reservoir site 中文意思是什麼

reservoir site 解釋
庫址
  • reservoir : n. 1. 貯藏所;貯氣筒;貯水池,水庫;貯水槽,水槽;貯存器;貯油器,油筒,油箱;貯墨管;【解剖學】貯液囊。2. (知識、精力等的)貯藏,蓄積。vt. 貯藏;在…設貯藏所[貯水槽]。
  • site : n 1 地點;位置;地基。2 場所,現場。3 遺址。4 【計算機】網站,站點〈電腦網路用戶的網站地址〉;萬...
  1. Phenomenology research on deformation and failure modes of slopes composed of argillaceous limestone of the third number of badong group in new site of fengjie county of three gorges reservoir area

    三峽地區奉節縣城緩傾層狀岸坡變形破壞模式及成因機制
  2. Slope - bottom land transition zone was usually neglected in previous exploration but was favorite site of forming lithologic reservoir

    摘要坡窪過渡地區是已往勘探常被忽略的構造帶,但卻是巖性油藏形成的有利場所。
  3. In order to reduce the re - deposit volume of the dredged channel, the method must be based on decreasing the oncoming sediment, changing the mouth site, builting the sediment control dam and raising the reservoir level

    為了最大限度地減小疏浚挖槽的回淤量,必須依靠控制上游來沙量、調整入水口門位置、加設防淤堤及提高庫水位等手段,而不能通過調整挖泥槽寬度、位置及數量等措施來達到目的。
  4. In order to cooperate with the construction of sanxia reservoir, there are totally five times excavation have carried through since 2000 in the large area of baotaping site, and numbers of tombs and relics of tang and song dynasty were discovered as the valuable material for restituting the historical visage of sanxia area in tang and song dynasty

    為了配合三峽庫區的建設,從2000年起對寶塔坪墓地開始了大面積的發掘,前後共發掘五次,發現了大批唐宋時期的墓葬和遺物,為復原三峽地區唐宋時期的歷史面貌提供了不可多得的材料。
  5. In 1970, the first desalination plant was built on castle peak road, near tai lam chung reservoir. this site was chosen because of its close proximity to the zhujiang river estuary, where the seawater was clearer and less salty. additionally, the desalinated water could be channelled directly to the nearby tai lam chung reservoir

    1970年首座海水化淡試驗廠于青山道大欖涌水塘附近興建,化淡廠興建地點,主要考慮到該地位於珠江出口,海水鹽份較低,水質較清,且鄰近大欖涌水塘,海水淡化后可直接輸往水塘等各因素。
  6. In addition, the article shows the possible site which maybe generate induced earthquake according to fault activity and the site where faults pass in reservoir region, reservoir depth and rock hardness etc

    另外,從庫區斷層活動性及斷裂所通過的位置、庫水深度及巖石堅硬程度等方面,分析出可能產生誘發該水庫地震的位置。
  7. As they were situated directly in the proposed reservoir site, they were resettled in tai long wan, a western coastal area of lantau island and a resettlement area in tsuen wan. others, whose land was included as part of the catchment area, or affected by the construction of the catchwaters, faced a different situation. among them, the residents of pui o including lo wei village and sun wei village, ham tin, law uk, san shek wan, upper cheung sha and lower cheung sha village, tong fuk and shui hou village suffered from disturbance to their natural water supply

    一些被興建引水道影響或被辟為集水區的村落,如貝澳老圍村、新圍村、咸田村、羅屋村、散石灣、長沙上村、長沙下村、塘福村及水口村,原來流經村落的河流及地下水源,因主要水流被引水道堵截,農田無足夠水灌溉,早造開耕嚴重不足,居民須往他鄉運水,以應付日常生活急需及維持灌田。
  8. Research on site selection of mine tailings reservoir based on gis

    以個舊錫礦某礦山為例
  9. The ground base of the newly added chute in 4 tailings reservoir at dexing copper mine is characterised by thick weathered layer, loose structure, fractured zone and landslip mass accumulation. as a result, the ground has a great subsidence and inefficient carrying capacity. in view of this, the grouting technology was adopted to reinforce the chute ground base. the on - site testing shows that the subsidence of the chute has been efficiently controlled and the carrying capacity of the ground base improved so that the stability requirement has been met

    潘洛鐵礦主要使用的采礦方法是淺眼落礦的全面法和留礦全面法. 23礦體160m以上礦段上部為氧化礦和風化巖層,形成擠壓爆破和鬆散巖石覆蓋下的放礦條件.介紹了無底柱分段崩落法在該礦體開采中的應用.實際使用獲得的各項技術經濟指標還比較理想
  10. Whereafter, based on the analysis on the flood influence for traffic lines, the research is centered on the following parts : firstly, the destroying modes, reasons and mechanism of flooded lines are discussed, and the frameworks and countermeasures of preventing and controlling hazards system are put forward ; secondly, the ways of region forecasting for the landslide are analyzed and the automation of landslide forecast for certain site through visual programming is realized. furthermore, the function of dynamic segmentation in arc view is made use of to realize the forecast result ' s visualization ; thirdly, the reasons and patterns of roadbed subsidence are discussed and the methods of forecasting subsidence based on the gm ( 1, 1 ) model are put forward. then the applications of the arcview software and its extended module on the study of roadbed subsidence are debates upon ; fourthly, an analysis on the sources of flood for traffic lines, which situate in the reservoir coverage area, is given

    接著,論文探討了山區交通線路災害的特點、分類、時間和空間分佈規律以及災害的防治原則和對策等;然後,以洪水災害對交通線路的毀壞為主線,重點研究和分析了以下幾個問題:第一,探討了洪水對交通線路的破壞方式,水毀原因以及水毀機理,並提出了交通線路水毀防禦系統框架和對策;第二,分析了雨季邊坡塌方災害的區段預測方法;通過可視化編程,編制了雨季邊坡塌方災害的工點預報程序,並結合arcview實現了預測結果的可視化;第三,對路基沉陷原因和模式進行了分析,並提出利用gm ( 1 , 1 )模型對路基沉陷區進行分析和預測,最後論述了arcview軟體及其擴展模塊在沉陷區研究分析中的應用;第四,對汛期庫區線路災害的原因進行了分析,並探討了利用數量化理論對路基防護工程抗洪能力進行預測的意義;第五,提出從風險的角度對交通線路的防災減災進行管理,對風險估計的相關問題進行了論述,並探討了交通線路水害危險區段的劃分問題。
  11. In the first part, we compute the site design flood of given design frequency ( 0. 01 %. 0. 1 %. 0. 2 % and 1 % ) using the design flood hydrograph. then we get the design reservoir inflow flood of the same design frequency by the resultant discharge method. according to the computing value we compare the site design flood and design reservoir inflow flood of different time interval

    本論文以廣西紅水河龍灘水電站為例,在第一篇中採用洪水過程線法計算了給定設計頻率為0 . 01 、 0 . 1 、 0 . 2和1的壩址設計洪水,並利用合成流量法計算了相應設計頻率的入庫設計洪水。
  12. The paper selected changtan reservoir in guangdong province as case study site, investigated the impacts of 4 upstream reservoirs on changtan reservoir ' s design inflow floods and explored changtan reservoir ' s flood - protection standards, regulating rules and potential for integrated water resources utilization after newly - constructed upstream reservoirs being taken into account

    論文以廣東省長潭水庫為研究對象,闡述了受人類活動影響的水庫設計洪水調度研究方法,研究了水庫在其上游修建了若干個中小水庫以後,其設計洪水調度所受的影響程度,分析比較了研究結果,探討了水庫在考慮上游多個水庫影響下的防洪標準、調度原則及水資源綜合利用特點。
  13. Abstract : bank slope sloughing is an important environmental geological problem, which not affects only the geological environment, but also the migration settlement loan, some villages in xiaolangdi reservoir area are planed to migrated to reservoir bank zone. through the prediction and evaluation of two new settlement site stability of the bank, it is shown that the bank slope stability is one of the important factors not to be ignored in the migration settlement plan

    文摘:庫區塌岸問題是大型水庫庫區重要的環境地質問題之一,它不僅影響到庫區地質環境的改變,還直接影響到該庫地帶的移民安置規劃,位於小浪底水庫庫區中部的小趙村、寧董晁村移民新址均規劃布置在濱庫地帶,通過對兩個移民新址區水庫塌岸的預測評價,說明水庫塌岸問題是濱庫地帶移民安置規劃不可忽視的重要因素之一
  14. Through reservoir prediction, it indicated that the reservoir in mainan structure and mopan - laowan buried structure which located in short limb and bottom wall were finely developed, this two areas were the primary area for the further exploration and drill site design in dachiganjing structural belt

    通過儲層橫向預測,發現麥南構造和陡翼斷層下盤的磨盤老灣潛伏構造儲層較發育,是大池乾井構造帶下一步勘探及井位部署的重點區域。
  15. Multifractal for structural planes in rock mass of dam site area of yujianhe reservoir, guiyang

    貴陽魚簡河水庫壩址區巖體結構面的多重分形
  16. 4 - d seismic is a kind of reservoir monitoring technique which acquires and analyzes multiple seismic surveys repeated at the same site during the period of production in order to image the changes in a producing reservoir. it utilizes the knowledge of seismology, petrophysics and reservoir engineering comprehensively. there are some important methods such as the repeatability of seismic acquisition and processing, time lapse seismic interpretation and analyses

    四維地震是在油藏生產過程中,在同一地方,利用不同時間重復採集的、經過互均化處理的、具有可重復性的三維地震數據體,應用時間差分技術,綜合巖石物理學和油藏工程等多學科資料,監測油藏變化,進行油藏管理的一種技術。
  17. In this connection, the study should further investigate how the use of the ex - detention camp site could be developed in association with the reservoir

    因此,這項研究應進一步探討羈留中心舊址可以如何與水庫一同發展。
  18. The former high island detention camp site and the high island reservoir are proposed as recreation area and inland water recreation area respectively in the preferred development option

    最可取的發展方案建議分別把萬宜水庫羈留中心舊址和萬宜水庫用作康樂區和內陸水上康樂區。
  19. Some problems and difficulties urgently to be solved in seismic research of high concrete arch dams were reviewed, including to find simple and practical methods for comprehensive analysis of dam foundation, dam body, and reservoir water, to work out rational safety evaluation criteria for high arch dams, to study the dynamic behavior of the strength of concrete materials, to develop the seismic input model of the dam - site river valley, and to explore aseismatic measures

    摘要綜述能對壩基、壩身與庫水綜合分析的簡單實用方法,合理的高拱壩抗震安全評價準則,混凝土材料強度的動力特性,壩址河谷地震動的輸入模型,抗震工程措施等高拱壩抗震研究中亟待解決的問題和難點。
  20. Based on the investigation of resident houses in taishun which was destroyed by shanxi reservoir earthquake and the site inspection of the destruction of building near epicenter, it is pointed out that the reason for severe seismic damage is that masonry - concrete structures built in recent years did not obey the rule of the code for seismic design of buildings [ 1 ], which mainly contains three aspects, first, the construction of wall was not consistent with the code, second, the design of structure was not reasonable, last, the site selection of base foundation was not good enough

    摘要通過對今年2月4日2月16日文成、泰順發生的珊溪水庫一系列地震中受災的民房破壞調查(現場勘察地震給震中附近的建築造成的破壞) ,筆者指出這次系列地震震害較重的主要原因是:近年農村新建的磚混結構沒有按《建築抗震設計規范》建設,主要有三個方面:其一,墻體違反規范施工;其二,結構設計不合理;其三,地基基礎選址不恰當。
分享友人