reservoir selection 中文意思是什麼

reservoir selection 解釋
產層選擇
  • reservoir : n. 1. 貯藏所;貯氣筒;貯水池,水庫;貯水槽,水槽;貯存器;貯油器,油筒,油箱;貯墨管;【解剖學】貯液囊。2. (知識、精力等的)貯藏,蓄積。vt. 貯藏;在…設貯藏所[貯水槽]。
  • selection : n. 1. 選擇;挑選;選拔。2. 拔萃;選擇物;精選物[品];文選。3. 【無線電】分離,(自動電話)撥號。4. 【生物學】選擇,淘汰。
  1. Selection and systematic integration of numerical models for water quality forecast in three gorges reservoir

    三峽水庫水質模型的選取和系統集成
  2. Selection on design scheme of flood - discharging and sediment - flushing tunnel of fenhe reservoir

    汾河水庫泄洪排沙隧洞設計方案優選
  3. Research on site selection of mine tailings reservoir based on gis

    以個舊錫礦某礦山為例
  4. Aim at ubiquitous parallel multi - reservoir structure in our country ' s basin, the universal objective function including coefficient bi embodying a spatial significance difference at different flood control points and variable ai denoting a selection of scheduling mode is established, which provide a valid intervenor interface for flood control consultation decision. according to the real - time requirement, a model of reservoir storage allocation is proposed, which embody basic idea of phasic compensation. passing the dynamic correction to cut down the disadvantageous influence that indetermination result in on the certain degree, joining together the step alternation solving method, this model can maximally consider bias of decision makers, ensure the rationality and practicability of the solutions

    針對我國流域中普遍存在的並聯庫群結構,論文提出包含不同防洪點重要性的系數_ i和選擇調度模式的變量_ i的通用目標函數,為防洪會商決策,提供了有效的人工干預介面,根據實時性要求提出動態分配防洪庫容的庫容分配方法,體現了相機補償的基本思想,通過動態修正在一定程度上可以削減不確定性造成的不利影響,結合分步迭代求解技術,能最大限度體現決策者的偏好,保障解的合理性和可操作性。
  5. ( 5 ) according as different dispatching results under different parameters combination of aertashi reservoir, taking into account hydraulic, energy, investment index etc, the characteristic water level of aertashi reservoir are selected by applying fuzzy optimal selection theory and grey relation analysis theory, and the optimal parameter combination is recommended

    ( 5 )根據阿爾塔什水庫不同參數組合情況下葉爾羌河流域水庫群調度結果,考慮水利、動能、投資等指標,運用模糊優選理論和灰色關聯分析理論對阿爾塔什水庫興利特徵水位進行了優選,推薦了最優參數組合。
  6. The application case, optimum reservoir planning selection of baimiao gas field, verifies that analytic hierarchy process is easily available indeed in operation by integrate qualitative and quantitative aspects

    以白廟氣田的開發設計方案為例,表明層次分析法是一種集成定量和定性因素的實用性很強的方法。
  7. Green choose from our wonderful selection of beauty spots that we have selected for your enjoyment. there are views of the sai kung peninsula, tai tam tuk reservoir and yung shue wan on lamma island

    以下為您精選的香港綠色景觀,分別是山頂西貢半島大潭篤水塘和南丫島榕樹灣,山光水色,令人眼前一亮。
  8. Basing on a petrophysical study this paper analyzes the genesis and electrical conduction mechanism of the low resistivity reservoirs to the west of daqing placanticline so as to provide an evidence for the selection of suitable reservoir parameter model

    在巖石物理研究的基礎上,分析了大慶長垣以西地區低電阻率油氣層的成因、導電機理,為選取適用的儲層參數模型提供了依據。
  9. According to the analyses of the research results about the feasibility of 4 - d seismic and the successful 4 - d seismic cases of foreign companies, the author put forward the suggestions for 4 - d seismic pilot area selection ; briefly analyzed the influential function of producing way on the seismic response ; utilized theory calculation, coring data analyses, and reservoir numerical simulation to define the fluid substitution effects on the p - wave velocity. through long time water driven to the reservoir, some of the properties and the log curves have changed, the author tried to find the variation rule of the reservoir and its effects on seismic velocity. the " blind point " in 4 - d seismic feasibility study both in china and overseas was found, that is the lack of consideration of the influence of physical property variation by long time water driven on the seismic response

    在深入分析國外四維地震可行性研究成果和成功實例的基礎上,提出了有利於水驅四維地震成功的工區優選條件;簡要剖析了各種開采方式及其對地震特性的影響;利用理論計算、巖心分析、油藏數值模擬三種方法確定了流體替代對縱波速度的影響;通過對長期水驅造成的物性參數、測井曲線以及油藏溫度和壓力變化規律的總結,分析了這些變化對地震速度的影響,指出了目前國內外水驅四維地震可行性研究中存在的盲區?沒有充分考慮長期注水造成的物性、溫度和壓力變化對地震響應的影響,完善了水驅四維地震可行性研究的內容;在考慮了這些變化因素后,高29斷塊水驅四維地震可行性研究結果表明:四維地震監測注水前沿可能要比監測油藏變化容易的多;以四維地震巖石物理可行性研究結果為基礎,提出了五個有助於突出四維地震造成的微小差異的途徑,為今後水驅四維地震研究指明了方向。
  10. Dam ' s type comparison selection in phase reinforcing project of pangzhuang reservoir

    龐莊水庫除險加固二期工程大壩壩型方案比較
  11. Comparison and selection of seepage prevention schemes in hengquan reservoir engineering

    橫泉水庫工程防滲方案比選
  12. A new matching method of well - log and seismic data is presented so that two - dimensional distributed seismic attribute can be used in 3d reservoir geological modeling. it is named vertical equivalence method. the seismic attribute classification method based on the geological properties in reservoir geological modeling, seismic wave skewness and kurtosis conception, and the rules of seismic time window selection and attribute analysis are presented

    提出了將二維分佈的地震屬性用於三維儲層地質建模的井震數據匹配地震屬性縱向等值法、基於儲層地質建模儲層地質屬性的地震屬性分類方法、地震波形偏度與尖度的概念、地震時窗選取準則和地震屬性分析準則,為在大慶油田開展儲層地質建模建立了可選的地震屬性參數表。
  13. The reservoir property and development status of medium - low permeable reservoirs in daqing oil field are different form the major reservoirs will have much error for polymer selection

    與主力油層相比,大慶油田中、低滲透率油層物性及發育狀況均發生很大變化,如果仍沿用主力油層聚驅的聚合物相對分子品質確定方法,必將會對聚合物相對分子質量的選擇造成很大的誤差。
  14. Based on the investigation of resident houses in taishun which was destroyed by shanxi reservoir earthquake and the site inspection of the destruction of building near epicenter, it is pointed out that the reason for severe seismic damage is that masonry - concrete structures built in recent years did not obey the rule of the code for seismic design of buildings [ 1 ], which mainly contains three aspects, first, the construction of wall was not consistent with the code, second, the design of structure was not reasonable, last, the site selection of base foundation was not good enough

    摘要通過對今年2月4日2月16日文成、泰順發生的珊溪水庫一系列地震中受災的民房破壞調查(現場勘察地震給震中附近的建築造成的破壞) ,筆者指出這次系列地震震害較重的主要原因是:近年農村新建的磚混結構沒有按《建築抗震設計規范》建設,主要有三個方面:其一,墻體違反規范施工;其二,結構設計不合理;其三,地基基礎選址不恰當。
分享友人