rock testing 中文意思是什麼

rock testing 解釋
巖石試驗
  • rock : n 1 巖,巖石,磐石,巖壁;卵石;〈常 pl 〉〈美口〉石子兒;暗礁,巖礁。2 〈the R 〉直布羅陀 (Gibr...
  • testing : 測試系統
  1. Under the guidance of theories of sedimentology, petroleum geology and sequence stratigraphy, and through the comprehensive analysis of outcropsrock, cores, well logs and testing outcomes of rock gas, this paper studies the depositional systems of neopaleozoic and the character of aeration zone in tabamiao area of ordos basin. the result indicates that the object layers are divided into two depositional systems, the barrier seacoast depositional systems are recognized on upper carboniferous taiyuan phase with tidal flat, lagoon and barrier bar sedimentary deposit

    本文根據沉積學、石油地質學和層序地層學理論,綜合利用地表露頭、鉆井巖芯、測井曲線資料和試氣成果資料,對鄂爾多斯盆地塔巴廟區塊晚古生代沉積體系及含氣層特徵進行了研究。結果表明,研究區內目的層段可以劃分為2個沉積體系: ( 1 )上石炭統太原期為有障壁海岸沉積體系,發育潮坪?瀉湖?障壁砂壩沉積。
  2. In view of bearing capacity of the elastoplastic theory analysis, the author made a comparison between the achieved bearing capacity limit load pi / 4 of round base ( space problem ) and the limit load pi / 4 of bar groundwork foundation design ( plane problem ) from soil mechanics at home and abroad as well as foundation criterion, and explained why the value of formula in present design criterion from soil mechanics is inclined to be conservative. in the light of the author ' s many years experience of vibration test on the spot and the research work of relevant projects, the author worked over the dynamic pile testing of the bearing capacity of foundation and batholith, and gathered the parameter of dynamic analysis and testing. the author also talked over the difficult point of pile foundation design criteria in present batholith engineering world, i. e. the confirmation of batholith bearing capacity of pile end, from the following aspects : a ) confirmation of single axis counter - pressure strength of rock in house ; b ) f. e. m calculation of elastoplastic model ; c ) calculation of soil mechanics ; d ) deep well load test

    然後,對巖土工程領域至今尚未解決,甚至不為人注意的考慮地基變形的地基承載力問題進行了實用化的探討,提出了考慮地基變形的地基承載力上程計算方法;對基於彈塑性理論分析的地基承載力國內尚未見報道的空間問題得到了圓形基礎(空間問題)的承載力界限荷載p _ ( 1 / 4 ) ,並與國內外土力學專著及地基基礎設計規范中的條形基礎(平面問題)的界限荷載p _ ( 1 / 4 ) ,進行了對比,從而定量上解釋了目前設計規范引用土力學承載力公式值偏於保守的這一情況;根據本文作者多年從事現場地基工程振動試驗及相關課題的研究工作,本文以截頭錐模型模擬地基,對地基(巖基)承載力的動測法進行了研究,為各類地基(包括巖基) ,匯總了動力分析和檢測川的參數:針對日前巖土工程界應用樁基設計規范中的難點? ?樁端巖基承載力的確定問題,從巖石室內單軸抗壓強度確定、基於彈塑性模型的有限單元法計算、土力學計算及深斤載荷試驗四方面進行了深入討論;本文作者根據多年現場載荷試驗的工程實踐,對深井荷試驗裝置的核心部分? ?反力裝置,設計了側壁支撐反力加載系統,該加載系統具有實用、簡便、穩定及安個等優點。
  3. And rock triaxial serve testing system is used, through model test involving bedded planes and a set of joint normal to the bedded planes in rock mass, multiple sliding failure affected by properties of joints and confining pressure is analysed, the condition triggering multiple sliding failure and characteristics of failure plane are given, under the co - action of inclination of connective joints ( bedded planes ), interlocking conditions of critical joints and confining pressure

    並在室內利用巖石三軸剛性伺服機,通過模型試驗對巖體的層面和一組與層面正交的節理的情況進行模擬研究,分析了結構面性狀和圍壓對復合式滑移破壞的影響,給出了在貫通性結構面(層面)傾角、非貫通性結構面以及圍壓等因素共同作用下,節理化巖體發生復合式滑移破壞的條件以及破壞面特徵。
  4. Testing on rock sample data in dispersed shaly sands it shows that adding another parameter ( n ) to the model can decrease the relative error of fitted co. however, when we consider the difference of electrical properties between clay - bound water and formation water in the model, although another parameter ( qv ) is added to the model, the relative error of fitted co is increased slightly

    通過一組分散泥質砂巖巖樣實驗測量數據的計算。表明模型中增加參數n ( m n )可以使擬合的c _ t的相對誤差減小,但在考慮粘土結合水與地層水導電性差別時,模型中雖多加一個參數q _ v ,卻沒有減小擬合的c _ t的相對誤差。
  5. ( 2 ) based on indoor test, two typical soft rock of brecciated mudstone and siltstone in luohu jiancheng district is carried systemically though interior rheological testing ; moreover combining with preceding studying results of rock rheological constitutive model, rheological numerical constitutive model suited to rock mass mechanics characteristics and stratum structure of luohu fracture zone, and numerical parameters of the model are processed with studying of curve fitting

    ( 2 )立足於室內試驗,對羅湖建成區兩種典型的軟弱巖石?含角礫泥巖和粉砂巖進行系統的室內流變試驗研究,又結合前人對巖石流變本構模型的研究成果,分析並確定了適合羅湖破碎帶巖體力學特性及地層構造特徵的流變計算本構模型,並對該模型的計算參數進行了曲線擬合研究。
  6. Based on testing data in worksite and engineering practice, the strata damage movement characteristics, rock properties of weathered zone and qualitative and quantitative analysis of the mechanism of coal layer safety extraction in efflorescent oxygenized belts were discussed

    摘要根據現場觀測和工程實踐,論述了風氧化帶內煤層開采時,覆巖破壞移動特徵,風化帶巖石屬性和風氧化帶內煤層安全開采機理的定性、定量分析。
  7. The result is that this gas pool has simple structure, only forms a little nose - like structure at the district of fenghuangshan ; this pool belongs to delta front sub - facies sedimentary model, the underwater distributary channel and mouth bar is the better sedimentary microfacies ; the physical property of the reservoir is poor, the type of pore of the reservoir rock mostly are intergranular pore, intergranular solution hole and little are intercrystalline micropore ; the influential factors of pore structure and physical property are lithofacies, lithologic character and diagenesis ; the off - take potentia of all the testing well are deadly shortness, the wells have the worth of industrial recovery only under the condition of going through sand fracturing, and in the early of binging into production, the oil and sheath pressure drop rapidly, the production of the well drop rapidly

    研究認為該氣藏構造簡單,只在鳳凰山形成了一個小型的鼻狀構造;屬於三角洲前緣亞相沉積模式,水下分流河道和河口壩是有利的沉積微相;儲層物性差,儲層巖石的孔隙類型主要有粒間孔、粒間(內)溶孔及少量晶間微孔;影響蓬萊鎮組氣藏儲層孔隙結構及儲集性的因素有巖相、巖性條件及成巖作用;所有測試井自然產能都極低,必須經加砂壓裂后才有工業開采價值,且投產初期,油套壓下降較快,氣井產量下降迅速。
  8. 176 drillholes, 9 coreholes, 178 trial pits, refurbishment of 48 existing standpipes piezometers, laboratory testing of soil and rock samples obtained from the investigation works along tuen mun road

    176個鉆孔, 9個土芯鉆孔, 178個探井,重整48個豎管測壓計及一系列的土壤和巖石樣本的實驗室試驗。
  9. 224 drillholes, 250 trial pits, refurbishment of 48 existing standpipes piezometers, laboratory testing of soil and rock samples obtained from the investigation works and the structural condition survey on existing highway structures along tuen mun road

    224個鉆孔, 250個探井,重整48個豎管測壓計,將所取得的土壤和巖石樣本進行實驗室試驗,以及對屯門公路上現有的公路建築物進行結構狀況勘測。
  10. Standard test method for testing rock slabs to evaluate soundness of riprap by use of sodium sulfate or magnesium sulfate

    通過使用硫酸鈉和硫酸錳測試巖石厚板以評價亂石安定性的標準試驗方法
  11. 2. by using the rmt - 150b servo rock testing system, we have performed uniaxial compression test and analysed mechanical parameter of swelling pressure at different water contents. 3

    利用自製的膨脹儀,對紅山窯膨脹巖進了側向約束無荷載膨脹試驗、側向約束軸向加壓條件下的膨脹試驗以及膨脹壓力測試。
  12. The design of automatic testing system for pneumatic rock drill

    氣動鑿巖機性能測試系統的研製
  13. In qiaokou area, deep parts of well qiaol4, 20, 23, 25, 60 are related to source rock in gegangji sag, while crude oil in well qiao38 is related to source rock in qianliyuan sag ; in baimiao structure, crude oil in well bail2 is related to source rock of es33 - es34 in qianliyuan sag, while condensate in well bai54, 17, 9 is related to source rock of es32 in qianliyuan sag and crude oil in well bai6 is from oil kitchen gegangji. the study on illite age testing, inclusion enclave temperature testing and saturation pressure testing has been used to know the time of the deeply buried gas net pay formed. the time of the deeply buried gas net pay formed can be divided into two stages

    油源對比結果表明杜寨地區濮深15井的凝析油來源於本區es _ 3 ~ 3 es _ 3 ~ 4地層,前8井es _ 3 ~ 2原油來源es _ 3 ~ 2地層;橋口地區東翼葛崗集窪陷一側的橋14 、 20 、 23 、 25 、 60井深層油氣與葛崗集窪陷烴源巖有關,橋口壘塊橋38井原油與前梨園窪陷烴源巖有關;白廟構造翼部白12井原油主要與前梨園窪陷es _ 3 ~ 3 es _ 3 ~ 4段烴源巖有關,構造腰部白54 、 17 、 9等井的凝析油與前梨園窪陷es _ 3 ~ 2段烴源巖有關,白16井原油來源於葛崗集生油窪陷。
  14. Testing of direct shear strength for rock and soil

    巖土室內直接剪切強度的測定
  15. Testing of shear strength for rock mass in situ

    巖體原位抗剪強度的測定
  16. Summary must be a condensed version of body of the report, written in language understandable by those members of mine management who may not be specialists i the field of rock testing, but who are nonetheless responsible for the work

    原譯:摘要必須是報告的編寫本,要以礦山管理部門人員能夠理解的語言編寫,這些人雖不是巖石試驗方面的專家,但他們對這方面的工作負責。
  17. Soil and rock testing public works category

    土壤及巖石試驗
  18. Soil soil and rock testing

    土壤及巖石試驗
  19. The basic methods of wavelet analysis is introduced with its application to the signals obtained in rock testing

    摘要介紹了小波分析的基本方法及其在巖石測試信號分析中的應用。
  20. If this research could be used in rock testing experiments, the error produced by man eyes and manly controlling can be purged., and the experiment efficiency could be highly increased. it can improve the normal regulations rock experiment technology

    該研究成果投入生產使用后,將大大緩解工作效率低的矛盾,解決傳統測試過程人工觀察、手工計時的誤差問題,對常規巖石物性測試技術的整體提升將起到積極的促進作用。
分享友人