roadbed section 中文意思是什麼

roadbed section 解釋
路基斷面
  • roadbed : 1. (鐵路)路基,路床。2. 鋪路材料[碎石,沙子]。3. 供車輛行駛的路面部分;行車道。
  • section : n 1 (外科、解剖的)切斷;切割;切開。2 【外科】切片,【金相】磨石。3 (果子的)瓣。4 【數學】截...
  1. At the same time 7794m3 affusion test were processed, and roadbed settlement observation conducted for two more year, physical mechanism and chemical index experiment were analyzed in the laboratory, section experiment of earth sample was proceed, changement of compacted soil body micromechanism along with depth were analysed by polariscope and scan electricscope. drain ditch, barrel - drain and little bridge were treated by composite geotextile

    在室內進行了物理力學、化學指標實驗分析,並對土樣結構進行了切片試驗,用偏光顯微鏡和掃描電鏡分析了土壤碾壓后沿深度分佈的土體微觀結構變化情況,對邊坡、邊溝、排水溝、小橋涵及護坡封水採用復合土工布進行處理。
  2. The research test of this discussion as follows : making investigation and research to overseas related materials ; make investigation to built highways in desert areas, dozens of routes and nearly 100 road sections have been surveyed, among them two highways have been taken as the chief investigation objects, they are " 210 national highways - first grade highways from bao tou to dong sheng " and " the section of nei meng a la shan meng s307 from shang de to meng gen " ; the relationship between windblown sand drift and the roadred height wind tunnel test ; make investigation to the tested road sections and subengineerings then make statistics and study according to the test outcome ; the stability analysis of different roadbed height ; the analysis of roadbed economy

    本課題的研究工作包括:對國外相關資料的調研分析;對已建沙漠地區公路進行調查、觀測了十余條線路,近百段路段,以『 210國道包頭至東勝一級公路』 、 『內蒙阿拉善盟s307尚德至孟根段』為主要調查對象;風沙流路基高度的關系、風洞試驗;對調查路段及依託工程調查、觀測結果統計研究;不同高度下路基穩定性分析;路基經濟性分析;按照沙丘類型及公路等級提出路基合理高度推薦值。
  3. Abstract : a mechanical model to analyze the dynamic performance of train and transition section between roadbed and railway bridge was established a nd a series of reasonable criterions were put forward too. based on this, the init ial deformation of rails due to different subsidence of roadbed and bridge abutm ent, the effects of the direction and speed of train on the dynamic performance o f wheel / track system were studied. at last, the method to determinate the length o f transition section was suggested

    文摘:建立了列車與路橋過渡段動力特性分析模型,確定了一套軌道過渡段動力特性的評價指標,分析了由基礎沉降差引起的鋼軌初始變形以及行車方向、行車速度對輪軌系統動力性能的影響,提出了確定路橋過渡段長度的方法。
  4. According to the question of foundation engineering from test section ( lko + 900 to lk1 + 000 ) of xichang - - panzhihuang express highway, this paper put up important systems analysis and study on the deformation of roadbed which is filled by special stratum on site - - xigeda stratum

    本論文結合西攀高速公路試驗路段( lk0 + 900 lk1 + 000 )的地基工程問題,重點對該區的特殊地層? ?昔格達地層填築路堤的變形問題進行了分析和研究。
  5. This paper introduce the test and application situation of some new techniques in the stone roadbed blasting of the seventh bidding section of the electrized speed increasing modification works of zhegan railway such as adding the flexible cushion on the hole - bed, making the smooth blasting, making the large - area multi - row short - delay loose blasting, and making the single - hole one - by - one blasting network, etc

    介紹了浙贛鐵路電化提速改造工程第七標段石方路基爆破中,孔底加設柔性墊層、光面(預裂)爆破、大區多排微差松動爆破、單孔逐個起爆網路等新技術的試驗和運用情況。
分享友人