rock bridge 中文意思是什麼

rock bridge 解釋
巖橋
  • rock : n 1 巖,巖石,磐石,巖壁;卵石;〈常 pl 〉〈美口〉石子兒;暗礁,巖礁。2 〈the R 〉直布羅陀 (Gibr...
  • bridge : n 1 橋,橋梁;【造船】艦橋,船橋。2 鼻樑;(假牙上的)齒橋;【音樂】弦柱,弦馬;【電學】電橋;【...
  1. The iron - chain bridge is a famous scenic spot of heavenly pillar rock

    鐵索橋是天柱巖的著名景點。
  2. 5. the fractures of marlite, sandstone, faults and the disconformity between sha san member and sha er member are three main conduit systems. for this low maturity of the oil kitchen, the fractures of marlite that coexist with source rock might as well be an important bridge to link oil kitchen and reservoir

    5 、通過對德南窪陷輸導體空間分佈及物性特徵分析,揭示並論證了本區特殊的輸導層主要是與源巖共生的泥灰巖、泥質白雲巖及白雲巖中的裂縫系統,為進一步尋找有關油氣藏指出方向。
  3. Turning left from the foot of the celestial capital peak, one steps onto the jade screen stairs and goes through the care slope, passes hassock rock, crosses the lying cloud cave and the immortal bridge before reaching a place called a thread of sky

    從天都峰的山腳處向左轉,就來到了玉屏梯,爬過玉屏梯就是留神坡,在到達一線天之前還要經過蒲團石臥雲洞和仙人橋。
  4. Inside the park there are several beautiful views such as renqiu pavilion, the forty - four bridge, the piled - up rocks, the artificial hills, danying veranda and the insensate rock room

    有壬秋閣四十四橋疊石假山談瀛軒頑石山房諸景,為廈門名園之最。
  5. The arkansas river can rise no higher than to the main street bridge in little rock

    阿肯色河水位不得漲到高於小巖城的大街橋。
  6. Other sports activities are mountaineering, hiking, canyoning, speleology, mountain - biking, archery, climbing, rappel on rock and on bridge, skiing on stones, kayak and rafting on rivers of the surrounding area

    其他體育運動有在周圍地區的登山、遠足、峽谷穿越、探洞、山地騎行、射箭、攀巖和速降(在山巖或橋上) 、滑石、劃艇和漂流。
  7. Thrust block may bridge the space between the termination of the arch and the foundation rock at the same elevation.

    推力墩可以跨在拱腳和同高程的基巖之間。
  8. According to the method in paper, roughness of bedrock surface of north anchor pit of runyang bridge is described in quantitative fractal dimension, and the method of determining frictional resistance of the whole anchor under many factors is discussed, which offers a new ideal and approach for precise determination of frictional resistance of rock mass engineering

    依據文中方法,對潤揚大橋北錨碇基坑建基面粗糙度進行了定量分維描述,探討了考慮多種因素條件下整個錨碇摩阻力的確定方法,為巖體工程摩阻力的準確確定探索了一條新的思路和途徑。
  9. However, along with the increasing of construction quantity of the infrastructure of irrigation works, traffic, communication etc., newer and higher requirement of geotechnical anchoring are made in slope, major dam, bridge, tunnel, deep foundation ditch engineering and the construction engineering such as anti - capsize, anti - float, anti - slippage engineering of the buildings. for example, self - intension of rock and soil is required to exploit better ; carrying capacity of anchor increase according to anchoring length ; anchor should be sufficiently lasting and should not influence the exploitation of adjoining stratum

    但另一方面,隨著我國水利、交通、通訊等基礎設施建設力度的加大,邊坡、大壩、橋梁、隧洞、深基坑以及建築結構物的抗傾倒、抗浮力、抗滑移等建設工程將對巖土錨固提出一些新的和更高的要求:如要求進一步調用巖土體的自身強度,錨桿應具有足夠的耐久性,錨桿的使用應不影響周邊地層的開發等。
  10. Abstract : the engineering mechanics properties of soft foundation rock under the second changjiang bridge in nanjing are represented

    文摘:闡述了南京長江第二大橋橋基軟巖的工程力學性質。
  11. In combination with the construction practice of abutment no. 2 great bridge and no. 1 medium - scaled bridge, the paper introduces the construction technology of rock - socketed piles in highway engineering

    摘要通過邊墩2號大橋和羊山1號中橋的施工實踐,介紹嵌巖樁在公路工程中的施工工藝。
  12. Descending the celestial capital peak westwards, travelers go through the immortal gate keeper cave with vivid peach - resembling rock formations on the cave, pass crucian carp peak formed during the glacial period and cross the heavenly bridge where the sea exploring pine stands

    在天都峰的西側往下走,人們要依次經過「仙人把洞門」 ,鯽魚背和天橋, 「仙人把洞門」上有形狀如桃花的巖石,天橋鯽魚松形成於冰川時期,天橋上生長有探海松。
  13. Therefore, one can not claim to have been to the yellow mountains without reaching the celestial capital peak. descending the celestial capital peak westwards, travelers go through the immortal gate keeper cave with vivid peach - resembling rock formations on the cave, pass crucian carp peak formed during the glacial period and cross the heavenly bridge where the sea exploring pine stands

    在天都峰的西側往下走,人們要依次經過「仙人把洞門」 ,鯽魚背和天橋, 「仙人把洞門」上有形狀如桃花的巖石,天橋鯽魚松形成於冰川時期,天橋上生長有探海松。
  14. Some references will be offered for optimal design of bridge pile on the test results, and some new thoughts are obtained in making up for the shortage in the theory of rock - socked pile design

    試驗結論不僅為橋墩的合理設計提供參考,也為彌補嵌巖樁現有設計理論的不足提供某種新的思路。
  15. Gold rock bridge, shichahai lake, beijing

    什剎海畔的金錠橋
  16. Borehole completion process of rock socketed piles for the piers of yongding river no. 2 bridge

    永定河2號大橋橋墩嵌巖樁成孔工藝
  17. In the light of the low - lying pile cap foundations designed for main piers no. 2 and no. 3 of tianluo bridge on wenzhou - fuzhou railway. this paper describes the ways to resolve the construction problems of the foundations in deep water in sea and at seabed that is steep and without overburden, using the construction techniques of underwater rock blasting, steel cofferdam floating, positioning, bottom sealing and manual pile digging

    摘要針對溫福鐵路田螺大橋2號、 3號主墩設計上採用低樁承臺基礎情況,介紹運用水下巖石爆破,浮運鋼圍堰就位、封底、人工挖孔樁等施工技術解決海上深水、河床陡峭且無覆蓋層的基礎施工難題。
  18. Abstract : this article discusses the formation of the drilling rig platform, selection of the hole forming equipment and treatment of some incidents occurred during the construction of the bored pile foundation of the qi ? ao bridge in zhuhai under different geological conditions. it also studies such issues as the embedment of the steel casing and bottom elevation of the bored pile on the inclining rock and katarock

    文摘:筆者介紹了淇澳橋主橋鉆孔灌注樁基樁施工中,在不同地質條件下,水上鉆機平臺的搭設、成孔設備的選型、事故的處理,並對鋼護筒的埋設及破碎帶傾斜巖面上鉆孔嵌巖面上鉆孔樁孔底標高問題作了探討
  19. On the top of the rock stands the embracing - the - moon pavilion, and in front are the five dragons pavilion and seven stars bridge

    ?頂有攬月亭,巖前有建於湖心的五龍亭、七星橋等勝景。
  20. One is the " belt persistence ", which is defined as the total length of joints teace length in a 1m wide belt projected to a basic line ( eliminating the overlay section ) over the length of the basic line. another is the one called as " search persistence ", which is defined a as the total length of joints trace length on the searched potential slipe surface over the length of the slip surface. thus, the author establishes a measuring and calculation system to these definitions and finishes a great deal of field investigation aiming at the joints trace length and the " rock bridge " survey

    在此基礎上,針對a區邊坡的穩定性,結合邊坡的破壞失穩模式,以邊坡節理巖體的連通特性的研究為突破點,從節理巖體的幾何參數的統計分析出發,採用monte - carlo隨機模擬原理形成節理網路模擬圖,以巖橋和節理組合破壞的內在機制為依據,以搜索節理巖橋組合的最短路徑為手段,通過帶寬投影法與路徑搜索法兩種方法的計算,獲得了sn向中緩節理的連通率分別為48 . 7和56 . 78 ,最終推薦60的連通率進行了邊坡的穩定性分析與計算,並結合工程實際,計算了邊坡的推力與錨固力,最終為邊坡的支護設計提供優化建議。
分享友人