scheduling program 中文意思是什麼

scheduling program 解釋
排日程計劃
  1. Chapter 6 provide a study on the delivery network of port physical distribution system, and we define single physical distribution center location by the center - of - gravity method, multi - physical distribution center location by clustering - based method and dynamic physical distribution center location by dynamic programming model, and the lines of vehicles have been optimized by vehicles scheduling program ( vsp )

    第六章主要是探討港口物流系統的配送網路,運用重心法確定單個配送中心選址、分組法解決多個配送中心選址和動態規劃解決配送中心動態選址問題,並用里程節約法( vsp法)對配送線路進行優化,尋找最佳運輸線路。
  2. In this paper, genetic programming is applied to optimize the mine transportation vehicles scheduling, which realized automation and intelligence in mine transportation vehicles scheduling. application program is also developed to optimize mine transportation vechiles scheduling, and the probability character of genetic algorithm is also analysed and researched

    本文將遺傳規劃應用於礦山運輸車輛優化調度之中,實現了礦山運輸車輛調度的智能化和自動化,對遺傳演算法的概率特性進行了分析研究,並研製了礦山運輸車輛調度優化的應用程序。
  3. We also offer vacation secretariat and counseling services for your airport pickup / delivery, journey scheduling, fitness, body - building, blood pressure testing, kid nursing, children communication program, romantic appointment, commercial meeting and holidays

    酒店提供度假秘書咨詢服務,不管是從接機送機、行程安排、健身康體、美容保健、測量血壓、兒童看護、親子計劃,還是浪漫約會、商務際會、高峰度假,悅華度假秘書將盡其所能為您提供服務。
  4. On the basis of a program of advanced manufacturing r & d initiative funded by the state development and planning commission, the thesis designed a prototype of shop floor control architecture, constructed software framework with uml and provided a scheduling example

    在對國家「九五」科技攻關項目延伸和擴展的基礎上,設計了車間控制方式的實驗原型,應用uml構造了agent的基本編程框架,給出了相應的調度實例。
  5. I leave the task of scheduling the execution of the program to the reader, as system - dependent methods for doing so are often superior to simple programmatic ones

    我把程序執行調度任務留給讀者,因為執行這些任務的與系統相關的方法通常比簡單的編程方法高級。
  6. Rm profile - based dynamic voltage scheduling using program checkpoints. in proc. design, automation and test in europe conference date, washington : ieee computer society press, march 2002, pp. 168 - 178

    完成任務內的電壓調節需要藉助于編譯技術,在程序內部插入電壓調節點,根據當前時間和任務的運行需求調整電壓。
  7. The main idea of this hybrid algorithm is : at first, all candidates in task collection is lined according to a dispatching rule ( earliest due date, edd ), then this linear queue is divided into some tiers under a criterion that partial order is not allowed to exist in the every tier, many feasible sequences is generated by constructing a neighborhood of a initial sequence in every tier, the allocation of the resources over time is conducted to perform every feasible task sequence, and a set of approximate optimal scheduling schemes is achieved as the precondition of the next tier ’ s disposal in meeting multiple scheduling objectives to obtain the global near - optimal schedule which makes these program run tier by tier until the last task is completed

    該演算法按照最早完工時間優先( ect )分派規則,先將參加排序的工序合併成一個串列序列,然後按照同層內不存在偏序關系的原則,將其分解為若干個時間上相互銜接的層次,在每個層次內部,通過構造鄰域產生出多個可行序列,對每個可行序列進行設備配置,採用鄰域搜索演算法進行方案的尋優,保留一組滿足評價要求的可行方案作為下一層設備配置的背景環境,通過層層遞進最終獲取全局的近似最優解。
  8. Agv ( automated guided vehicle ) optimization is a typical np problem, in the course of initial group generation, this article applied accumulator process, crossover operator based continuous insertion heuristic mode, and push - connect - exclude method. according to stacker running process and characteristics, stacker optimization was devided into two parts, the first one was shelves number optimization, the second one was travel scheduling problem. finally, this article written genetic algorithm program based on c

    Agv的優化調度屬于典型的np問題,在初始群體的產生中,採用聚加過程,並建立了可行插入的條件;提出了基於連續插入啟發式的交叉運算元;採用了推?銜接?排除過程來使任務的滿意度達到最佳;針對堆垛機的運行過程,建立了數學模型,並依據其運行特點,把堆垛機的優化分為兩部分,一是針對庫位號的優化,改變傳統的庫位號排列方式,利用遺傳演算法建立起比較合理的庫位號排列順序;二是把堆垛機的運行線路簡化為旅行商問題,並做了適當的修改。
  9. To benefit from these features, we will develope task scheduling techniques that take account of the hierarchical structure and design on - chip multiprocessing supporting mechanisms to further reduce the program execution time

    為了發揮架構特性以提升效能,我們將針對其階層特性,開發工作排程技術,並開發多處理支援機構,以進一步降低程式執行時間。
  10. Here is a larger example of the listbox function that can be used as a scheduling type program

    這是一個列表框控制項函數的大例子,可以用作一個規劃類型的程序。
  11. Listbox - multi example - here is a larger example of the listbox function that can be used as a scheduling type program

    這是一個列表框控制項函數的大例子,可以用作一個規劃類型的程序。
  12. The model scheduling program schedules the model adopting base step scheduling principle

    模型調度程序採用基本步長調度原理對模型實時調度。
  13. Import export wizard merges data into outlook from access, excel, microsoft schedule + calendaring and scheduling program, and other file formats

    導入導出向導可從access 、 excel 、 microsoftschedule +日歷和計劃程序以及其他文件格式中將數據合併至outlook 。
  14. Utilizing the object - oriented technique in agreement with the idea of modern software engineering as the way of modeling, a tree - form layer model base is established which is scheduled by model scheduling program

    建模與模型調度中,利用面向對象的建模方法,建立系統的樹狀層次模型庫,供模型調度程序調度。
  15. What makes a service desirable is that a service can be invoked many times without going through batch scheduling, program initiation, and later termination housekeeping over and over again

    需要服務的原因在於服務可以多次調用,而不需要反復進行批處理調度,程序初始化,以及稍後的終止回收工作。
  16. She also proposed a long - term program to share master s teachings through the collaborative efforts of natv and our association. she devised the plan and then arranged for the program content, style and scheduling

    翁女士還主動提出電視臺與我們長期合作,弘揚師父的善行與理念,並提出具體的計畫和安排播出內容形式時間節目等。
  17. A timed petri nets model for simulating the production scheduling in present process and future continuos casting process has been built. finally, the model has been programming into software based on object - oriented software design methodology with visual basic6. 0 program language. some of case tests have been carried out based on plant practice in steel making division of panzhihua iron and steel corporation the production planning sub - system of lg - idss can be used for making, optimizing and adjusting on - going plan of steel making production in the plant

    本文在分析國內外決策支持系統發展現狀的基礎上,構建了攀鋼提釩煉鋼廠生產管理智能決策支持系統( lg - idss )的框架;重點研究了lg - idss中的生產計劃子系統,建立了適合煉鋼廠現階段和全連鑄生產條件下煉鋼連鑄生產調度模擬的時間petri網模型,最後採用面向對象的軟體設計技術編寫了軟體,並以攀鋼煉鋼廠生產組織情況為例進行了模擬、模擬。
分享友人