rock fill foundation 中文意思是什麼

rock fill foundation 解釋
填石基礎
  • rock : n 1 巖,巖石,磐石,巖壁;卵石;〈常 pl 〉〈美口〉石子兒;暗礁,巖礁。2 〈the R 〉直布羅陀 (Gibr...
  • fill : vt 1 注滿,裝滿,裝填,填充。2 (風)張滿(帆),使(帆背)受風。3 充滿,充實(知識等);普及。4 ...
  • foundation : n 1 建設,創設,創立。2 基礎,根本;根據;地基,地腳。3 基金;捐款;用捐款創辦的事業;慈善機關;...
  1. The foundation for an earth - fill dam would be the natural soil or rock on which the dam is placed. concrete footings or piles and pile caps are often referred to as foundations without including the soil or rock on which or in which they are placed

    一)關于支持基礎結構影響土壤. (三)關于基礎結構支持關巖. (二)結構得到一堆地基樁,使樁可安裝在土壤和終止一切小費支持是從土壤中,也可以安裝,使復蓋巖小費.結合混凝土地基土壤和巖石上的地基或支持
  2. Research on construction technology of earth and rock - fill dams and tailing dam, soft foundation improvement and aseismatic engineering

    土石壩工程、灰渣築壩技術、軟土地基加固、工程抗震等研究領域取得了富有創造性、具有國際先進水平的成果。
  3. Rock fill mound foundation

    毛石堆地基
  4. Figure 7 - typical section of rock fill mound foundation for cooling water pumping station

    圖7 -冷卻用水抽水站毛石堆地基剖面圖
  5. The pile foundation or mat foundation methods would cost considerably more than 10 times that of a rock fill mound foundation

    -樁柱地基與席式地基的造價較毛石堆地基的造價超出10倍。
  6. The rock fill mound foundation has the merit of simple construction method. after dredging the soft marine clay, the rock fill is then laid into position by barge until the desired elevation is reached

    -毛石堆地基的優點是建造方法簡單,只需在挖走松軟的海泥后,以躉船把石填料投放在適當位置至所需的高度。
  7. In this paper, regarding the analysis of stability factors of majiatian tailings fill dam, namely regional geologic structure, rock - soil body of dam foundation, poor geology phenomenon, leach consolidation and chemical consolidation of tailings, seepage water of dam body and king - size flood water of majiatian tailings reservoir, a preliminary demonstration on probability of earthquake liquefaction and seepage failure of dam bodys tailings sand soil, of the dam body failure resulted from abutment landslide and of the flood water overflowing crest, as well as on the contribution of leach consolidation and chemical consolidation of tailings to the stability of dam body has been performed

    通過對馬家田尾礦庫區域地質構造、庫區不良地質觀察、尾礦淋濾固結和化學固結、壩體滲透水和庫區特大洪水等因素對馬家田尾礦堆積壩體穩定性影響的分析,初步論證了壩體尾礦砂土的地震液化、滲透破壞、壩肩滑坡使壩體失穩和洪水漫頂的可能性,以及尾礦淋濾固結和化學固結作用有助於壩體的穩定性。
  8. In this paper, regarding the analysis of stability factors of majiatian tailings fill dam, namely regional geologic structure, rock - soil body of dam foundation, poor geology phenomenon, leach consolidation and chemical consolidation of tailings, seepage water of dam body and king - size flood water of majiatian tailings reservoir, a preliminary demonstration on probability of earthquake liquefaction and seepage failure of dam body ' s tailings sand soil, of the dam body failure resulted from abutment landslide and of the flood water overflowing crest, as well as on the contribution of leach consolidation and chemical consolidation of tailings to the stability of dam body has been performed

    通過對馬家田尾礦庫區域地質構造、庫區不良地質觀察、尾礦淋濾固結和化學固結、壩體滲透水和庫區特大洪水等因素對馬家田尾礦堆積壩體穩定性影響的分析,初步論證了壩體尾礦砂土的地震液化、滲透破壞、壩肩滑坡使壩體失穩和洪水漫頂的可能性,以及尾礦淋濾固結和化學固結作用有助於壩體的穩定性。
  9. The choice dam type is especial importance, during the designed research of the rock - fill dam, particular under the rock - fill dam with very deeply cover layer, the stress and strain of the middle wall and cutting interpenetration wall of the dam foundation is mostly sensitive, whether the. design of dam is scientific and reasonable, it is very important for cutting interpenetration and stability of the dam, the article offer the reference for the design of cutting interpenetration in the foundation with deep cover with earth the water conservancy in xiaban zone, based on the study and analysis the design of cutting seep in the foundation with deep cover with earth, cutting interpenetration concrete wall and the joining model of cutting interpenetration material in body of dam and the applying effect in the practical worko based on the foundation which absorbed and summarize the achievement of design and research in the inter and outer country, for the project of the clay vertical middle wall and vertical cutting interpenetration, the asphalt concrete vertical middle wall and vertical cutting interpenetration the clay inclined middle wall and the lever carpet layer cutting interpenetration, respectively in terms of the different stage of complete period sluice period and working condition, adopting nonlinear calculate and analysis with the finite element method ; carrying the analysis and study with the 3d finite element method as to the different joining model of the left bank high slope cutting interpenetration body and the foundation concert cutting interpenetration wall ; carrying the analysis and study with the 3d finite element method as to the effect of the wall stress and strain because of the different elasticity modulus of the concert cutting interpenetration wall through the analysis and study with the different project. have comparatively all - around comprehended the various model dam, particular the distribute rule of stress and strain of the cutting interpenetration system, provide for the important evidence of the plastic area size the join model of the foundation cutting interpenetrate wall and dam body cutting interpenetrate system the choice of the dam model and the design of the structure of the dam body, the result of research and advice have very importance value in design and building for the similarity project

    工程設計中,壩型的選取顯得尤為重要,特別對于壩基有深厚覆蓋層的堆石壩,心墻和壩基防滲墻的應力和變形是壩體、壩基最敏感的部位,設計方案是否安全、科學和合理,對大壩防滲和穩定起到至觀重要的作用。本文研究分析了國內外深厚覆蓋層基礎防滲設計、壩基混凝土防滲墻與壩體防滲體銜接形式及工程實際應用效果,為下坂地水利樞紐工程深厚覆蓋層基礎防滲設計的方案選擇提供了參考;在吸收和歸納了國內外堆石壩的設計研究成果的基礎上,對粘土心墻和壩基垂直防滲方案、瀝青混凝土心墻和壩基垂直防滲方案以及粘土斜心墻和壩基水平鋪蓋防滲方案,分別按竣工期和蓄水運行期的不同工作情況進行了有限元非線性計算分析;對左岸高陡邊坡的大壩防滲體與基礎混凝土防滲墻的不同結合型式進行了三維有限元靜力計算分析和研究;對混凝土防滲墻不同彈性模量對墻體應力和變位的影響進行了三維有限元靜力計算分析和研究。通過對不同方案的計算分析和研究,比較全面的了解了各方案壩體,尤其是防滲體的應力和變形分佈規律,為壩型選擇、壩體結構設計、基礎防滲墻與壩體防滲體的結合型式以及塑性區大小的確定提供了重要依據。
  10. The stability analysis for the seepage is one of the most important steps in the design of rock - fill dam. the wrong designs or doings of the dam body, seepage of foundation or by - pass seepage would cause the body or foundations to deform or even breach the dam

    對土石壩壩體、壩基滲流,或壩肩繞壩滲流設計不當或出現問題而處理不及時,都可能導致壩體、壩基產生危害性的滲透變形,引起潰壩。