rock-faced dam 中文意思是什麼

rock-faced dam 解釋
堆石護面壩
  • rock : n 1 巖,巖石,磐石,巖壁;卵石;〈常 pl 〉〈美口〉石子兒;暗礁,巖礁。2 〈the R 〉直布羅陀 (Gibr...
  • faced : adj 〈多用以組成復合詞〉具有…臉型的,有…表面的,有…貼邊的。 a marble faced brick building 大理石...
  • dam : n 1 水閘,壩,堰。2 壩中的水。3 【礦物】坑道堰。4 (牙科用的)橡皮障。5 〈比喻〉障礙。vt 1 築水閘...
  1. For example the concrete faced rock - fill dam in frigid zone is distinctive in terms of frost resistance and durability, cushion material seepage prevention and frost heave, adaptability of darn filling with season coordination among construction diversion, flood discharge and the whole construction schedule etc. lianhua construction which is situated in mudanjiang basin of heilongjiang province firstly creates the successful record of construction of large - size faced rock - fill dam in frigid zone, a series of internal and external problems not having a precedent to go by have been solved

    如在面板的抗凍耐久性、墊層材料防滲和凍脹特性、壩體填築與季節的適應性、導流和度汛與總體進度的協調等方面,寒冷地區混凝土面板堆石壩均有其獨特之處。蓮花工程位於黑龍江省牡丹江流域,首創了高寒地區修建大型面板堆石壩的成功記錄,解決了一系列國內外均無先例的難題。
  2. Experimental research on grouting soft rock foundation under toe slab of siping concrete faced rockfill dam

    寺坪面板堆石壩趾板軟巖基礎灌漿試驗研究
  3. The dam for chahanwusu hydropower station is the first one among the concrete faced rock - fill dams under construction with the height of over 100 m and the toe slab being constructed on thick and deep cover in china

    摘要察汗烏蘇水電站水庫大壩為目前在建的河床趾板建在深厚覆蓋層上國內首座百米級的混凝土面板堆石壩。
  4. Through test and research of zipingpu reservoir concrete faced rockfill dam ' s material and finite element analysis of the dam, physics and mechanical characteristics were studied, such as characteristics of rock, compaction, permeability, compressibility and so on, of the no viscous moraine and gravel. at the same time, the mutual relation of physics and mechanical characteristics were studied

    對紫坪鋪面板堆石壩築壩料試驗研究,了解堆石料等無粘性粒狀土的巖性、級配、壓實性、滲透性、壓縮性等物理力學性質,以及物理性與力學性之間的相互關系。
  5. Surface wave velocity detecting tests and dry density detecting tests by pit replacement method were conducted respectively for the transient material ( a ) and main rock - fill material ( b ) used in the construction of concrete - faced rock - fill dam of shuibuya project

    摘要以水布埡面板堆石壩施工中的過渡料( a )和主堆石料( b )為主要檢測對象,分別進行了面波波速和試坑置換法干密度的對比檢測試驗。
  6. Impact of rheological property of rockfill on shuibuya concrete faced rock - fill dam

    堆石流變性對水布埡面板堆石壩性狀影響的研究
  7. Technology research of compression side wall of shuibuya concrete faced rock - fill dam and application

    水布埡面板堆石壩擠壓邊墻技術研究及應用
  8. Base on data, distortion character of lianhua faced rock - fill dam body has been reappeared by non - linear denken e - b model fem analysis ; at the same time, parameters in calculation accordant with model are adopted either in construction stage or in storage period

    本文根據資料所進行的非線性鄧肯e - b模型有限元分析,計算分析了蓮花面板堆石壩壩體的變形性狀;同時在計算中,無論施工期或蓄水期,都採用與模型配套的統一的參數。
  9. The concrete faced rock - fill dam is attached increasingly to importance in the hydraulic construction field because of some advantages such as : small section, good safety, convenience of construction and low cost of construction etc. the concrete faced rock - fill dam, which is located in the cold area, during construction process, is needed to have localization and applicability

    混凝土面板堆石壩具有斷面小、安全性好、施工方便、造價低等優點,日益受到工程界的重視。位於寒冷地區的混凝土面板堆石壩,在施工過程中,更要具有針對性和適用性。