software, has realized the automatic measuring function data storage and analysis, and so on

    論文提出了多參數自動檢測系統方案;設計了工件定位和夾緊機構以及機械傳動機構;對不同要求的對象參數的檢測方法可行性進行了理論與實驗分析,設計了檢測系統的測控硬體和軟體,實現了自動測量、數據存儲和分析等功能。
  4. The drill and petroleum extraction tools test - well is built in room, that not only can ensure that test environment meeting the test request but also is very convenience for equipment maintenance

    整個鉆采工具試驗井建在專用實驗室內,既可保證試驗環境符合測試要求,又可極大的方便設備維護。
  5. With phased array radar observing target ' s improvement of different performances of the aircraft, the deterioration of the working environment of radar and improvement of the radar demand request more and higher for putting forward the equipment of phased array radar video signal processing. the digital signal processing is all the time the developing direction of radar signal processing, its main shortcoming is that the increase processing precision, and the amount of information at the same time bring on the amount processing redouble, method to solve this problem is the real - time high speed digital signal processing system. presently multi - processors parallel processing is the focus of the field of high - speed real - time processing. this paper ' s background is the high - speed real - time signal processing of phased array radar. a parallel computing system designed with 4 adsp - 21060 analog device inc ' s dsp is presented. lt has fully utilized the dsp ' s characteristic to be supported the parallel computing, and formed a mes h architecture. this paper design and discusses this system in terms of design for test ( dft ) and real time operation system ( rtos ), and have put forward the new solution for the design and development of the high - speed real - time signal processing system. then, analysed the subject matter faced at the same time

    本文以高速實時相控陣雷達視頻信號處理為背景,提出了一種由4片ad公司adsp - 21060構成的并行計算系統。它充分利用了adsp - 21060支持多處理器并行計算的特點構成了一種網格結構,並且從可測性設計、實時操作系統角度對該系統進行了設計與討論,為高速實時信號處理系統的設計與開發提出了新的解決方案,同時分析了面臨的主要問題。本文首先分析了相控陣雷達信號處理單元的特點,然後針對適合於片間并行的adsp - 21060討論了并行計算結構,提出了一種採用四片adsp - 21060構成網格結構的信號處理平臺,分析了它的工作原理。
  6. For those who are overweight or obese and over 45 years of age, it would be wise to request a simple diabetes test from the doctor once a year

    歲又超重或者肥胖的人來說,一年進行一次簡單的糖尿病檢查是明智之舉。
  7. Responsible for c & b calculate and insurance and housing fund defray process, generate related data test and report per request

    負責薪酬福利的計算及保險、公積金的繳納,根據要求進行相關數據測算及提交報告。
  8. The clear west system engineer has been concentrating on follow the latest communication technical development application, the marketing troops of high character and customer keep close contact in the world, is satisfy the customer ' s various request. the company contracts for a calculator network engineering over a long period of time, the factory premises supervises and controls system engineering, control at gate, test frequently, the week boundary reports to the police system, public broadcast system, the small area intelligence turns construction, the fiber - optic 熔 connects the engineering technique strong item, the clear west embraces the customer ' s satisfaction always, is clear west of pursue for the standard, with borrow in the system to design, engineering implement of comprehensive advantage and extensive customer foundation, combine an actual circumstance and correspond standard combine, provide to slice actually viable technique project and system product most according to different customer ' s request, provide the best system solution for the customer

    明西系統工程師一直致力於跟蹤世界上最新的通訊技術的發展應用,高素質的營銷隊伍與客戶保持密切的聯系,為滿足客戶的各種要求.公司長期承包計算機網路工程,廠房監控系統工程,門禁,考勤,周界報警系統,公共廣播系統,小區智能化建設,光纖熔接工程技術強項,明西始終抱著客戶的滿意,才是明西的追求為準則,憑借在系統設計,工程實施方面的綜合優勢和廣泛的用戶基礎,結合實際情況和相應標準並,根據不同客戶的要求,提供最切實可行的技術方案及系統產品,為用戶提供最佳的系統解決方案
  9. The manufacturing sector, especially export - oriented manufacturing enterprises and merchants will have special orders at the request will be before the formal requirements under the single - first - out plant samples to test for the meet their requirements

    製造行業特別是出口型的生產企業,客商的定單都會有特殊的要求,在正式下單之前都會要求工廠先出樣品,以檢測是否滿足自己的要求。
  10. The modern automation testing system of radio frequency module can save a lot of design resources for the building of the automation testing system of power amplifier in the article. refers to ate ( automatic test equipment ), the paper introduces the performance and the index request of the present power amplifier module

    基於51單片機sst89v564rd以及可編程邏輯器件lc4256v - 75t176c ,測試單板和電流表採用了現代微處理器檢測與控制技術,它的開發與應用,使得功放模塊自動化測試系統功能更加全面,效率得到了有效的提高。
  11. Instead of 640 fibers, it realized the large area multi - object observation by use of 4 000 fibers. according the request of project, mechanical character, controlling and positioning method were firstly analysized. then through studying geometry modeling, convex hull, polygon collision test and other arithmetic, the positioning, controlling and collision test method are proposed which are suitable for radial coordinates unit

    本文根據工程的要求,首先對光纖定位裝置的機械特徵、控制方式、定位方法做了分析,然後通過研究現有的幾何造型、凸包構建、多邊形碰撞判斷等演算法理論,研究出適合極坐標運動單元的表示、控制、判斷方法,並最終在虛擬系統中實現了4000個光纖定位單元的存儲表示、定位控制、碰撞判斷(即實時監控) 。
分享友人