schedule constraint 中文意思是什麼

schedule constraint 解釋
進度限制
  • schedule : n 1 目錄。2 表(格);清單,明細表。3 〈美國〉程序表,計劃表;進度表;時間表。4 〈美國〉預定日期...
  • constraint : n. 1. 強迫,拘束。2. 約束,壓抑,拘泥。3. 強制力。4. 緊張感[狀態]。
  1. Microsoft project adds the constraint and recalculates the schedule

    Microsoftproject將添加限制並重新計算日程。
  2. Resource constraint is usually the main restricted factor of the operation of cross - enterprise project. utilizing the resources properly is the most critical factor for a cross - enterprise project to succeed. project schedule is the most efficient method to arrage the resources and makes them stand in the right way

    資源約束往往成為在跨企業項目運行的主要制約因素,合理利用跨企業項目中有限的資源是跨企業項目成功的關鍵,項目計劃是調配資源有效使用的最主要手段。
  3. When you want to track a deadline for a specific task but do n ' t want to lock your schedule by setting an inflexible finish constraint, you can set a deadline date for the task.

    當您想通過設置「非彈性完成日期限制」跟蹤某項特定任務的期限但又不想鎖定日程時,可設置任務的期限。
  4. If you want microsoft project to automatically recalculate a constrained task ' s start and finish dates when the schedule changes, you can choose to have schedule changes override constraint dates

    如果希望在日程更改時, microsoftproject能自動重新計算受限制任務的開始日期和完成日期,則可以讓日程更改忽略限制日期。
  5. To cope with existing kiosks, a physical constraint for installation, where container number verification takes place, 5 different mounting racks are constructed, under critical schedule, that installation is possible inside canopy

    為應付現場工作亭設施對安裝構成的環境障礙,特別安排五支裝配架作檢測識別及記錄集裝箱號碼之用,而毋須安裝于遮篷之外。
  6. The kernel of spm is the triple constraint. both the cost and the schedule are two dimension of the triple constraint

    著名的三維約束是軟體項目管理的核心內容,而成本和進度正是其中的兩維。
  7. Security constraints are consistent by modifying security constraint definition, and an effective classification assignment algorithm is given in this paper. we analyze the problem of inference channel and give solution to solve the problem during database analysis and design period. by analyzing the problems resulting from extending single - level transactions to multilevel transactions, we also give a multilevel secure transaction schedule algorithm based multiversion snapshot graph

    本文提出採用主從結構表的方法對blp模型加以改造,使得改造后的blp模型具有較高的可用性和安全性;通過修改安全約束的定義,使得安全約束之間始終是協調的,並給出一種高效的密級分配演算法;討論了推理通道問題,給出了在數據庫分析、設計等階段可以採用的對策;分析了事務從傳統的單級擴展到多級面臨的眾多難題,給出了一種基於多版本串列化圖的事務調度演算法;根據上述理論,開發了一個多級安全數據庫管理系統的原型系統。
  8. * * * * but constraints can also limit your schedule ' s flexibility. if there ' s a scheduling conflict between a constraint and a task dependency, microsoft project may schedule the task according to the constraint

    如果在限制和任務相關性之間發生日程沖突, microsoftproject將根據限制來排定任務。
分享友人