risk error 中文意思是什麼

risk error 解釋
風險估計誤差
  • risk : n 1 風險,危險;冒險。2 【保險】(損失的)風險(率);保險金額;被保險人,被保險物。vt 冒…的危險...
  • error : n. 1. 錯誤;失錯。2. 謬見,誤想;誤信;誤解。3. 罪過。4. 【數學】誤差;【法律】誤審,違法;(棒球中的)錯打。adj. -less 無錯誤的,正確的。
  1. The risk of error can be reduced, he told internists attending a " multiple small feedings of the mind " hepatology update, by attention to specimen size and number of specimens

    錯誤的危險度可以減低,他告訴參加一個肝臟新知識體目為「思考多重微小量變」的會議的內科醫生們將重點關注放在取樣樣本的大小和數目上。
  2. The new ways that solve multiple objectives decision making under risk into probability permanent type : decision making diagram method, matrix analysis method, multiple objectives markov method, the shortest distance method, successive type variation multiple objectives decision making under risk method and fuzzy analysis decision making method. 3. the new modes that solve multiple objectives decision making under risk into probability interval type and uncharted type : weighted method and sorting method 4 the new repent average value criterion that handle multiple objectives decision making under risk into probability uncharted type and generalizing the criterions that have been used into one objective decision making under probability into uncharted type to multiple objectives decision making under probability into uncharted type. 5. giving the error analyses method and decision result regulating method that been used into multiple objectives decision making under risk

    2 、探討了『決策圖法』 、 『矩陣法』 、 『多目標馬爾科夫法』 、 『最小距離法』 、 『連續型變量的多目標風險型決策法』和『模糊分析決策法』等解決概率固定型的多目標風險型決策的新方法。 3 、探討了『加權法』 、 『排序法』兩種解決概率區間型和未知型的多目標風險型決策的方法; 4 、在概率未知型的多目標風險型決策中改進了『後悔值準則』 ,提出了『後悔均值準則』 ;並將單目標概率未知型風險型決策的準則推廣運用到多目標概率未知型的風險型決策中去; 5 、探討了多目標風險型決策方法誤差分析及決策結果值調整的方法。
  3. This paper presents a wider research field - risk analysis. through the study of the effects that threat factors and error factors impact on the flight risk and adjusting performance rules, the horizontal safe corridor, threat avoidance, vertical altitude real - time modification and the fastest trajectory programming are progressed

    總結前人在該方面的研究成果,提出一個更加廣義的研究角度? ?風險分析。通過對威脅因素、誤差因素對飛行風險的作用,調整性能準則而進行了水平安全走廊設計、威脅迴避、垂直離地高度實時修正以及最快速航跡規劃。
  4. A modified svm model, which can predict peak recognition theory, was proposed in this paper. this model can increase the weight of peak error in the loss function of structural risk minimization, thus improve prediction accuracy of hourly water demand peak

    本文提出一種能夠進行峰值識別的改進svm演算法,該演算法在結構風險最小化準則的目標函數中加大峰值誤差的權重,從而提高時用水負荷峰值的預測精度。
  5. Refractive error more than - 15. od, axial length over 29. 0mm, and age more than 45 years old are risk factors for the development of early myopic maculopathy

    近視度數超過- 15 . 0d ,眼軸長超過29 . 0毫米,且年齡超過45歲以上是產生黃斑部病變的危險因子。
  6. The system possesses the real time correcting function, which can avoid error accumulation and highly increase the forecasting accuracy ; ( 3 ) the flood control system can be multiple - scheme designed, that is, the control schemes can be designed in terms of different control ways for hydro - projects. simulated computation can be carried out to obtain multiple schemes that can be used by the leaders for decision making after risk and consequences estimation, so as to scientifically enhance th

    系統具有實時校正功能,可以避免誤差累積,極大地提高了預報精度; ( 3 )防洪調度系統可以進行多方案設計,即可以根據水工建築物不同的調度方式來設計調度方案,並進行模擬調度計算,最終生成多個方案,供領導決策,提高了防洪決策的科學性; ( 4 )系統採用的數據均建立在實時雨情、水情、工情和天氣預報等數據庫基礎上,預報、調度均能做到快速及時。
  7. Tracking error forecasts, risk attribution, beta analysis

    追蹤誤差預測風險歸屬beta分析。
  8. Topics include : the nature of risk, formal accident and human error models, causes of accidents, fundamental concepts of system safety engineering, system and software hazard analysis, designing for safety, fault tolerance, safety issues in the design of human - machine interaction, verification of safety, creating a safety culture, and management of safety - critical projects

    其主題有:危險的性質,突發意外事件和人類錯誤模型,意外事件的因素,系統安全工程學的基本理論,系統和軟體的危險分析,安全和容錯設計,設計安全的人機交互,安全確認,創造安全文化和管理安全危急工程。
  9. While problems from initializing the system can occasionally cause failures that the error isolation aspect can t buffer, this type of problem normally occurs immediately and is easy to catch during development, making it much less of a risk

    系統初始化時出現的問題可能造成錯誤隔離方面不能緩沖的錯誤,但是這種問題通常是立即發生的,並容易在開發時捕獲,使得它的風險降低了很多。
  10. But this result is not the best result relative to bayes error or risk. this paper introduces a face recognition method based on pairwise weighted fisher criteria

    但是這個「盡可能好的』 』分類結果對於它所對應的準則函數來說是最優的,但是相對于錯誤率或風險而言,它只是次優的。
  11. The data used in the risk assessment of regional natural disasters imply the information not only on time but also on space. when the spatial information of the data is incomplete, it is necessary to optimize the data in order to reduce the error of the assessment. in the counterpart of the paper in last issue of the journal the theoretical investigation of the problem was carried out and the imcomplete information occured in risk assessment of regionalnatural disasters were class ifiedinto two types with treatment of interpolation model and correcting model res pectively. the former model is for insufficiency of the data and the later is for the case in which the accuracy of the data is not enough. inthispaper, taking the flood sustained by rural area plant in hunan province as an example, it is explained how to use the models to calculate. the models are examined as well

    區域自然災害風險評估中所用的數據不僅具有時間的意義,而且具有空間的意義,當數據的空間信息不完備時,需要對其進行優化處理,以減小風險評估的誤差,作者在本刊上一期的一篇文章中已進行了這方面的理論探討,將區域自然災害風險評估中所遇到的空間不完備信息分為兩類,分別用插補模型和校正模型進行了處理,插補模型是針對空間數據缺失情況的,而校正模型是針對空間數據不符合精度需要情況的,本文以湖南省農村種植業水災為例,進一步說明如何應用這些模型來進行計算,並對其進行了檢驗
  12. This double error became an irresistible reality, and by one of the incomprehensible transports of youth, he bounded from his hiding - place, and with two strides, at the risk of being seen, at the risk of alarming valentine, at the risk of being discovered by some exclamation which might escape the young girl, he crossed the flower - garden, which by the light of the moon resembled a large white lake, and having passed the rows of orange - trees which extended in front of the house, he reached the step, ran quickly up and pushed the door, which opened without offering any resistance

    他的混亂思想告訴他如此,熾熱的心在重復。雙重的錯誤變成了一種不可抗拒的現實。年輕人在那種不可理解的熱情的驅動之下,他從躲藏的地方跳出來,冒著被人看到的危險,冒著嚇壞瓦朗蒂娜的危險,冒著被青年姑娘發現時失聲驚叫的危險,他三步兩步跨過那片被月光染成白色的花圃,穿過房子前面的那排桔子樹,跑到臺階前面,推開那扇毫無抗拒的門。
  13. Cutting the number of hours junior doctors work and providing them more rest breaks won ' t by itself reduce fatigue or the attendant risk of error, according to a study published ahead of print in occupational and environmental medicine

    依照在《職業與環境醫學》中列印前出版的研究,減少年輕醫生的工作時間,給他們提供更多的休息機會並不會自己減少疲勞或出錯的風險。
  14. We eliminates tedious manual checking with the accompanying risk of human error to significantly reduce the expensive consequences of incomplete, inaccurate and poorly coordinated production information

    我們可以消除繁瑣的手工檢查導致的人為錯誤帶來的風險,這樣很大程度上減少結果不完整,以及不準確、及不協調的產品信息。
  15. Chapter three discusses about the following error between norm index and three optimizing index funds. chapter four analyses the uncertainty risk of the expected profit ratio of these three optimizing index funds

    本文第三章和第四章則是選擇了三隻優化指數基金為研究對象,研究採取消極的投資策略的證券投資基金的分散化投資的風險問題。
  16. At last, the ability to prewarn the financial risk between the new financial prewarning model and the classic z - score model were compared in terms of first error ratio and second error ratio

    最後,本文利用測試集中樣本,將該模型與經典的z計分模型的預警能力從第一錯誤率和第二錯誤率兩個角度加以比較。
分享友人