road improvement 中文意思是什麼

road improvement 解釋
道路改善工程
  • road : n 1 路,道路;街〈略 Rd 〉;公路;行車道;路程,行程。2 〈美國〉鐵路。3 方法,手段,辦法;(走向...
  • improvement : n. 1. 改良,改進,增進;進步。2. 利用,活用。3. 〈美國〉(增高房屋、土地等價值的)裝修,改良措施。4. 更優秀的人,更進步的人。
  1. Construction of sewers and the north - east river wall and site formation work at tai o, the road improvement works for cheung chau old town, and the reclamation, road and drainage works at yung shue wan, lamma island are in progress

    大澳污水渠與東北河堤建造工程及地盤平整工程、長洲舊墟道路改善工程,以及南丫島榕樹灣的填海、道路及渠務工程,均在進行中。
  2. Salisbury road underpass and associated road improvement works

    梳士巴利道行車隧道及相關的道路改善工程
  3. Road improvement to junction at victoria road and sandy bay road

    域多利道及大口環道交界處的道路改善工程
  4. Lung cheung road ching cheung road improvement

    翔道呈祥道改善工程
  5. Minor road improvement works

    小規模道路改善工程
  6. Minor road improvement work

    小規模道路改善工程
  7. Salisbury road underpass and associated road improvement works updated

    梳士巴利道行車隧道及相關的道路改善工程更新
  8. Motorists are advised that in order to facilitate road improvement works by highways departm

    ,以便路政署進行道路改善工程。
  9. The dual - 2 road improvement scheme is well enough to cater for the traffic growth up to 2011

    雙線雙程道路改善計劃已足以應付直至二零一一年的交通增長。
  10. Please advise who will be responsible for the fundingconstruction of the recommended road improvement schemes

    請說明所建議道路改善計劃的開支工程由誰負責。
  11. Eastbound between fung shing street and jat s incline will continue to be closed to facilitate road improvement works

    清水灣道東行由豐盛街至扎山道之間的一段將仍然封閉,以便進行道路改善工程
  12. The tia final report provided in the cd - rom included in volume two of ifp recommended the implementation of a number of road improvement schemes in the form of a number of localized road junction improvements ( schemes 1c, 7, 8 and 9 ), a new link road between yan cheung road and lin cheung road ( scheme 3 ), a new vehicular underpass along lin cheung road ( scheme 4 ) and an elevated road above the western harbour crossing toll booth and additional slip road leading to west kowloon highway ( scheme 6 )

    載于發展建議邀請書第二冊所附光碟的交通影響評估最後報告,建議實施多項道路改善計劃,包括多條區內道路的路口改善計劃(計劃1c 、 7 、 8和9 ) 、欣翔道與連翔道之間的新連接道路(計劃3 ) 、沿連翔道一條新的行車隧道(計劃4 ) ,以及西區海底隧道繳費處對上的架空道路及通往西九龍快速公路的新增連接路(計劃6 ) 。
  13. For these tests committed was defined to include projects under construction or at detailed design stage as of 1997. figure 2. 6 shows the railway and strategic road improvement projects which have territorial transport implications, assumed to fall in the committed category

    就這些測試來說,已承諾項目是指在1997年時正在興建或正進行詳細設計階段的項目。
  14. The castle peak road improvement between belvedere garden in tsuen wan and sham tseng, and from sham tseng to ka loon tsuen near tsing lung tau is being implemented

    介乎荃灣麗城花園與深井之間,以及介乎深井與青龍頭附近嘉龍村之間的青山公路改善工程現正進行。
  15. Tung chung road improvement works roving exhibition

    井頭至長沙一段東涌道改善工程巡迴展
  16. Final completion of pok fu lam road improvement - the sassoon road interchange

    薄扶林道改善工程-沙宣道交匯處竣工
  17. Tender and construction consultancy for castle peak road improvement awarded

    路政署批出青山公路改善工程顧問合約
  18. Roads works, use and compensation ordinance chapter 370 - pwp item no. 6365th - castle peak road improvement between area 2 and sham tseng, tsuen wan - corrigendum

    道路(工程、使用及補償)條例(第370章) - -工務計劃項目第6365th號- -荃灣第2區與深井之間的青山公路改善工程- -勘誤
  19. Castle peak road improvement - west of tsing lung lau, tsuen wan

    荃灣青山公路青頭段以西的改善工程
  20. Figure 2. 6 shows the railway and strategic road improvement projects which have territorial transport implications, assumed to fall in the committed category

    圖2 . 6顯示會影響全港交通的鐵路及策略性道路和有關的改善項目,這些項目都屬于已承諾項目。
分享友人