seawall 中文意思是什麼

seawall 解釋
海堤;防波堤
  1. Longer term post - construction monitoring of sloping seawall for hard coral establishment, and in case of non - establishment of corals undertake additional mitigations and or translocation of coral polyps

    延長斜坡海堤築成后的監察期,確保硬體珊瑚健康成長若未能達致預期效果,則採取其他緩解措施及或移殖珊瑚蟲
  2. ( 3 ) large enough area must be keep outside the seawall in order that the salt marshes recover naturally

    ( 3 )要想自然恢復鹽沼,則需在堤外保留足夠大的面積。
  3. The analysis indicates that the recovering rate of the salt marshes is related to the residual salt marshes area outside the seawall

    分析表明鹽沼恢復的速度與圍墾以後海堤外側予留的鹽沼面積有關。
  4. The seawall sustains the shock of the waves.

    海堤是能抵擋海浪的沖擊。
  5. Abstract : this paper introduces the scheme, deep cut of foundation pit to bury pipe, which is adopted for wenjiayan seawall in qiantang rever. compared with the scheme of withstanding pipe, this scheme has the advantage of saving investment, simple construction and time + - saving. it is convenient to check the anti - seep installation between water pipe and seawall

    文摘:本文通過錢塘江聞家堰海塘深基坑開挖埋管,替代原設計頂管方案,具有工程投資省、施工簡單、工期短,且便於檢查取水管與海塘之間防滲措施
  6. Seawall and sluice are the parts constructed in advance, while final closure is the last part in construction. the hydraulic condition during the final closure process is worse than that during any other processes. and with the compressing of the entrance, the hydraulic condition becomes badly, the drop height of entrance can reach 2 to 3 meter, the maximum velocity of flow even reaches 6 to 8 meter per second and flow condition also becomes complex

    海堤和水閘的修建都是圍海工程先期施工的部分,堵口則是海堤修築的最後階段,堵口合龍成敗關繫到圍海工程成敗,由於此階段所遇到的水力條件十分惡劣,口門落差可達2 3m ,流速最大可達到6 8m / s ,且水流極其復雜,根據我國《圍海工程技術規范》規定圍海堵口必須進行龍口水力計算。
  7. Composite geomembrane used for impervious structure of seawall engineering

    復合土工膜防滲結構在海塘工程中的應用
  8. The use of a vertical seawall resting above the rock fill mound would minimize the width of the base

    在毛石堆上建造垂直海堤可減少底座的闊度
  9. Associated reclamation and seawall construction ; and

    進行相關填海及海堤建造工程及
  10. Reclamation and associated construction of a 970m long seawall

    填海及興建相關的一條970米長的海堤
  11. Limited reclamation and associated construction of 310m long seawall

    填海及興建相關的一條310米長的海堤
  12. Construction and management of standard seawall in island

    海島標準海塘建設與管理
  13. Construction quality supervision of standard seawall in ningbo

    寧波市標準海塘建設的質量監督
  14. Application of cast - in - situ grid plate to standard seawall

    混凝土柵欄板護面結構在標準海塘工程中的應用
  15. Technical discussion on building standard seawall in soft soil foundation

    在軟土地基上建設標準海塘的技術探討
  16. Rock - fill sloping seawall

    石砌斜面海堤
  17. Associated works on seawall construction, slope stabilisation, landscaping, street lighting and drainage

    進行相關的工程,包括築建海堤斜坡鞏固美化環境裝設街道照明設施和敷設排水渠。
  18. Consolidation of standard seawall in haining reach of qiantang river

    錢塘江海寧標準塘防沖加固技術
  19. We are seriously concerned that due to the collapse of the newly constructed seawall in area w30 of the tseung kwan o reclamation contract ( tko contract ), the planned delivery of 3. 6 million tonnes of public fill from the tko contract to the pbr1 contract could not be made. instead, marine sand had to be used in the pbr1 contract

    委員會深切關注到,在將軍澳填海工程合約( 「將軍澳合約」 )第w30區新建的海堤倒塌,以致利用將軍澳合約為竹篙灣第一期填海工程合約供應360萬公噸公眾填料的計劃未能實現,而須在竹篙灣第一期填海工程合約中使用海砂作為替代。
  20. Wave screens are often constructed on the top of sloping wave protection constructions such as seawall, revetments, etc. to meet the requirements of overtopping and stability and cut down engineering cost

    摘要在海堤、護岸等斜坡式防浪建築物中,為滿足越浪與穩定要求,減少工程投資,通常在堤頂設置防浪墻。
分享友人