running time estimate 中文意思是什麼

running time estimate 解釋
運行時間估計
  • running : adj 1 跑的,邊跑邊走的;流動的,流體的;【機械工程】操作中的;現在的,現行的;【植物;植物學】纖...
  • time : n 1 時,時間,時日,歲月。2 時候,時刻;期間;時節,季節;〈常pl 〉時期,年代,時代; 〈the time ...
  • estimate : vt 1 估計,估算;估價;估量。2 評價,評斷。3 〈古語〉尊重。vi 估計,估價。n 1 估計;預測;〈英國〉...
  1. 4. relationship between simulation running times and construction time limit estimate precision is discussed, which solves the problem that how many running times are required in order to reach a certain construction time limit estimate precision

    4 .探討了施工系統模擬運行次數與施工工期估計精度之間的關系,解決了要達到某一施工工期估計精度所需模擬運行次數的問題。
  2. With the using of microsoft visual basic 6. 0, a multimedia computer - aided design system of small type pumping irrigation district is developed in this paper. provided with the live multimedia messages as well as a good man - machine conversation mechanism, this system can help the user to finish the planning of an pumping irrigated area such as the layout of canal system, the selection of pump models, the establishment of the irrigation program, the calculating of canals " parameters, the estimate of the project magnitude, the selection of the field constructions, the economic analysis of the project, the output of results, etc, a new oo ( object oriented ) programming method is adopted in this system, various softwares are integrated in this systems as well by the " automation " technic provided by vb, in addition, the multimedia technic is applied to this system for the first time, it makes the system easy to ope rate. as for the optimization of the canals " section, a new optimization method is adopted based on the existing theories about the canals " section, and in this way, with the purpose of minimizing the project ' s investment as well as a stalized canal, limited by the longituding slope, the canals " best feasible parameters can be deduced. furthermore, a integral method to reckon the earth work is developed in this paper, by this way, the estimate precision of the earthwork is enhanced notably. this paper includes the particular illumination for the developing procedure of each systems " segment, and in the end, the directions of the system are demonstrated in a sample area which lies in the zhaija village, taizhou city, jiangsu province, the running results showed that the initial purposes are achieved effectively, and it has a preferable practicability

    在渠道縱橫斷面優化方面,本文在利用已經比較成熟的縱橫斷面優化理論的基礎上,提出以工程總費用最小為目標函數,以渠道縱坡i為控制變量,以渠道不沖不淤流速及灌區允許地面比降為約束條件,通過縱橫斷面聯動優化的方法得到渠道的最佳工程可行的斷面參數。另外,針對部分地區的取土困難的狀況,本文採用積分法計算渠道工程土方量,從而大大提高了土方量的估算精度,有助於準確控制工程投資規模及資金投向。本文詳細闡述了該系統所採用的編程方法、系統構成、系統各組成模塊的開發過程以及灌區規劃所採用的優化方法及原理,最後應用本系統對泰州市翟家村機電灌區進行規劃設計,運行結果證明其操作比較簡便,界面友好,運行速度快,規劃成果合理,基本達到了系統預定的要求,具備較強的實用性。
  3. The constructionspeed of highwayincreases rapidly, at the same time, the path qualityexaminationdutyaggravatesdaybyday, andtheload ofroads evaluationalsoincreases quicklyin the maintenance. traditional method has many disadvantages, such asinefficiency, tiring, slow speed of evaluation etc. especially, the number ofmeasuring point is too little to give accurate and comprehensive result of theinterior recessive diseases of highway. beside this, the traditional method leadsdestructiontotheroadsurface, whichwillexacerbatethedeteriorationofhighway. in avoid not to affecting the normal travel and not to destroying the pavementstructure, it is urgently to apply nondestructive evaluation ( nde ) techniques tocontrol quality of highway construction and to estimate the running conditionaccurately. the nde techniques of highway have to satisfy the followingqualification : mapping the shape, size and depth of flaw precisely ; having nodamages to the road structure ; being capable of carrying out examination in widerange ; beingeasytoequipandoperate ; beinginsulatetotheenvironmentinfluence. theintelligenceintegrationevaluationvehicleforroadbedandpavement ( iievrp ) is just the comprehensive nde technique that can satisfy the demands above, which can implement detection of highway rapidly and nondestructively

    作為吉林省科技廳高新技術項目( 20020331 ) 「路基路面智能集成檢測車」的一個子項,本文在理論的基礎上,結合實驗對探地雷達檢測路面結構層厚度及路基、路面病害進行了研究,主要工作如下: 1 .闡述探地雷達發展的歷史和研究現狀,介紹探地雷達在路面結構層厚度檢測與路基、路面病害識別上的應用,分析探地雷達設備性能,探討其測量參數對探測性能的影響; 2 .引入matlab計算軟體,利用其中的小波分析工具箱對探地雷達信號進行分析處理; 3 .構建適于道路檢測的車載實驗平臺,為進一步完善路基路面檢測車系統打下了基礎; 4 .通過對模型的檢測,對探地雷達探測性能做出定性或半定量的評價; 5 .通過對實際路面的檢測,驗證探地雷達在道路檢測中的有效性。
  4. Because of the defect of long running time and big complexity in the classical job - shop scheduling algorithm, the paper brought forward an intelligent optimization algorithm based on rule ; scheduling process is divided to primary process and optimization process. through the method of ahp ( analytical hierarchy process ), the effect is researched between several rules and estimate. moreover, the results of ahp are used as a measurable standard to scheduling results

    本文針對傳統車間作業調度演算法運行時間長,復雜度大的缺點,提出了基於規則的智能優化調度演算法,將排序的過程分為初始排序與優化排序;基於多目標決策的層次分析方法,得出了各種規則與系統評價指標之間的影響度,其結論為生產計劃方案的選擇提供了定量的參考依據。
  5. Abstract : an algorithm of minimizing the number of buffers under certain delay constraint with accurate delay models is presented. given a two - terminal net, the algorithm can minimize the total number of buffers inserted to meet the delay constraint. a high order delay model is applied to estimate interconnect delay and a nonlinear delay model based on look - up table is for buffer delay estimation. the experimental results show that the algorithm can efficiently achieve the trade - offs between number of buffers and delay, and avoid needless power and area cost. the running time is satisfactory

    文摘:提出了在精確時延模型下,滿足時延約束的緩沖器數目最小化的演算法.給出一個兩端線網,該演算法可以求出滿足時延約束的最小緩沖器數目.運用高階時延模型計算互連線的時延,運用基於查找表的非線性時延模型計算緩沖器的時延.實驗結果證明此演算法有效地優化了緩沖器插入數目和線網的時延,在二者之間取得了較好的折中.演算法的運行時間也是令人滿意的
分享友人