road works 中文意思是什麼

road works 解釋
道路工程
  • road : n 1 路,道路;街〈略 Rd 〉;公路;行車道;路程,行程。2 〈美國〉鐵路。3 方法,手段,辦法;(走向...
  • works : 的印表機描述格式
  1. Ancillary road works in ki lun tsuen, yuen long gazetted

    元朗麒麟村附屬道路工程刊憲
  2. Transport department - road works on dual carriageways

    運輸署-在分隔車路的道路工程
  3. Warning signs and informatory signs will help to guide you through the road works area or divert you around the obstruction

    路上會設有警告標志和提示性標志,指引駕駛人駛出道路工程范圍,或繞過障礙物。
  4. The road works sign with an end plate marks the end of the road work area

    道路工程標志連同終止標志,表示道路工程范圍在此終止。
  5. We were delayed by road works for two hours.

    我們因道路施工耽擱了兩個小時。
  6. Road-works on the motorway are holding up traffic.

    高速公路上的道路施工影響了交通。
  7. All the residents have been inconvenienced by the road works

    居民們都因築路工程而感到不便。
  8. Abstract : introduceing the pedestrian subway construction method works and fitted technical measures with the shallow depth and covered cut method at the saturated sand layer in the city in the light of pedestrian subway of xiangxi - road works

    文摘:結合向西路地下人行通道工程實例,介紹城市飽和含水砂層中採用淺埋暗挖法修建地下人行通道施工方法和配套技術措施。
  9. It comprises surplus materials from site clearance, excavation, construction, refurbishment, renovation, demolition and road works

    這包括由工地平整、掘土、樓宇建築、裝修、翻新、拆卸及道路等工程所產生的剩餘物料。
  10. To manage road opening activities properly, road works proponents are required to have an excavation permit ( xp ) before commencement of works since the 70s

    為妥善管理道路開掘工程,自七十年代起,道路工程倡議人須領有掘路許可證,方可展開工程。
  11. Under these circumstances, the road works proponents are also required to suitably plan and coordinate these works before applying for xps from the highways department ( hyd ) in order to minimise any inconvenience caused to the public

    在這些情況下,道路工程倡議人向路政署申請掘路許可證前,須適當籌劃和協調各項工程,以盡量減低對市民造成的不便。
  12. Notice is hereby given that in order to facilitate the road works, the flyover on wan po road near

    市民請注意,為方便進行道路工程,環保大道近昭信路的天橋將于
  13. In many cases normal speeds are impossible past road works, so you should slow down at the first indication of road works

    很多時,駕駛人不能以正常車速駛經工地,因此,一看到道路工程的警告指示時,就應減速。
  14. Road works on dual carriageways

    在分隔車路的道路工程
  15. " road works near ko po tsuen.

    近高埔村的道路工程
  16. Roads ( works, use and compensation ) ordinance ( chapter 370 ) ( notice under section 8 ( 2 ) ) - - pwp item no. 92cd yuen long, kam tin, ngau tam mei and tin shui wai drainage improvement, stage 1, phase 2b - - tam tin ( works package d ) road works ancillary to the proposed drainage improvement works in cheung po, ma on kong, yuen kong san tsuen and tin sam tsuen areas

    道路(工程、使用及補償)條例(第370章) (根據第8 ( 2 )條規定所發的公告) - -工務計劃項目第92cd號元朗、錦田、牛潭尾及天水圍雨水排放系統改善工程第1階段第2b期? ?錦田(工程組合d )擬建的長莆、馬鞍崗、元崗新村及田心村地區排水改善工程? ?附屬道路工程
  17. Roads works, use and compensation ordinance chapter 370 - notice under section 8 pwp item no. 92cd yuen long, kam tin, ngau tam mei and tin shui wai drainage improvement, stage 1, phase 2b - kam tin works package d road works ancillary to the proposed drainage improvement works in cheung po, ma on kong, yuen kong san tsuen and tin sam tsuen areas

    道路(工程、使用及補償)條例(第370章) - - (根據第8 ( 2 )條規定所發的公告)工務計劃項目第92cd號元朗、錦田、牛潭尾及天水圍雨水排放系統改善工程第1階段第2b期- -錦田(工程組合d )擬建的長莆、馬鞍崗、元崗新村及田心村地區排水改善工程- -附屬道路工程
  18. Roads ( works, use and compensation ) ordinance ( chapter 370 ) - - ( notice under section 8 ( 2 ) ) pwp item no. 92cd yuen long, kam tin, ngau tam mei and tin shui wai drainage improvement, stage 1, phase 2b - - kam tin ( works package d ) road works ancillary to the proposed drainage improvement works in cheung po, ma on kong, yuen kong san tsuen and tin sam tsuen areas

    道路(工程、使用及補償)條例(第370章) - - (根據第8 ( 2 )條規定所發的公告)工務計劃項目第92cd號元朗、錦田、牛潭尾及天水圍雨水排放系統改善工程第1階段第2b期- -錦田(工程組合d )擬建的長莆、馬鞍崗、元崗新村及田心村地區排水改善工程- -附屬道路工程
  19. Roads works, use and compensation ordinance chapter 370 notice under section 8 - pwp item no. 92cd yuen long, kam tin, ngau tam mei and tin shui wai drainage improvement, stage 1, phase 2b - tam tin works package d road works ancillary to the proposed drainage improvement works in cheung po, ma on kong, yuen kong san tsuen and tin sam tsuen areas

    道路(工程、使用及補償)條例(第370章) (根據第8 ( 2 )條規定所發的公告) - -工務計劃項目第92cd號元朗、錦田、牛潭尾及天水圍雨水排放系統改善工程第1階段第2b期? ?錦田(工程組合d )擬建的長莆、馬鞍崗、元崗新村及田心村地區排水改善工程? ?附屬道路工程
  20. Roads ( works, use and compensation ) ordinance ( chapter 370 ) ( notice under section 8 ( 2 ) ) - - pwp item no. 119cd ( part ) drainage improvement in northern new territories, package c ( phase 1 ) - - drainage improvement works at lung yeuk tau, kwan tei, tan shan river and leng tsai, fanling, new territories - - ancillary road works

    道路(工程、使用及補償)條例(第370章) (根據第8 ( 2 )條規定所發的公告) - -工務計劃項目第119cd號(部分)新界北部雨水排放系統改善計劃c部分(第一期)新界粉嶺龍躍頭、軍地、丹山河及嶺仔雨水排放系統改善工程附屬道路工程
分享友人