reservoir station 中文意思是什麼

reservoir station 解釋
水庫站
  • reservoir : n. 1. 貯藏所;貯氣筒;貯水池,水庫;貯水槽,水槽;貯存器;貯油器,油筒,油箱;貯墨管;【解剖學】貯液囊。2. (知識、精力等的)貯藏,蓄積。vt. 貯藏;在…設貯藏所[貯水槽]。
  • station : n 1 站,臺,車站;航空站,機場。2 派出所;署,局,所。3 【無線電】電臺,電視臺。 4 駐地,部戍地,...
  1. The following are the large projects undertaking by haifeng company : crude oil electricity plant project of north china oil field hydroelectricity factory, apartment ( 22 stories ) of yuanda real estate company of dalian shipping group, helios hotel of helios group in dalian development zone, tilt aqueduct bridge of shanxi hongqi reservoir ( total span : 267m ), supply and sale building and city construction building ( both are antique architectures ) of shanxi heyang city, sea drainage pipe of hainan fudao fertilizer factory ( 1520 ), 8 oilgas docks of hainan haiyan oilgas company, basha condensable gas transfer station of haiyan company, 10, 000m3 oilgas storage tank of arco company ( usa ) in hainan nanshan, gas pipe and fuel gas installation project of hainan nanshan electricity co., ltd, base and accessory project of hainan gas company, bei da huang cereal and oil market in harerbin, hainan cross island pipe, changhuajiang river pipe crossing project, taihangshan mountain earthwork project ( the 19th section of west - to - east gas transmission project )

    海南海峰公司承建大的工程項目:華北油田水電廠原油發電站工程;大連船泊集團遠達地產公司的遠達公寓( 22層) ;大連開發區香港太陽神集團的太陽神大酒店;陜西紅旗水庫斜拉渡槽工程(全跨267m ) ;陜西合陽供銷大樓及城建大樓(均為仿古) ;海南富島化肥廠排海管線( 1520 ) ;海南海燕油氣公司八所油氣碼頭;海燕公司白沙液化氣中轉站;海南南山美國阿科公司儲油氣萬立米大罐工程;海南南山電力股份有限公司天然氣管線及燃氣安裝工程;海南南海天然氣有限公司基地及配套工程;哈爾濱北大荒糧油批發市場;海南環島管線;昌化江穿越工程;西氣東輸十九標段,太行山土石方工程。
  2. The technical route and the investigation technique of the relevant investigation, the evaluation method for karst seepage from reservoir and the treatment principle concerned are discussed herein on the basis of the hydrogeological investigation made on the karst area of the interfluve on the left bank of the reservoir for soufengying hydropower station

    本文擬以索風營水電站水庫左岸河間地塊的喀斯特水文地質勘察為實例,對有關勘察工作的技術路線、勘察技術、喀斯特水庫滲漏評價方法及處理思路作相應的探討。
  3. Kuantien is easily accessible via provincial highway 1, lungtien railway station or the sun yat - sen freeway, making travel to and from the town hassle - free. local tourist attractions include wushantou reservoir, the national tainan institute for the arts, artifacts from the prehistoric black pottery culture, the lungtien distillery, and the wildlife preserve for the endangered pheasant - tailed jacana. but the most indelible image of a visit is the sight of people rafting through the water caltrop ponds in tungchuang and hsichuang villages

    四通八達的官田鄉有臺一省道鐵路縱貫縣隆田站中山高速公路貫穿其間,往返順暢,鄉內更有烏山頭水庫國立臺南藝術學院黑陶文化遺址隆田酒廠葫蘆埤水雉保護區等聞名的風景區,其中尤以東西莊地區的菱香舟影,名列新南瀛勝景之一。
  4. Nilometer is widely used in the system of automatic detection and automation in many water supply such as oil industry, chemical industry, metallurgy industry, electric power, irrigation works, reservoir, bulk plant, pumping station, towns water and so on. and it is a important tool in these fields

    水位、閘位計廣泛應用於石油、化工、冶金、電力、水利、水庫、油庫、泵站、城市供水等領域的自動檢測和控制系統中,是這些領域不可缺少的一種重要工具。
  5. The salt water system drawing for the kowloon south no. 2 pumping station and its reservoir andor the latest planning report would be useful to our understanding of the proposed salt water reticulation to the north of the development area via the pcwa. may we obtain a copy of them

    為了解經公眾貨物裝卸區連接發展區北面的擬議鹹水管道網,九龍南二號海水抽水站及其配水庫的鹹水系統繪圖及或最新規劃報告對我們甚為有用,可否給我們一份復本?
  6. To provide necessary data for design bypass pipe, an enlargement to bi liu river reservoir, the following problems have been studied by hydraulic model and theoretical analysis : the energy losses in water head of the bypass pipe system and of the flow - control valve and their scale effects, measurement and calculation of the discharge of the bypass pipe system during the bypass pipe system operation with and without the new water power station, the hydraulic characteristics of the water tunnel and draw - off pipe, the flow rate of the aqueduct bridge and the draw - off pipe and the water elevation of the flow in the aqueduct bridge during the old water power station operation with and without the new water power station

    大連市碧流河水庫供水工程取水頭部由引水渡槽、節制閘、進水閘、泄水閘等建築物組成。由於本工程場地條件限制,增設旁通管后布置非常緊湊,管道急轉角度大且轉彎距離較小,對于管內水流流態是否滿足要求,需要經過模型試驗進行論證,以確保工程的可靠性。旁通管具有上水與泄水要求,對其過流能力也要經試驗確定,為碧流河水庫增建旁通管設計提供依據。
  7. The power station is diversion type power station of low gate dam with a normal storage level of 1268. 0 m, a highest gate dam level of 31 meters and a reservoir capacity of 2, 974, 000 cubic meters, the length of diversion tunnel of which is 19. 57 kilometers, installed capacity is 360mw futang power station is constructed on the basis of deep and thick overburden, the foundation of which mainly consist of five overburdens which, in general, belong to multiple, complex foundation

    福堂水電站位於四川省阿壩藏族羌族自治州汶川縣境內的岷江河段上,電站為低閘引水式開發。正常蓄水位1268 . 0m ,最大閘高31m ,庫容297 . 4萬m ~ 3 ,引水隧洞長19 . 57km ,裝機360mw 。福堂水電站閘壩建於深厚覆蓋層基礎上,基礎主要存在五大覆蓋層,總體屬于多層復雜地基。
  8. Retrofit of nanshan reservoir power station in chen zhou city

    嵊州市南山水庫電站更新改造
  9. Based on the moveable - bed model tests and some relative studies, it is found that the proposal reservoir for the hongshiyan hydropower station will be a heavy deposit reservoir, its sand - flushing sluice could not effectively de - silt and serious hidden - troubles exist in its diversion tunnel

    摘要待建的紅石巖水電站水庫屬嚴重淤沙型水庫,通過動床水工模型試驗和有關研究分析發現,其沖沙閘排沙效果不理想,引水隧洞存在進沙嚴重的隱患。
  10. This included firstly the construction of a new reception tank and a pumping station at muk wu to strengthen the raw water reception capability. secondly, additional water mains were laid to strengthen the transfer between river indus pumping station with plover cove reservoir

    17億元改善東江供水計劃,第一部份在木湖興建一個新蓄水池及抽水站,加強輸入廣東省原水設備,第二部份是由梧桐河抽水站至船灣淡水湖興建輸水管,增加梧桐河抽水站抽水量。
  11. The second stage of the uprating engineering works were implemented after the signing of the agreement in august 1979 endorsing the planning report for the second stage extension of the dongshen water supply system. the main works were to extend the pumping facilities at matan, tongxia, zhutang, shaling, shanpu and yantian, and to increase the height of the main dam of shenzhen reservoir by 1 metre. the new works included the construction of a new pumping station - the dongjiang pumping station at the intake point at the riverbank of dongjiang to increase the volume of supply

    第二期工程於1979年8月簽訂《東江深圳供水工程第二期擴建規劃報告》協議后進行,主要是再擴大原工程在馬灘、塘廈、竹塘、沙嶺、上埔及雁田的抽水站,加高深圳水庫主壩1米,新建的工程則包括于新開河口興建東江抽水站,提高供水數量。
  12. Construction survey technology for upper reservoir of zhanghewan pumped storage power station

    張河灣抽水蓄能電站上水庫施工測量技術
  13. The optimized reservoir ope ration is simulated for baozhusi hydropower station in sichuan. the analysis resu lts prove the rationality, feasibility and practicality of the model

    採用解析法對主梁進行了撓度計算,與試驗數據進行比較並分析了計算結果,認為橋機主梁的主梁強度、剛度實時檢測、監控系統基本上是可靠的,主梁2基本沒有塑性變形。
  14. ( 2 ) theoretical analysis of optimal theory for cascade hydropower station applying decision support system to carry out rational river planning in stepped exploitation includes cascade station arrangement, selecting optimal parameters of indropower station, decision of stepped exploitation order and optimal dispatching for reservoir etc. for uncertain problems, decision support system only supplies an auxiliary decision to the decision maker, not taking the place of decision maker

    ( 2 )水電站優化調度的理論分析在梯級開發中應用決策支持系統進行合理的梯級規劃,包括梯級的布胃、水電站參數的最優選擇、梯級開發順序決策和水庫運行的優化調度等問題。在對不確定性問題上,決策支持系統給決策者只是提供輔助決策,而不是替代決策者。
  15. The reservoir of longtan hydropower station will inundate some areas of guizhou and guangxi provinces, with large inundation area and a lot of relocated people

    摘要龍灘水電站水庫淹沒涉及貴州、廣西兩省區,淹沒面積大、移民人數多。
  16. ( 3 ) after the analysis of the actuality of water resources, the requirement to water resources of every department, the basic situation of every reservoir and hydroelectric station, the optimal dispatching schemes of water resources are purposed, the simulation - optimal model of operation of reservoir system are established and solved by using man - machine dialog arithmetic

    ( 3 )在分析葉爾羌河流域水資源現狀、各部門需水資料、各水庫電站基本情況等資料之後,提出了葉爾羌河流域水資源合理調配的原則,在此基礎上建立了葉爾羌河流域水庫群調度模擬優化模型,並用人機對話演算法進行了求解。
  17. Reduction calculation method of reservoir station in heilongjiang province

    黑龍江省水庫站還原計算方法
  18. On the heavy silt - laden rivers, desilting at the water intake of hydropower station is a problem widely concerned not only for the large reservoir with high dam and high water head, but also for the runoff river hydropower station with lower water head

    摘要在多沙河流上,無論是高壩大庫的高水頭電站,還是低水頭河床式樞紐,電站進水口的取水排沙歷來是一個倍受關注的問題。
  19. By analyzing interval flood and cascade operation characteristics of the upstream yellow river basin, the influence of longyangxia reservoir operation mode in different states on gongboxia power station construction during flood period is studied

    分析區間洪水特性和黃河上游梯級運行特點,針對龍羊峽水庫實際運行狀況,分析不同狀態下的龍庫運行方式對公伯峽水電站的施工渡汛影響。
  20. Combined with the significant project - gongboxia hydro - power station construction, emphasized on construction during flood period of power station construction period, the climate character of the upstream of yellow river basin and the practice operation state of cascade reservoirs are analyzed, some problems in construction during flood period such as flood propagation time, interval flood discharge forecast, construction risk, flood period pre - alarm and longyangxia reservoir ' s function on construction of gongboxia are also studied, with an aim at presenting real interval flood forecast scheme and dispatching method, so as to provide technological support for gongboxia hydro - power station construction period

    本論文結合國家重點工程項目?公伯峽水電站的建設,以電站建設期施工渡汛為研究重點,從實施出發,分析黃河上游氣候特性和梯級水庫群的實際運行狀況,對施工渡汛中的主要問題?洪水流達時間、區間洪水預報、渡汛風險、汛期預警、龍羊峽水庫在渡汛中的作用等進行了比較全面深入的研究,目的在於提出可用於實際的區間洪水預報方案和調度方法,為公伯峽水電站施工期建設提供技術支撐。
分享友人