rock fill 中文意思是什麼

rock fill 解釋
填石
  • rock : n 1 巖,巖石,磐石,巖壁;卵石;〈常 pl 〉〈美口〉石子兒;暗礁,巖礁。2 〈the R 〉直布羅陀 (Gibr...
  • fill : vt 1 注滿,裝滿,裝填,填充。2 (風)張滿(帆),使(帆背)受風。3 充滿,充實(知識等);普及。4 ...
  1. Stress analysis of the rock fill dam with asphaltic concrete core wall

    冶勒堆石壩瀝青混凝土心墻型式及尺寸研究
  2. Application of concrete extrusion sidewall in face rock - fill dam in shuanghekou

    混凝土擠壓邊墻在雙河口面板堆石壩中的應用
  3. ( 3 ) according to the actual geology situation in the material field, use the " alternation " principle of the value engineering analysis methods, and then find a better construction method to satisfy the requirement of rock - fill material, through using chamber blasting to substitute muffling and using an - fo to substitute ammonium nitrate explosive, and then huge economical benefits were gained, for example, the unit cost of its rock - fill material reduced from 11. 77 m3 to 7. 17 / m3, and directly reduced the total cost by 4. 26 million of cost

    ( : 3 )依據料場的實際地質情況,通過價值工程活動,利用價值分析的「代替」原理,在滿足堆石料功能不變的條件下,採用洞室爆破代替深孔梯段爆破,採用按油炸藥代替錢梯炸藥,使得堆石料的開采成本顯著降低,從投標價的h . 70元/ m3降低到7 . 17元/ m3 ,降低了4 . 53元/ mj ,以上壩堆石料94 . 2萬m 「計,直接降低成本426 . 75萬元,產生了巨大的經濟效益。
  4. Application of distributed optical fiber temperature sensing technology to leakage monitoring for rock - fill dams with face slabs

    分散式光纖溫度傳感技術用於面板堆石壩面板滲漏監測
  5. Research on construction technology of earth and rock - fill dams and tailing dam, soft foundation improvement and aseismatic engineering

    土石壩工程、灰渣築壩技術、軟土地基加固、工程抗震等研究領域取得了富有創造性、具有國際先進水平的成果。
  6. In this paper, the study of construction technology of concrete facing rock - fill dam in frigid zone has been done in accordance with construction and practice of lianhua hydropower station ( concrete face rock - fill dam ) in mudanjiang, heilongjiang province

    本文針對嚴寒地區砼面板堆石壩施工技術研究方面的不足,結合我國黑龍江省牡丹江上的蓮花水電站,面板堆石壩的施工實踐,通過施工的原型實驗,對砼面板堆石壩在嚴寒條件下的施工技術進行了研究和總結。
  7. For example the concrete faced rock - fill dam in frigid zone is distinctive in terms of frost resistance and durability, cushion material seepage prevention and frost heave, adaptability of darn filling with season coordination among construction diversion, flood discharge and the whole construction schedule etc. lianhua construction which is situated in mudanjiang basin of heilongjiang province firstly creates the successful record of construction of large - size faced rock - fill dam in frigid zone, a series of internal and external problems not having a precedent to go by have been solved

    如在面板的抗凍耐久性、墊層材料防滲和凍脹特性、壩體填築與季節的適應性、導流和度汛與總體進度的協調等方面,寒冷地區混凝土面板堆石壩均有其獨特之處。蓮花工程位於黑龍江省牡丹江流域,首創了高寒地區修建大型面板堆石壩的成功記錄,解決了一系列國內外均無先例的難題。
  8. Rock fill mound foundation

    毛石堆地基
  9. Figure 7 - typical section of rock fill mound foundation for cooling water pumping station

    圖7 -冷卻用水抽水站毛石堆地基剖面圖
  10. The use of a vertical seawall resting above the rock fill mound would minimize the width of the base

    在毛石堆上建造垂直海堤可減少底座的闊度
  11. The rock fill mound has the lowest construction cost, about 9 million for the criii including the cost of rock

    -毛石堆的造價最低,佔中區填海第三期工程約900萬元包括石填料的成本。
  12. The pile foundation or mat foundation methods would cost considerably more than 10 times that of a rock fill mound foundation

    -樁柱地基與席式地基的造價較毛石堆地基的造價超出10倍。
  13. The slope of the rock fill mound is inclined about 35 degrees to the horizontal. the deeper the dredging level, the wider the base of rock fill required

    -毛石堆與水平面的角度約35o ,越挖得深,毛石堆地基底座的闊度便要越大。
  14. The rock fill mound foundation has the merit of simple construction method. after dredging the soft marine clay, the rock fill is then laid into position by barge until the desired elevation is reached

    -毛石堆地基的優點是建造方法簡單,只需在挖走松軟的海泥后,以躉船把石填料投放在適當位置至所需的高度。
  15. According to their building material, dams are described as concrete, earth fill, rock fill, hydraulic fill and so on.

    按照築壩所用材料,可以把壩稱為混凝土壩、填土壩、堆石壩,水力沖填壩等等。
  16. Test and research on asphalt concrete core of rock fill dam

    瀝青混凝土防滲墻施工技術
  17. Rock - fill sloping seawall

    石砌斜面海堤
  18. The dam for chahanwusu hydropower station is the first one among the concrete faced rock - fill dams under construction with the height of over 100 m and the toe slab being constructed on thick and deep cover in china

    摘要察汗烏蘇水電站水庫大壩為目前在建的河床趾板建在深厚覆蓋層上國內首座百米級的混凝土面板堆石壩。
  19. From the engineering practice in instability and failure of protective facing of overflow rock fill cofferdam, this article discussed the causes of formation of instability and failure of wire - caged protective facing and analyzed the primary factors and critical conditions of instability and failure based on model experiments

    摘要從過水堆石圍堰護面失穩破壞的工程實踐出發,探討了鉛絲籠護面失穩破壞的成因,在模型試驗的基礎上,分析了影響鉛絲籠護面穩定的主要因素及失穩破壞的臨界水力條件。
  20. Combined with a concrete face rock - fill dam in process, the simulation analysis on the face slab ' s temperature field and temperature stress is processed in connection with the condition of temperature sudden drop caused by daytime temperature differences and cold wave and so on during the construction period

    摘要結合某在建的混凝土面板堆石壩,針對施工期日溫差及發生寒潮等氣溫驟降情況,進行了氣溫驟降條件下面板溫度場及溫度應力的全過程模擬分析。
分享友人