road link 中文意思是什麼

road link 解釋
連接道路
  • road : n 1 路,道路;街〈略 Rd 〉;公路;行車道;路程,行程。2 〈美國〉鐵路。3 方法,手段,辦法;(走向...
  • link : n 1 環鏈環。2 (編織物的)鏈圈。3 (鏈狀物中的)一節(多節香腸等的)一節單節小香腸。4 承前啟后的...
  1. Work on the last section of the primary road link to ma on shan town centre is scheduled for completion in 2000

    馬鞍山市中心主要連接路最後一段工程,定於二零零零年完成。
  2. Work on the primary road link to ma on shan town centre is scheduled for completion in 2002. five public housing estateshome ownership scheme projects are under construction

    馬鞍山市中心主要連接路工程定於二零零二年完成。五個公共屋?居屋屋苑的工程項目正在施工。
  3. The government should not hastily build a cross - boundary road link that might affect the natural landscape in sai kung

    政府不應倉卒地興建跨界公路,影響西貢的自然景觀。
  4. At last, based on the feature integrating traffic simulation with traffic assignment, the paper compares the link volume by using different traffic assignment models, and analyzes the influence of user equilibrium and system ' s optimal assignments on travel time, travel speed as well as traffic volume on links. further, the paper introduces the study on the influence of traffic composition on road link dynamics and the traffic simulation application in formulating dynamic traffic assignment models

    最後利用urbansim模型中交通模擬與交通分配相結合的特點,對比研究不同的交通分配方法在模擬模擬中路段產生的交通量,分析了交通分配中用戶平衡和系統最優原理對路段行駛時間、行駛車速的影響,並進一步研究了交通量構成對路段動態特徵指標的影響,以及利用交通模擬系統嘗試在動態交通分配中進行應用研究。
  5. Tai hang road, leighton road, sharp street east, percival street south of hennessy road, caroline hill road, link road, stadium path, cotton path, eastern hospital road, eastern hospital road service road, broadwood road, southbound wong nai chung gap road, southbound stubbs road flyover, aberdeen reservoir road and yue kwong road

    大坑道、禮頓道、霎東街、軒尼詩道以南的波斯富街、加路連山道、連道、大球場徑、棉花路、東院道、東院道支路、樂活道、黃泥涌峽道南行、司徒拔道天橋南行、香港仔水塘道及漁光道。
  6. All traffic on metropolis drive eastbound will not be permitted to turn right onto the princess margaret road link hung hom bypass westbound

    所有都會道東行車輛不準右轉上公主道連接路紅?繞西行。
  7. 2 on passing chi man street petrol filling station, keep left to join princess margaret road link and then salisbury road w b, kowloon park drive n b, canton road n b, wui cheung road, lin cheung road n b, then slip road to whc

    2經過治民街油站后,靠左沿公主道連接路往梳士巴利道西行,九公園徑北行,廣東道北行,匯翔道西行,連翔道北行,抵達西隧連接路。
  8. The tate s cairn tunnel was opened to traffic in 1991, providing an additional direct road link between the north - eastern new territories and kowloon

    大老山隧道在一九九一年通車,為九龍與新界東北部提供另一條直接連接通道。該隧道全長3
  9. The 3. 9 - kilometre tate s cairn tunnel, which is the longest road tunnel in hong kong, was opened to traffic in 1991, providing an additional direct road link between the north - eastern new territories and kowloon

    9公里,是全港最長的行車隧道。隧道為九龍與新界東北部提供另一條直接的連接通道,年內平均每日行車量達
  10. Hung hom bypass and princess margaret road link

    紅?繞道及公主道連接路
  11. Hiram s highway is the main road link to sai kung town from kowloon

    西貢公路是由九至西貢市鎮的主要連接路。
  12. The bridge will provide an important road link between the north and south of the country

    贊比西大橋為莫北部和南部提供了重要的公路連接。
  13. The remaining section of ntcr from fairview park to au tau was opened to traffic in january 1993. the bridge at man kam to was the only road link with china for many years

    至於餘下的一段新界環回公路,即由錦繡花園至凹頭的一段,於一九九三年一月通車。
  14. The deep bay road link project, to be completed in 2005, will dovetail with a new shenzhen western corridor to double the capacity of hong kong s boundary crossing facilities

    預計2005年建成的后海灣連接路,配合深港西部通道,將使香港跨境交通設施的能力擴大一倍。
  15. Hung hom bypass princess margaret road link

    紅?繞道及公主道連接路
  16. The road link to sha tin should be maintained as only as a secondary alternative route

    連接沙田的道路仍應作為次要道路。
  17. The southbound carriageway of the princess margaret road link and hung hom bypass will be closed

    公主道連接路南行線及紅?繞道將會封閉。
  18. The section of route 8 between cheung sha wan and sha tin will provide the fourth road link between sha tin and kowloon, serving the increasing traffic demand between northeast new territories and west kowloon, hong kong island west and lantau. it will also help relieve the traffic pressure on lion rock tunnel, tate s cairn tunnel and tai po road

    八號干線長沙灣至沙田段將會是連接沙田與九市區的第四條通道,通車后不但可以令新界東北部前往西九及大嶼山的交通更加直接暢順,而且還可以紓緩目前獅子山隧道大老山隧道及大埔道的交通壓力。
  19. This would replace the previously proposed lantau north south road link between tai ho wan and mui wo, which was found to have an unacceptable environmental impact. other major road projects under planning include the central - wan chai bypass and island eastern corridor link, route 7 between aberdeen and kennedy town, and route 10 between the yuen long highway and north lantau

    其他規劃中的主要道路工程,包括中環灣仔繞道和東區走廊連接路、七號干線香港仔至堅尼地城段,以及十號干線(元朗公路至北大嶼山段) 。
  20. The northern section between ylh and so kwun wat ( skw ) and southern section between lantau and skw are programmed for 2007. traffic forecasts for 2005 without r10 nlylh show peak hour demands greater than available capacity on route 3 cps, thereby indicating the importance of the road link and, in particular, the northern section. the transport assessment confirmed the capacity requirements for the northern section of r10 nlylh as dual 3 lanes

    根據就二零零五年未及鋪築十號干線(北大嶼山至元朗公路)的情況所作的交通預測,三號干線(郊野公園段)于繁忙時間的交通流量已超出負荷,這顯示十號干線(北大嶼山至元朗公路) ,尤其北段的興建,是十分重要的。
分享友人