ring beam 中文意思是什麼

ring beam 解釋
環梁
  • ring : n 1 圈,環,輪;戒指,指環,耳環,鼻圈,鐲子(等);【運】吊環。2 輪狀物;【植物;植物學】年輪;...
  • beam : n 1 梁,棟梁,桁條;(船的)橫梁。2 船幅;(動物、人的)體幅。3 (秤)桿,杠桿,(織機的)卷軸,...
  1. Auto parts : fuel injection system ( valve follower, plunger piston and fuel injection needle, etc. ), power train ( gear, rolling bearing etc. ), piston parts ( packing ring, gudgeon pin etc. ), cam shaft parts ( pin, bush, oscillation beam and some hydraulic components etc. ), others ( gate lock, accouterment etc. )

    汽車零部件:燃料噴射系統(氣門挺桿) 、柱塞、噴油針等) 、動力傳動系統(齒輪、滾動軸承等) 、活塞部件(活塞環、活塞銷等) 、凸輪軸部件(銷、襯套、搖臂及部分液壓元件等)和其他部件(如門鎖、內飾等) 。
  2. Being lacking of understanding of behaviors of circular working shaft, the paper proposed theory about ring - beam ' s load - distribution calculations and analyzed the structural behavior of circular working shaft ( cws ) by the numbers from the standpoint of properties of structural style and stress incorporated with thoughts of shared load introduced to research of cws. first, regarding cws as structure of series of hypothetic horizontal circular rings and vertical beams, and considering cws ' s formation and development, the paper proposed load - distribution thoughts to solve cws ' s calculations. ring - beam calculation theory was put up and software cbtlmp1. 0 was worked out based on the conditions of external applied load shared by rings and beams, and of deformation conformity

    首先,本文提出用分載思想解決圓形工作井結構的計算分析問題,將圓形工作井結構看成是由一系列的假想的水平圓環和豎直梁組成的結構,考慮工作井形成過程及形成階段與項進階段的連續性,根據某一時刻相對于上一時刻外載增量由環與梁分擔、環與梁在交叉處變位增量一致的條件將環計算理論與梁計算理論結合起來,據此建立了環?梁分載計算理論並研製了環?梁分載計算分析軟體cbtlmpv1 . 0 。
  3. This system uses a ring structure instead of complex multiangular optics structure. stimulate raman scatter is used to combine laser beam and it also improve the quality of laser beam

    採用這個激光能量儲存環技術能提高準分子激光放大超短脈沖激光的效率,獲得高功率,高束質的激光輸出。
  4. Cooperative action between row of piles and ring beam during excavation procedure

    排樁與圈樑協同作用下考慮開挖過程的撓曲方程法
  5. Abstract : in this paper , the problems in collecting data of earth pressure are discussed on the basis of some real projects according to the author , the present way , in which earth pressure data are calculated completely from classics theory , is not practical a nonlinear method of row pile design , in which the cooperative action of ring beam are taken into account and the lateral pressure is calculated on the basis of the pressure of displacement earth are proposed

    文摘:本文從實例著手,分析了在土壓力取值上存在的問題,目前工程中完全按經典理論進行套算是不確切的;提出了排樁設計中應定量考慮圈樑的協同作用,側壓力按位移土壓力進行計算的非線形方法。
  6. Researches on ring beam retaining structure of deep foundation pit by spacial analytical method

    深基坑環梁支護結構空間分析方法的研究
  7. The factors affecting the spatial effects of the deep foundation pit are researched in detail with the mutual deformation analysis method. these factors include the plane dimensions of pit, ring beam, middle beams, corner braces, embedded depth and brace stiffness. the results are compared with those of two - dimensional analysis, and their differences and adaptability are clarified

    此外,本文還利用共同變形分析方法,對影響深基坑空間效應的諸多因素(包括基坑的平面尺寸效應、圈樑和腰梁效應、角撐效應、樁身插入深度和支撐剛度等)進行了深入探討,並與目前常用的平面分析方法做了比較,指出了兩者的區別及其適用性。
  8. Ring beam may control the top displacement of piles validly. it has affect on keeping buildings stabling around foundation pit

    圈樑可以有效地控制樁頂位移,可以起到維持基坑周圍建築物穩定的作用。
  9. Based on comparison of several technical schemes, the method of sand bedding pre - elevating and step water - filling pre - compressing is adopted. so the dissertation is consist of two parts : ( 1 ) the applicability study for the method of sand bedding pre - elevating and step water - filling pre - compressing, including numerical analyses for the thickness of sand bedding, the consolidation, settlement and stability of foundation, drainage, possibility of foundation liquefaction under seismic loading, et al. ( 2 ) monitoring at construction stage and checking the effect of foundation treatment, including the measurements of the settlement velocity and non - uniform settlement of ring beam under the tank, pore pressures and horizontal displacements in foundation, the pressure distribution at the bottom of oil tank and the strength increase of soils

    通過多種技術方案比較,最終選擇了技術先進的砂墊層預抬高分級充水預壓法,論文工作主要由以下兩部分組成: ( 1 )砂墊層預抬高分級充水預壓法的適用性研究,其中包括砂墊層厚度、地基沉降與固結度、地基穩定性、降水、地震作用下砂土液化的可能性等方面的計算分析; ( 2 )施工監測與地基處理效果檢驗,其中包括油罐環梁基礎沉降速率與不均勻沉降程度、各分級充水加載階段地基超靜孔壓與深層水平位移、油罐底板壓力分佈及地基土強度增長等方面的實測與數據分析。
  10. On the basis of the sufficient consideration of the interactions and mutual deformations among retaining structures, brace structures, ring beam, middle beams and foundation soil in the deep foundation pit system, the spatial mutual deformation analysis method for the deformation and stability analysis of deep foundation pit is proposed with the finite element method

    在充分考慮深基坑支護體系中支護結構、支撐結構、圈樑、腰梁和地基相互作用及共同變形的基礎上,本文利用有限單元法,首先建立了深基坑變形和穩定分析的空間共同變形正分析方法。
  11. As for the improvement of ductility of masonry structure and the aseismatic performance of building, several factors were discussed, which consisted of the layout of building plane and building elevation, the building level number and height, the layout of vertical wall and cross wall, thus enhancing the intensity of mortar, ring beam, constructional column and the placement of horizontal reinforcing steel bar

    從建築平面和立面的布局、房屋的層數和高度、縱墻和橫墻的布置、提高砂漿強度、圈樑和構造柱以及水平鋼筋的放置等多個方面來進行探討,從而改善砌體結構延性,提高房屋的抗震性能。
  12. The affect of top ring beam has not been thought highly at presenti which has been regarded as the safety measure. the whole retaining and protecting structure of piles in row and top ring beam is calculated by the method of cantilever beam, and the result is not reasonable obviously

    在當前的設計與施工中,樁頂圈樑的作用未引起足夠的重視,普遍將其視為安全儲備,而將排樁與圈樑的整體支護結構視為懸臂梁來計算的,這樣的計算結果顯然過于保守不盡合理。
  13. It is on condition of the retaining and protecting piles imitated by nylon sticks, the top ring beam imitated by steel board, the foundation wadded by sandy soil, and the sectional size and extra load changed

    本文試驗是以尼龍棒模擬支護樁,以扁鋼模擬樁項圈樑,採用砂土填築地基,通過變換圈樑的截面尺寸及堆載進行了八組試驗。
  14. It is best that the stiffness ratio of ring beam to pile is 2 to 3. we think over burying depth of piles is 30 % of the whole length when ring beam existing. but it is necessary to decide according to the quality of soil layers and types of piles

    圈樑與樁的剛度比為2 3為最佳,有圈樑時樁的入土深度可以考慮占總樁長的30 ,但需要根據具體的土層性質和樁的類型斟酌而定。
  15. Finally, an example of circular jacking pipe constructed by smw method was analyzed, cws ' s specificity of material zoning in circular direction was clarified. the paper ' s main research findings are to propose ring - beam load - distribution theory provide cws ' s calculation method and program software

    最後,對一個用smw工法建造的圓形頂管工作井工程實例進行了分析,闡明了沿環向材料分區時的工作井的一些特殊特徵。
  16. Interiorly, the uestc high power microwave laboratory has studied gyrotron since the late 1970s and reach advanced level internationally. magnetron injection gun ( mig ) provides the helical ring beam

    在國內,電子科技大學高功率微波實驗室自70年代後期起,也對迴旋管進行了大量的研究工作,並達到國內外先進水平。
  17. The stiffness ratio of ring beam to pile affects the maximum value of moment near the bottom of excavated pit

    圈樑的抗彎剛度與樁的剛度比對樁身彎矩特別是坑底附近的最大彎矩值也有很大影響。
  18. The test result makes known that ring beam and piles in row working as a whole is different from the state having no ring beam

    試驗結果表明,圈樑和排樁的協同作用使得樁身內力與變位明顯不同於無圈樑情況。
  19. It is the effect of ring beam in retaining and protecting mechanics properties for excavation that this paper focuses on. in this paper, there are eight groups tests

    本文所開展的試驗研究工作即是針對基坑支護結構中圈樑的剛度對整體支護結構的性狀影響。
  20. Deformation of the foundation is analyzed by using the in - situ data of the settlement of the oil tank ' s cone and the ring beam, and by considering the relationship between the settlement and displacement of the ring beam and foundation

    根據現場油罐錐面和環梁沉降觀測資料,以及環梁沉降與地基土沉降和位移的關系,分析了油罐地基土體的變形。
分享友人