section control 中文意思是什麼

section control 解釋
斷面控制
  • section : n 1 (外科、解剖的)切斷;切割;切開。2 【外科】切片,【金相】磨石。3 (果子的)瓣。4 【數學】截...
  • control : n 1 支配,管理,管制,統制,控制;監督。2 抑制(力);壓制,節制,拘束;【農業】防治。3 檢查;核...
  1. The thesis has summarized the development of the oblique - pull bridge, its construction technology and the importance of bridge construction control, then has introduced project general situation, and has narrated detailed regulation, organization construction, the major work and difficult part of this bridge construction control. the following is the key part of this thesis, firstly, it has introduced the experiment work of early stage, structural calculation and its theoretical result : the absolute altitude of each operating mode, the absolute altitude of building mould in each section and the absolute altitude after pouring concrete ; then, it has discussed the method and content of the line shape control of the main beam, actual absolute altitude of building mould is put forward, and it has described the method of structural stress monitoring, how to arrange measure point and collect data, and how to analyze data. it has also narrated the method of rope force detection and structural temperature inspection

    本論文在總結了斜拉橋的發展及其施工工藝,並指出了橋梁施工控制的重要性之後,簡要的介紹了工程概況,敘述了炳草崗金沙江大橋監控細則、組織機構及監控的主要工作和難點部分;論文的核心部分,在介紹了炳草崗金沙江大橋施工控制與監測工作的前期實驗工作和施工各工況標高、各節段支模標高、澆注混凝土后的標高的結構計算和其理論計算結果之後,詳細論述了主梁的標高線形控制方法和內容,實際支模標高的提出,結構應力監控的方法、布點、測讀及其對測讀數據的合理分析方法,索力檢測和結構溫度監測的方法。
  2. This thesis tries to solve the problems in the design and construction of jinping cascade 2 hydropower station. a typical section is selected to analysis seepage, seepage control and fem numerical simulation. the influence of different plans of excavation and support on seepage field of subsurface water and stability of adjoining rock are studied. the homologous support pattern is suggested according to the research results

    本文就錦屏二級水電站(一期)深埋長隧洞的設計和施工中面臨的一些問題,選取隧洞的一個典型斷面進行滲流、滲控分析和開挖及支護的有限元數值模擬,從而就深埋隧洞不同的開挖及支護方式對地下水滲流場及圍巖穩定性的影響和所應採取的支護措施等方面進行了探索、研究。
  3. That how to solve these questions effectively, rearrange the resources more suitably, build assault carrier, enhance the development of medical enterprises, and improve the competition of the enterprises are the tasks for tonghua medical enterprises, local government and main control section of this industry to consider and study

    如何解決好這些問題,進一步整合資源、打造航母,加快醫藥企業發展、提升企業競爭力,是通化醫藥企業、地方政府及行業主管部門正在思考研究的課題。
  4. 1 lower gluing wheel by 2 - section doctor blade to control the volume well, and avoid glue swinging

    1下糊輪采兩段式刮刀,可精確控制糊量,高速運轉不甩糊。
  5. Section two the evaluation of biocompatibility of the acellular dermal matrix by the method of cell culture. the new born rat ' s epdermic cells were cultured with the acellular dermal matrix together as experiment group, while the epdermic cell were cultured simply as control. 24 hours later, under the invert microscope, the epidermic cells anchored well and transparent flat cells were observed in both groups. 7 days later, both cultured cells were taked out and fixed in 95 % ethanol, stained with hematoxylin and were observed under light microscope. many cleaved cells were observed in both groups. during cell culture, no pathogenic microganism was observed. so we considered the acellular dermal matrix was aseptic and had good biocompatibility. section three subdermal implantation of the acellular dermal matrix. 24 rats were used in the experiments. a piece of acellular dermal matrix ( 1. 5 x 1. 5cm2 ) was implanted beneath the dorsum skin flaps of each rat, 1 week, 2 weeks, 3 weeks and 4 weeks after implantation, 6 pieces of acellular dermal matrix were harvested and the size of implanted acellular dermal matrix were measured, the sections were used for he staining and observed under light microscope. the result were as folio wing : 1 - 2 weeks after implantation, the acellular dermal matrix began to adhere to the tissue around and turned red gradually ; 3 - 4weeks after implantation, the acellular dermal matrix adhered closely to the tissue around and could be recognized easily, 1 - 3 weeks after implantation, the size of implanted acellular dermal matrix had no statistical difference ( p > 0. 05 ). 4 weeks after implantation implanted acellular dermal matrix contracted ( p < 0. 05 ). under light microscope, l - 2weeks after implantation, the fibroblast cells infiltrated the acellular dermal matrix and a small amount endothelial cells of vessel and lympho - histiocytic cells infiltrated the acellular dermal matrix. 3 - 4 weeks after implantation, infiltrating blood vessels were evident. so we think that the acellular dermal matrix had low immunological reactions and could induce the infiltration of fibroblast macrophage cell and the endothelial cells of vessel

    結果如下:皮下包埋卜周者,無細胞真皮基質漸與周圍組織粘附,顏色由蒼白轉紅;皮下包埋3周者,無細胞真皮基質與周圍組織緊密枯附,盾晰葉辯;術后卜周,包埋的基質面積變化較包埋前無統計學差異o川0引,術后4周包埋的無細胞真皮基質面積較包埋前縮小j刃刀5 ) 。光鏡下術后卜周,宿主的淋巳組織細胞、成纖維細胞浸入生長,釉附在膠原纖維上,少量血管內皮細胞浸入基質;術后34周,無細胞真皮基質內較多的血管形成,故可認為無細胞真皮基質免疫原性低,能誘導宿主的成纖維細胞、巨噬細胞浸入生長,為一種新型的真皮替代物。第四部分無細胞真皮基質與自體斷層皮片復合移棺的研究, sd大鼠10隻,在其背部卜方造成全厚皮膚缺損的創面
  6. Firstly, the status of our nation ' s water resources, flood and arid hazards is overviewed to illustrate the necessity for study on dynamic control of flood season limited water level. disadvantages in traditional limitsd water level design, static control of limited water level design, static control of limited water level and fuzzy limited water level curve are pointed out, and mending methods for these are introduced. dynamic control and its key problems are analyzed hi next section. the allowable range of limited water level is determined, so as the allowable extreme risk index. the definition of extreme risk is re - illustrated, risk analysis methods in reservoir operation is discussed either. according to the definition of extreme risk rate, the allowable extreme risk rate of reservoir is systematically demonstrated with variant extreme risk indexes and flood season limited water level

    本文首先闡述了我國水資源狀況和水旱災害、說明水庫汛期限制水位動態控制研究的必要性;介紹了傳統汛限水位設計、汛限水位靜態控制、模糊汛限水位過程線存在的問題及其初步改進方法;分析汛期限制水位動態控制的方法及關鍵問題;進一步闡述了水庫極限風險率的定義;根據極限風險率定義,詳細敘述了不同極限風險指標時、不同汛期限制水位下起調,水庫所能承受的極限風險率計算方法。然後,基於極限風險率計算方法,以白石水庫為背景,研究「考慮壩體自身安全、考慮壩體安全與下游防護對象控制下泄流量的汛限水位動態控制的極限風險率」 。
  7. The company is providing the high - quality product oem processes ministrant at the same time, can also provide the product market fixed position consults, and according to customer of the homologous material, semi - processed goods in offering product, reasonable equipment in etc. in a material and cost control serves, the marketing plans related with super and worth kit in service, at that time a core for freely for customer providing latest color spreading fashion information, latest a material appearing on market information, technical and latest section in the color cosmetic result, brand value refines, cultural excavation in brand, the brand that try hard for customer gives the deep culture content

    公司在提供優質產品oem加工服務的同時,還可根據客戶產品的市場定位提供相對應的原料半成品包材等合理配搭及成本控制服務產品市場定位分析咨詢服務營銷策劃服務等相關的超值配套服務odm ;免費為客戶提供最新色彩流行時尚趨勢分析;最新款包材的上市信息;彩妝技術的最新科研成果;品牌的核心價值提煉;品牌文化的挖掘,為客戶的品牌賦予深厚的文化內涵!
  8. There are 3 sections in this charter. section 1, the concept and feature of the privilege of preferment contract the author firstly points out the 3 meanings of the privilege, then definite the concept of the privilege. the privilege of government control is a compulsory administrative power which is engaged by the government organ to urge the private party to fulfill its duty and to realize the public benefit to the largest degree

    第一節行政合同特權的概念與特徵中首先指出行政合同特權的中「特」的三層涵義,繼而對行政合同特權概念作了界定:行政合同特權是行政主體在行政合同中為了督促相對人履行合同義務,最大程度滿足公共利益而單方享有的優于相對人,並具有一定強制性的行政權力。
  9. The forth and the fifth section present a practically real - time maneuvering control strategy with a mcu ( 68hc908mr8 ) for the robotic fish that uses the two - link oscillating foil as a propulsor. one robotic fish ( oucefish - i ) is designed and accomplished

    第四和第五部分利用mcu ( 68hc908mr8 )實現了對以上模型運動軌跡的實時操作控制,設計完成機器魚模型( oucefish - ) ,使機器魚能利用兩關節擺動薄片作為推進器游動。
  10. On the base of the familiarity with the working capacity of every unit the section is one of the main content of the task including the debugging motor servo amplifier servo controller and the whole hardware system ( 5 ) programming on the base of the above work, programming to control the system with mint

    控制系統硬體部分的調試。在熟悉各元件工作性能的基礎上,通過大量的實驗,找到正確的連接方法,使硬體系統正常工作。這一部分是本課題的主要內容之一,主要包括對電機、伺服放大器和伺服控制器的調試,以及對整個硬體系統的訝試。
  11. According to the characteristic of cnc plasma cutting machine it could improve the process quality of cutting piece in effect for choosing proper technics, for example, cutting section point, aspect, sequence, speed etal during the period of processing, and elaborating towards the distortion control of single side piece, slightness piece, profiled piece and particularity piece at the same time

    根據數控等離子切割機的特點,在加工過程中正確選擇切割的起點、切割方向、切割順序、切割速度等工藝,可以有效提高切割件的加工質量,同時對單邊工件、細長件、異型件以及特殊件的變形控制進行了詳細地闡述。
  12. It was specially pointed out that, when the tail water is constant maximum tide, the computed flood surface is higher than that of nonsteady current, so there is some safety superelevation. underestimation of the roughness will make downward bias to compute along - river surface and bring hidden trouble for flood control. to improve the section can decrease the water level or offset the water rise for increase of floodplains " roughness, but it need much engineering works

    特別提出,按照恆定流計算出來的設計水位比非恆定水位具有一定的安全儲備;而對于灘地糙率的低估又會造成設計水位的偏低,給防洪工作帶來隱患;如果利用改進斷面形式來降低水位或彌補糙率增加帶來的水位抬高,需要較大的工程量,所以平時應注意灘面的減糙管理工作。
  13. Button in the anonymous access and authentication control section

    在「匿名訪問和身份驗證控制」節中單擊「編輯」按鈕。
  14. The eutrophication of taihu lake is a representative ecological problem, so it can be controlled by some ecological control. countermeasures, such as resuming aquicolous vegetation, restricting the area of breed aquatics in the taihu lake, biologically manipulating alga, building ecological agriculture section around the taihu lake and resuming the zoology of taihu bank

    太湖富營養化是典型的生態問題,因此可通過恢復湖泊水生植被,限制湖泊網圍養殖面積,實施生物操縱控藻,建設環湖生態農業區,恢復湖濱帶生態等生態防治對策加以控制。
  15. The representative failure models of arch rib are searched and the rib section resistances are calculated by incremental method and disadvantage loading in the control sections. the structure reliability assessment index on bearing capacity of the arch - bridge is calculated by the function of bearing capacity reliability, structure resistance probability model, load action effect probability model and jc method

    對每種荷載布置型式,採用荷載增量法進行拱橋結構失效模式的尋找和截面抗力的計算,給出其承載力可靠度功能函數,推導功能函數中結構抗力和作用效應概率模型,並利用改進的一次二階矩法計算在用拱橋承載力可靠度指標評估值。
  16. Secondly, paper introduces the composition structure and the manufacture craft characteristic of airplanes, describes the structure and the main assembly process and the assembly characteristic of the n # fuel tank section, points out the assembly accuracy control of the n # fuel tank section. thirdly, paper analyses in detail problems which exist in the current riveted assembly of the n # fuel tank section, proposes the improve measures against the existent problems. finally, paper forecasts in theory the positive effect that the new plan will bring, introduces the practical result after approval test, analyses the differences of both

    具體做了以下幾方面工作:第一,詳細闡述了工作研究的基本原理;第二,介紹了飛機的組成結構、飛機製造工藝的特點、 n #油箱段的主要結構、 n #油箱段的主要裝配過程、 n #油箱段的裝配作業特點和n #油箱段的裝配準確度的控制方法;第三,具體分析了n #油箱段鉚接裝配生產線現行作業中存在的問題,針對存在的問題,提出了具體的改進建議,並形成了新的改進方案;第四,從理論上預測了新方案將會帶來的積極效果,介紹了新方案在現場試驗驗證的實際結果,並對兩者之間存在的差異進行了對比分析與研究。
  17. Based on the construction of the testing section for the lining of jiping main canal in shandong province of south - to - north water transfer project, the main causes of the cracking from the mechanized lining concrete slabs are analyzed from the aspects of foundation treatment, bedding layer placement, quality of the raw materials for the concrete, placement of the concrete, cutting of the hardened concrete and the curing of the concrete, and then the relevant prevention and control measures are pertinently put forward

    摘要結合山東省南水北調濟平乾渠工程襯砌試驗段施工情況,著重從地基處理、墊層料鋪設、混凝土原材料質量、混凝土澆築、成型混凝土割縫及養護幾個方面分析了機械化襯砌混凝土板裂縫產生的主要原因,並針對性地提出了預防及控制措施。
  18. And combining with compound analysis, this thesis has calculated and estimated the deformation and stability of slopes of the cliff debris and residual soil slope project on the project site at k15 + 183 of yong ' an section of yong - zhang highway ; ( 3 ) in the course of the cut slope excavation inner displacement has been in control of real time field monitoring

    同時邊坡開挖後期坡頂會出現回彈現象。 3 、數值計算成果表明,隨著開挖階數的增加,大小主應力在邊坡內也進行不斷的調整。邊坡開挖后坡腳處大小主應力值nlfep程序結果與ansys計算結果較為相似,兩者吻合性較好。
  19. This section describes the two most common access control and audit scenarios : setting rules at resource creation and programmatically modifying the rules of an existing resource

    本節描述兩種最常見的訪問控制和審核方案:在創建資源時設置規則和以編程方式修改現有資源的規則。
  20. Under the given condition, we have proved the existence and uniqueness of the minimum norm scattering - fission cross section control element, and have given its corresponding optimality conditions

    在一定條件下證明了最小范數散射裂變截面控制變量的存在性和唯一性,並給出其相應的優化條件。
分享友人