rock element 中文意思是什麼

rock element 解釋
巖石單元體
  • rock : n 1 巖,巖石,磐石,巖壁;卵石;〈常 pl 〉〈美口〉石子兒;暗礁,巖礁。2 〈the R 〉直布羅陀 (Gibr...
  • element : n 1 要素;成分;(構成)部分;分子。2 【化學】元素;【數學】元,素;【機械工程】單元;單體;【無...
  1. Fist of all, on the basis of the research of agone boffins, this author investigates the interaction mechanism of bolts and rock, and introduces the elastic ? lastic analytical resolution which is consist of the liner structure, the equivalent reinforced wall rock and the original wall rock in the simple loading from the equivalent well - proportioned view ; this solution is very important meaning for the engineering design. on the basis of coulomb friction model, the author introduces the finite element equation of the contact problem in order to provide the academic foundation for the application of msc. marc. finally, combining the engineering practice of the non - linear analysis of shield tunnel through yellow river of the south - north water transfer and using the model of friction, the author researched the evolution law of stress and displacement field in the structure of grouted rock bolts, and analyzed the effect to the stress and deformation of surrounding rock mass due to anchor supports

    首先,在前人研究成果的基礎上,對錨桿與圍巖的相互作用機理進行研究,利用全長錨固錨桿的中性點理論,從等效均化的角度來考慮錨桿對圍巖的加固作用,並推導了在簡單荷載作用下,含有襯砌、等效加固后的圍巖、原始圍巖三者的彈塑性解析解,對工程設計有著重要的參考意義;在數值模擬方面,以考慮錨固圍巖滿足規則化庫侖摩擦模型為基礎,利用虛功原理推導了接觸問題的有限元方程的計算格式,為開發運用大型商用有限元軟體msc . marc提供了理論根據,也形成了本文的理論基礎:最後,論文以南水北調東線穿黃隧洞穩定性分析項目為工程實例,利用本文所述的接觸問題的摩擦模型理論,對錨桿支護結構的應力場、位移場的變化規律進行了研究,分析了加錨支護對隧洞圍巖應力、變形的影響。
  2. Roll over protective structure ( rops ) is a device which installs on out of construction vehicle. the main functions are : when the vehicle rolling over. rops can prevent the vehicle from rolling over further, and reduce the possibility of rolling vehicle injures operator ; when the vehicle traveling on freezing soil. concrete and rock, it has large resist continuous impact ability ; when the vehicle overturning rops can support the whole vehicle. arrangement of falling object protective structure ( fops ) can block objects ( such as trees, rocks ) so that supply protection for operator. this problem is that research rolling over and falling objects protective structure of bulldozer by learning research condition of rops / fops and relative lay down international standard. on the base of theory analysis. detrudes counting formula of rops / fops deformation through founding mechanics analysis model of rops / fops at the stage of elasticity and plastoelastic. and finds a set of feasible nonlinear finite element analysis counting. lt calculates rops / fops plastoelastic deforma variable of 320hp bulldozer, bulldozer has been carried out by optimizing design method

    其主要功能是:當車輛滾翻時, rops能刺入未凍土壤而阻止車輛的進一步滾翻,降低滾翻的車輛對系著安全帶司機軋傷的可能性;保證rops在碰撞和沖擊變形不大的地面(如凍土、混疑土上、巖石)時,能具有相當大的抗連續沖擊能力;當車輛已經處于顛覆狀態時,已經變形的rops應能支撐住整車。落物保護裝置(簡稱fops ) ,其構件的布置方式要能遮蔽墜落的物體(如,樹木、巖石等) ,以便對司機提供適當的保護。本課題主要通過了解國內外有關對rops fops的研究情況和有關國際標準的制定,對大型推土機傾翻和落物保護裝置進行研究,在理論分析的基礎上,通過建立rops fops的力學分析模型,推導彈性、彈塑性階段rops fops變形的計算公式,建立一套可行的rops fops的非線性有限元分析計算方法。
  3. Discrete element numerical simulation of subsidence induced by mining under fragmentized rock - strip

    破碎帶下采礦引起地表沉陷的離散元數值模擬
  4. There are certain difficulties in studying the failure process of frangible materials such as concrete, rock, etc which are caused by dynamic loads such as collision, earthquake, exploding, etc by those current exited numerical methods like finite element method etc. so in order to solve such a problem we should introduce certain new numerical analysis method

    現存的一些數值方法如有限元法等在研究混凝土、巖石等脆性材料在沖擊、爆破、地震等動荷載作用下的破壞過程問題中存在著一定的困難。因此,對於此類問題需要新的數值分析方法。
  5. An analysis of finite element model on nuclide migration in single fracture rock

    單裂隙巖體中核素遷移行為的有限元分析
  6. Through the study of characteristic of macroelement, microelement, rare - earth element, oxyhydrogen isotope, sulfur isotope, lead isotope, fluid inclusion etc, a conclusion can be drawn that metallogenic substance comes from the upper mantle with mixing of some substance from the upper crust latter. it is likely to have the same source with the surrounding rock

    通過對礦床的常量元素、微量元素、稀土元素、流體包裹體特徵、氫氧同位素、硫同位素、鉛同位素等特徵的研究,認為成礦物質主要來源於上地幔,與周圍巖石存在著同源的可能性,後期有一定的上地殼物質混入,成礦作用有三期,分別與區內的花崗巖、二長花崗巖脈、雲煌巖脈有關。
  7. Besides, this paper adopts the random finite element method, uses geometric and physical mechanical parameters that are relevant to lining weight of surrounding rock, coefficient of lateral pressure, height or buried depth of vertical loading, elastic resistance coefficients of surrounding rock, elastic modulus of support structure, unit weight of concrete, thickness of the structure as well as torsional strength and compression strength of concrete and etc., as random variables, applies the monte - carlo method to sampling by computer, preliminarily evaluates the reliability of bearing capacity and stability of molded concrete lining of the xuefeng mountain tunnel, and obtains the related displacement of the lining, mean value and variance of internal force, and computed the reliability index of lining structures

    此外,本文採用隨機有限元方法,將圍巖容重、側壓力系數、垂直荷載高度或埋深、圍巖的彈性抗力系數、支護結構的彈性模量、混凝土容重、結構的厚度以及混凝土的抗扭與抗壓強度等與襯砌結構有關的幾何與物理力學參數作為隨機變量,應用蒙特卡洛理論進行計算機隨機取樣,對雪峰山隧道模注混凝土襯砌的承載力與穩定性的可靠度進行了初步評估,得出了襯砌的相關位移與內力的均值和方差,並計算出了相應的襯砌結構可靠指標。
  8. In this paper, the finite - element numerical analysis calculation is applied to the foundation of high - rise and multi - floor building and the evolvement law of stress and displacement of tunnel used by urban traffic to explore the mutual influence between the wall rock of underground space and high - rise building foundation, taking account of the specific construction situation in the " sanmu garden " project in dadukou district in chongqing, from the perspective of underground space static - force structure stability analysis to open a underground tunnel with 6m in span and 7. 5m in height for track traffic 20m below the surface. this paper, taking considerations of three different states, i. e. the natural state without any artificial interference, the state of high - rise buildings on the surface, and the underground tunnel state with excavation for track traffic, and four plane lines and four vertical lines, analyzes and studies the distributing law of stress and displacement of calculation section from the following aspects : ( 1 ) the main stress vectorgraph, displacement distribution graph ( ux, uy ) and chromatogram graph of stress isoline ( 1, 2, xy ) of section under different states ; ( 2 ) the contrastive distribution curve of stress ( 1, 2, xy ) of different plane and vertical lines under the same state ; ( 3 ) the contrastive distribution curve of stress ( 1, 2, xy ) of the same plane and vertical lines under different states, wishing to provide references for underground space utilization and project designing and construction of the tunnel under high - rise buildings in the future

    本文結合重慶市大渡口區「三木花園」開發建設項目,從地下空間靜力結構穩定性分析角度出發,針對在該項目中涉及的高層和多層建築物以及在其地下20米處開挖了一個用於軌道交通的跨度6米,高7 . 5米的地下隧道這一具體工程情況,採用2d - 3d -有限元結構分析程序對高層與多層建築物的地基基礎及其與城市軌道交通使用的地下隧道圍巖的應力與位移演變規律進行了有限元數值分析計算,探索了地下空間圍巖與高層或多層建築物地基基礎之間的相互影響,通過考慮未受到任何人為擾動影響的天然狀態、地表存在多層或高層建築物狀態和地下開挖用於軌道交通的地下隧道狀態等三種不同狀態以及4個水平剖線和4個垂直剖線等不同情況,從以下幾個方面具體分析研究了計算斷面的應力與位移分佈規律: ( 1 )在各種不同狀態下計算斷面的主應力矢量圖、位移分布圖( ux 、 uy )以及應力等值線色譜圖( _ 1 、 _ 2 、 _ ( xy ) )等; ( 2 )相同狀態下不同水平與垂直剖線的應力_ 1 、 _ 2和_ ( xy )對比分佈曲線; ( 3 )不同狀態下相同水平或垂直剖線的應力_ 1 、 _ 2和_ ( xy )的對比分佈曲線等,為今後在對地下空間的開發利用以及在高層建築物地下開挖硐室時的工程設計和工程施工提供參考依據。
  9. Taking it for example that zhujiabaobao section of panzhihua vanadic titano - magnetite deposit, the paper detailedly analysed its change regularity in ore texture and structure, mineral composition and content, ore chemical composition, mineral chemical composition, rare element " s change feature of rock and ore, exploding temperature of mineral inclusion. on the basis of above, the feature of rhythmic texture of ore body in panzhihua vanadic titano - magnetite deposit was researched

    本文以攀枝花釩鈦磁鐵礦朱家包包礦段為例,詳細分析了該礦段中礦石組構、礦物成分及含量、礦石化學成分、礦物化學成分、巖石及礦石稀土元素變化特徵、礦物包裹體爆裂溫度等的變化規律,進而研究了攀枝花釩鈦磁鐵礦礦體中的韻律結構特徵。
  10. Through researching the rhythmic change regularity of ore texture and structure, mineral composition and content, rare element " s change feature and the exploding temperature of mineral inclusion, combining the theory of magmatic ore - forming, the forming process of panzhihua vanadic titano - magnetite deposit could be divided into four periods : rock - forming period, main ore - forming period, hydrothermal period and surficial processing period

    通過對礦石組構、礦物成分及含量、稀土元素變化特徵、礦物包裹體爆裂溫度的韻律式變化規律的研究,結合巖漿成礦理論,將攀枝花釩鈦磁鐵礦礦床的形成過程劃分為四個期:成巖期、主成礦期、熱液期、表生期。
  11. Application of finite element method in analyzing the stability of wall rock

    有限元法在圍巖穩定性分析中應用
  12. Dongzigou ag deposit and jianbaoshan au deposit are hosted in the sandstone of middle - proterozoic suberathem, which are developed from the proterozoic sediment metal source - rocks formed during the meso - proterozoic volcanism and reworked by the mesozoic tectono - magmatism during the formation of the metamorphic core complexes in eastern hebei. the dongzigou ag deposit has the characteristics of reformed strata - bound origin, the jianbaoshan au deposit, located in the detachment fault, is the alterated rock type. both deposits have the similar wall - rock alteration, and show the same trace element behavior, and ree patterns. they are the results of the multi - stage tectono - magmatism in the environment of continental extension in eastern hebei region. their mineralization depended on their wall rocks and relative location in metamorphic core complexs

    賦存於中元古宙長城系常州溝組的洞子溝銀礦床和尖寶山金礦床是由密雲-都山變質核雜巖構造體系所控制的一組礦床。其成因為中元古宙火山巖漿活動形成的沉積礦源,后經中生代的變質核雜巖構造巖漿體系疊加改造而成。洞子溝銀礦床具有層控迭加改造的特點尖寶山金礦床則具有破碎蝕變巖型礦床的特點。
  13. 3d elasto - visco - plastic hierarchical block element method for rock mass

    巖體的三維彈粘塑性階譜塊體單元法
  14. From the characteristic of district geochemistry, we can figure out, cu, ag, pb, zn abnormality main spread along the west branch river set and close to border layer, and the rock chemistry analysis prove, west branch river set have the higher ag chemical element abundance, the cu have the characteristic of asymmetry distribute, and display the migration of element in the late multiphase tectonic activity

    從區域地球化學特徵可以看出, cu 、 ag 、 pb 、 zn等元素異常主要沿西岔河組及相鄰層位分佈,巖石化學測量證明,西岔河組在區域上具有較高的ag元素豐度值, cu元素具不均勻分佈特徵,顯示出元素在後期的構造活動中的活化遷移。
  15. Abstract : incompatible element nh11 and hybrid stress element 18 were employed to analyze rock burst occurring in coal face 9108 of sanhejian coal mine. compared with the results from ansys, the two optimized fems can execute more accurate numerical simulation in the research of rock burst as well as other rock problems and lessen the errors from inaedquately meshing in huge calculations due to the limitation of labor and computer time. in addition, the criterion of averaged generalized stress rate was proposed and used to determine the site and moment of rock burst. the given conclusion is in accordance with the face of coal face 9108 very well

    文摘:利用優化非協調元和雜交元分析了三河尖礦沖擊礦壓,並與ansys程序的計算結果進行了比較.認為優化有限元在沖擊礦壓乃至巖石材料的數值模擬中能給出更為精確的結果,也可減小大型計算中由於人力、機時所限粗分網格產生的誤差.分析中,採用了廣義平均應力率準則來判斷沖擊點位置和沖擊時刻,所得結論與實際情況吻合
  16. Obtain these chief research achievements. ( 1 ) the method of hydraulic fracturing, kaiser effect experiment and the finite element numerical simulation computation results, the direction of maximum horizontal principal stress intersect the small - angle of tunnel axial line, it is favorable to the stability of tunnel peripheral rock ; according to the test rust of field stress - relief method, at the present time, zhe gu mount tunnel have n ' t access to high crustal stress site, maximum principal stress magnitude is 17mpa ~ 20mpa

    主要獲得以下研究成果: ( 1 )綜合水壓致裂法、室內巖石kaiser效應試驗和有限元數值模擬計算研究成果,最大水平主應力方向與隧道洞軸線小角度相交,對隧道圍巖穩定性有利;根據現場應力解除法測試結果,目前鷓鴣山隧道尚未進入高地應力段,最大主應力量級為17mpa 20mpa 。
  17. The finite element analysis of 3d seepage field for surrounding rock mass of cavern groups of underground powerhouses was performed based on the nodal virtual flux method for solving the non - pressure seepage field and the improved drainage substructure technique for accurately simulating the complex seepage behaviors of densely distributed drainage holes, with emphasis placed on the seepage properties of the anti - seepage concrete curtain and drainage curtain in the anti - seepage and drainage system

    摘要在求解無壓滲流場結點虛流量法的基礎上,結合可精細模擬密集排水孔復雜滲流水力行為的改進排水子結構技術,付某地下廠房廠區洞室群圍巖區三維滲流場進行了有限元求解分析,著重研究了防滲排水系統中的帷幕和排水幕的滲流特性。
  18. 4. triangular diagram of the sandstone clastic compositions and the relationship diagram of major element suggest that the proto basin of the clastic rock of the yanbian group was a forearc basin, which was in an active continental margin

    鹽邊群碎屑巖碎屑骨架顆粒統計分析結果和砂巖常量元素構造環境判斷圖解顯示,它們所處的構造環境為活動大陸邊緣,初步判定它們的原型盆地為弧前盆地。
  19. Simulating tension crack of rock masses by block element method

    巖體結構拉裂的塊體單元法模擬
  20. Based on the discuss of the geologic environment of the high slope of spandrel groove jinping i hydroelectric power station. and the engineering geological conditions of rock mass are carefully studied in the paper. the modified csmr are adopted to perform the classification of the slope rock mass, the results of which are combined with the macroscopic stability of the high slope. on the basis of these, the methods of geological diagnosis and the finite element analysis are applied to analyze and compute the overall stability of the high slope

    本文在闡明錦屏一級水電站壩區巖體的形成和演化特徵的基礎上,詳細研究了拱肩槽高邊坡巖體的結構特徵及岸坡巖體淺表生改造特徵,建立了岸坡巖體淺表生改造與岸坡演化模式,分析研究了巖體的物理力學性質,採用修正的csmr法對拱肩槽高邊坡的巖體質量進行分級研究,在此上基礎之上,採用地質分析判斷和有限元分析等方法,對高邊坡整體穩定性進行了系統分析、計算與評價;應用塊體理論對高邊坡的局部穩定性進行了分析計算,確定局部不穩定塊體的規模、出露范圍,從而對拱肩槽高邊坡的局部穩定性有了系統全面的認識和了解。
分享友人