running load 中文意思是什麼

running load 解釋
活動載荷
  • running : adj 1 跑的,邊跑邊走的;流動的,流體的;【機械工程】操作中的;現在的,現行的;【植物;植物學】纖...
  • load : n 1 裝載,擔子;負擔;工作(負荷)量。2 (車船等的)裝載量;一馱,一車,一飛機。3 【電、機】(機...
  1. It looks upon water resistant as load, simulate every instance of locomotive running and check its every parameter automatically, then collect and dispose these data of parameters, calculate the power of simulating running of locomotive, which is based on the current, and voltage of host dynamotor. afterward, it can be judged from the working state of locomotive. through experiment and adjust each parameter, it can provide important warrant to the components of locomotive whether they can work normally and credibly

    即以水阻作為負載,模擬機車運行,對機車的主發電動機的電流、電壓和柴油機的轉速等參數進行檢測,並對檢測結果進行處理,計算出模擬機車運行時的功率,並以此為依據,對機車的工作狀念進行判斷,通過水阻試驗,調整有關參數,使機車運行時能發揮所要求的功率和滿足規定的工作特性。
  2. Full load running

    滿載負荷滿載運轉
  3. A study on the characteristics of training load control of elite athletes of long and middle distance running

    世界優秀中長跑運動員訓練負荷控制特徵的研究
  4. Prospect dtzziii series weight - load controller sensor part adopt bridge - type strain piece sensor, and applies steady installation technology to insure sensors running steady and long - range. we provide multi - kinds of sensor installation method. sensor can be installed under the car bottom, on elevator rope hitch plate, on car top wheel and axle and car top beam to work together with controller

    前景dtzziii系列稱重控制儀的稱重傳感器部分採用橋式應變片傳感器,應用平穩安裝技術確保長期穩定運行稱重傳感器提供多種安裝方式,可以安裝于活轎底電梯的轎廂轎底電梯繩頭板處電梯轎頂輪軸處電梯轎頂橫樑上面等,與控制儀配合使用。
  5. As a new type gear transmission, double circular arc profile bevel gearing carries out its transmission by means of meshing between convex - concave tooth profile in both of the direction of tooth trace and the direction of tooth depth, so it has advantage of high load capacity, long service life, easy forming hydrodynamic oil film between teeth as well as high quality of running - in etc. therefore, more attention has been paid to its application and research in recent years

    作為一種新型齒輪傳動方式,雙圓弧弧齒錐齒輪傳動不論在齒線方向、還是在齒高方向,均為凸、凹齒廓相嚙合,因而它比一般的弧齒錐齒輪傳動的承載能力高,使用壽命長;並且在嚙合過程中兩齒面間容易形成潤滑油膜,具有良好的跑合性能,所以對它的應用和研究日益受到人們的重視。
  6. From the vehicle safety angle, it provides theory and technical support for the research on automatic drive, intelligent drive and traffic safety. this paper is based on the study of single car external flow field about the simulation on the ground boundary layer, the rotating wheels and the crossing wind load, and on the two cars running - in - row and overtaking maneuvers

    同時使用穩態超車的研究方法,利用了階背式、快背式和廂式mira模型代替轎車模型進行了不同車型超車過程的對比研究,利用定性和定量兩種方法研究了不同轎車車型在超車過程中的異同。
  7. Valve running thrust which represents 90 % of the travel of the valve stem can be determined by adding stem load and stem packing friction

    閥門運行推力只是閥門閥桿行程力的90 % ,因此測算閥門推力時,要加上閥桿負載和閥桿填料摩擦力。
  8. Leaving the rated load, especially with low load and free running operation, ihe efficiency of turbocharger and ratio boost pressure decrease, leading to the shortage of air in cylinders and worsening of combustion, and the economic, power and exhaust performances deteriorate

    當偏離標定點,尤其在低負荷和空轉工況工作時,增壓器效率降低,增壓壓力明顯下降,導致氣缸供氣不足,缸內燃燒不良,柴油機的經濟性能、動力性能和排放性能將嚴重惡化。
  9. From the starting of running and braking property of inertia load in this article, the method of simulation of inertia load is analyzed, including the simulation of reducer and flywheel, and the electronic simulation idea is brought forward in allusion to the problem of those methods

    本文從慣性負載的運行及制動特性入手,分析了模擬慣性負載的方法,包括用減速機、飛輪來模擬,針對這些方法存在的問題提出了電模擬法的思想。
  10. Actually, known the distribution of electric price and demand of heat load versus time, an optimizing supply curve can be drawn, that is, the concrete economically running policy can be made

    實際上,在已知逐時電價曲線和用戶熱負荷曲線的情況下,應存在一條最優的供熱曲線(或電鍋爐啟停曲線) ,這條曲線可利用最優化理論和適當的優化方法來找到。
  11. After studying the prediction method and considering the complex, random and nonlinear factors that affect the demand load of heating, the ann technology is adopted. different from the general analysis in technology and economy, it is for the first time to combine the prediction in method of artificial neutral network with optimization in use of dynamic planning principle for the running analysis of the electric boiler

    考慮到影響供熱採暖需求負荷的因素復雜且具有隨機性和非線形性,在對預測理論進行研究和對各種預測方法進行比較后,本文首次將基於人工神經網路的負荷預測與基於動態規劃原理的優化方法相結合,用於蓄熱式電鍋爐系統的經濟運行策略研究。
  12. The main work is as following : firstly, some basic issues of economical operation of transformers are analyzed. focusing on calculating the economic load coefficient and carving up the running area of the transformer, determining the advantage between transformers, confirming economical operation mode of transformers in the parallel or divided running condition

    分析了變壓器經濟運行的一些基本問題,主要對變壓器的經濟負載系數的計算、運行區間的劃分,變壓器間技術優劣的判定以及並列和分列運行模式下經濟運行方式的確定進行了分析和討論。
  13. The safety of the running train is an important subject in railway vehicle system dynamics. the condition of derailment and indices of vehicle are important parameters that are defined for safety evaluation of the running train. according to the running condition of vehicle, the paper discusses derailment safety of vehicle in four respects : the coefficient of derailment for a single wheel, the coefficient of derailment for wheel - set, the derailment condition caused by wheel load reduction, relation between the coefficient of derailment and the rate of wheel load reduction. factors affecting the indices are systematically investigated. suitable conditions of derailment of vehicle are given. the results show that h / p1 can be used to evaluate the derailment safety, inwhich h is a force acting on wheel - set in the direction of lateral and p1 is a force acting on the derailment wheel in the direction of vertical

    車輛脫軌條件和評定指標是衡量車輛安全運行的重要指標.根據車輛運行狀態,從單輪脫軌條件和評定指標、輪對脫軌條件和評定指標、由輪重減載引起脫軌的條件、脫軌系數與輪壓減少率的關系等4個方面對車輛的脫軌安全度進行了探討,分析了影響車輛脫軌的因素,並指出車輛脫軌評定條件的適用情況.結果表明,採用作用於輪對的側向力h與作用於脫軌側車輪的垂直力p1之比檢算車輛的脫軌安全度較為合理
  14. It includes : solving " excess attempt " and " defective attempt " of agc by load prediction in extraordinary shot time, that is preceding control technique ; ( 2 ) enhancing the regulating capacity and speed of agc of chongqing network by 5 measure ; analyzing the policymaking that chongqing network could achieve criterion now or after three gorges power station running, discussing the managing measure how to enhance regulating capability of agc of chongqing network

    其中包括:利用超短期負荷預報解決agc 「過調」和「欠調」問題的超前控制技術;以5種實現方式提高重慶電網agc可調量和調節速度;探討了當前和在三峽電站投運后重慶電網達到考核標準的對策,討論了從管理上提高重慶電網agc調節性能的辦法和措施。
  15. Load test results stores running load tests

    監視和分析負載測試運行
  16. Running load tests

    >運行負載測試
  17. Team system testing tools provides several options for running load tests

    Team system testing tools提供了若干運行負載測試的選項。
  18. Team edition for testers provides a tool for creating and running load tests

    Team edition for testers提供了創建和運行負載測試的工具。
  19. Describes the different options for running load tests, including command line and user interface

    描述運行負載測試的不同選項,包括命令行和用戶界面。
  20. The controller provides a general architecture for running tests, and includes special features for running load tests

    控制器提供了運行測試的通用結構,並且具有運行負載測試的專門功能。
分享友人