safety evaluation 中文意思是什麼

safety evaluation 解釋
安全評估
  • safety : n. 1. 安全;平安,穩安,保險。2. (槍等的)保險器,安全瓣;〈口語〉低座腳踏車[自行車] (=safety-bicycle)。3. 安全設備,保險裝置。4. 【棒球】安全打。
  • evaluation : n. 1. 估價,評價。2. 【數學】賦值,值的計算。
  1. Cogitation on safety evaluation of shutdown and restart of buried waxy crude pipelines

    含蠟原油管道停輸再啟動的安全性問題
  2. Analysis of tunnel in different permeate water pressure shows that the concretive rock surrounded the reinforced concrete liner has a great contribution the permeate water pressure. thus, the surrounding rock, together with the concrete liner, should be considered in safety evaluation of the tunnel

    通過對外水壓力變化情況下的不同分析,表明鋼筋混凝土襯砌和固結圍巖的聯合作用明顯,安全評估時應考慮襯砌和圍巖的聯合受力作用。
  3. Anti - bacterial effects and safety evaluation of propolis aerosol

    蜂膠氣霧劑的抑菌試驗與安全性評價
  4. Protection safety evaluation of the radionuclide 131 i treatment

    型核子濕度密度儀的輻射防護
  5. Safety evaluation of transgene food

    轉基因食品的安全性評價初探
  6. For the safety evaluation of donghuayu aqueduct bridge, the main problem is that no seismic design code is valuable

    對于東滑峪渡槽的安全性能評估,存在的主要問題是渡槽的抗震設計無本行業的相關規范可循。
  7. Analysis on present situation of coal mine safety evaluation

    煤礦安全評價的現狀分析
  8. Problem and countermeasures in coal mine safety evaluation

    煤礦安全評價存在的問題及對策
  9. The analysis and safety evaluation on the dynamic stability are the key technique of high - speed railway over - section cwr. studying on a theory for dynamic stability of high - speed railway cwr and a method for safety evaluation is of great theory value and realistic meaning

    高速鐵路無縫線路動力穩定性分析及其安全評估是高速鐵路跨區間無縫線路的關鍵技術之一,其研究具有重要理論價值和現實意義。
  10. The application of the fuzzy comprehensive evaluation in demolition blast safety evaluation

    模糊綜合評價在拆除爆破安全評價中的應用
  11. Abstract : the derailment safety evaluation test and evaluation standard f or railway cars running on curve in poland are described

    文摘:介紹波蘭鐵道車輛在曲線上運行的脫軌安全性試驗及評定標準。
  12. Seismic safety evaluation of important engineering sites, isolation, prediction of earthquake damages and earthquake resistant capability evaluation of structures, explosion seismic effects etc

    重大工程場地地震安全性評價;隔震減振;建築結構震害預測及抗震性能評估;爆破地震效應等。
  13. Abstract : according to the safety evaluation of qiongzhou strait rail - ferry engineering , the construction protocol feasible to the rail - ferry engineering in straits and rivers in china is demonstrated. the relevant safety issues in the design and operation of the rail - ferry port are discussed. the priority issues need to considered and their safety countermeasures should be taken in the design of the project are proposed

    文摘:通過對粵海鐵路通道瓊州海峽鐵路輪渡工程的安全評價,闡述了適合於我國海峽及內河鐵路輪渡碼頭工程的建設方案,對鐵路輪渡碼頭工程設計中及運營中可能出現的危險進行了探討和分析,提出了鐵路輪渡工程安全設計中應重點加以考慮的問題和相應的安全措施。
  14. Based on the theory of safety evaluation and risk assessment, this paper first ascertained the evaluating indices affecting ships ' seaworthiness and classified them according to their importance degrees by experts investigation, and used judgment matrix method to calculate weight of the evaluating indices, and then got the membership function by fuzzy collection theory, and finally established the mathematical model to realize a fuzzy comprehensive evaluation to ships ' seaworthiness

    摘要根據安全評價理論、風險評估理論,通過專家調查方式確定影響船舶適航性的評價指標並按照重要程度進行分類,然後採用判斷矩陣法計算評價指標的權重,運用模糊集合理論確定隸屬函數,進而建立數學模型,實現對船舶適航性的模糊綜合評價。
  15. Safety evaluation for dam stability of zhenziling reservoir

    榛子嶺水庫大壩穩定安全評價
  16. Safety evaluation of dam in paoziyan reservoir

    泡子沿水庫大壩安全評價
  17. Safety evaluation and its application on coal mine ventilation system

    礦井通風系統安全性評價及其應用
  18. Fuzzy arrangenment comprehensive safety evaluation of metal mining ventilation system

    金屬礦山通風系統模糊層次綜合安全評價
  19. Principle of determining coal mine safety evaluation system and its applicable analysis

    煤礦安全評價指標體系確定原則及其應用分析
  20. In general, both of them are used to verify the results. using geomechanical model test method, the overloading process and wreck character of high arch dam was emulated completely for tengzigou arch dam. it is emphasized for stabilization safety evaluation various major loading function of high arch dam must be accounted and arch dam ' s whole stability is the most important

    本文用地質力學模型試驗方法分析了藤子溝拱壩的超載過程和破壞特徵,並強調無論是超載試驗還是超載計算分析,在評價拱壩安全度時都應綜合考慮各種影響拱壩受力的主要荷載因素,以拱壩整體工作能力作為評價依據。
分享友人