section of the rail 中文意思是什麼

section of the rail 解釋
鋼軌剖面
  • section : n 1 (外科、解剖的)切斷;切割;切開。2 【外科】切片,【金相】磨石。3 (果子的)瓣。4 【數學】截...
  • of : OF =Old French 古法語。
  • the : 〈代表用法〉…那樣的東西,…那種東西。1 〈用單數普通名詞代表它的一類時(所謂代表的單數)〉 (a) 〈...
  • rail : n 1 (圍欄等的)橫木,橫檔;(釘帽架等用的)橫條,欄桿,扶手;〈pl 〉圍欄。2 軌道;鋼軌;鐵路;〈...
  1. The section of rail from tai wai to hung hom will still be constructed as planned. we have yet to receive considered views from kcrc on this

    由大圍至紅?的一段將仍按計劃興建。政府仍待九鐵公司就以上方案提出意見。
  2. In order to guarantee high - speed train running safe and stably, the safety reserve must be enough for the stability of high - speed railway over - section continuously welded rail ( cwr ) track

    為了保證高速列車安全、平穩地運行,高速鐵路跨區間無縫線路的穩定性必須有足夠的安全儲備。
  3. Essential strategic transport infrastructure, including central - wan chai bypass, island eastern corridor link, road p2, north hong kong island line, and connection for the fourth rail harbour crossing section of the shatin to central link

    建造必需的策略性運輸基礎設施,包括中環灣仔繞道、東區走廊連接路、 p2路、北港島線,以及沙田至中環鐵路線過海線段(第四條過海鐵路)的接駁道路
  4. It is proposed that the lrt system will adopt a standard rail gauge, power supply by overhead wires, main low - floor vehicles in six axes, one or two cars in one train set during the initial stage of revenue service, two or three cars in one train set in the later stage, 90m platform length, certificate payment system, type - b right - of - way on at - grade section, and signalling control for priority passing at intersections, etc

    建議採用之輕軌系統為標準軌距,架空線供電之大部分低底板輕軌車輛,每列車以二輛編組營運,月臺設計長度為60公尺,以付費證明系統收費,平面段采b型路權,交叉路口以交通號志管制,給予優先通行權。二線合計之建設成本,以89年幣值估算,約需新臺幣131億元。
  5. This paper summarizes main research means for plane and vertical section ' s design criteria of high - speed wheel / rail railway line, and carries through simple appraisal for all kinds of research means in the end

    對高速輪軌鐵路線路平縱斷面設計標準的主要研究方法加以總結分析,對相關研究方法進行了簡單的總結。
  6. Based on the integrated debugging drill management experiences of guangzhou metro for the modified project of line 2, the first operating section of line 3 and the university - town section of line 4, the paper analyzes and discusses the management mode of the multi - line integrated debugging drill in urban rail transit, and demonstrates that the application of project integrated management is effective in large - scale integrated debugging drill of urban rail transit

    摘要系統地總結廣州地鐵2號線調整工程、 3號線首通段、 4號線大學城專線同時開通前的綜調演練管理經驗,通過對城市軌道交通系統的多線綜調演練管理模式的分析和探討,證明項目集成管理在城市軌道交通大規模綜調演練中的應用是可行有效的。
  7. It will share tracks with the kowloon southern link now under construction, the section of the existing west rail between nam cheong station and kam sheung road station, and then the northern link before branching out from san tin for connection with the mainland section of the erl at the boundary

    香港段將與興建中的九南線現行西鐵介乎南昌站及錦上路站一段和北環線共用路軌,然後再由新田分支至邊界與內地段連接。
  8. To tie in with the grade separation works of light rail, a section of light rail tracks at pui to road has been temporarily closed until the works are completed at the end of 2003

    配合架空輕鐵路軌工程,屯門杯渡路一段輕鐵路軌已經暫封,直至二零零三年底工程竣工為止。
  9. 2. acroding to real construction conditions of 150km track of section b26 - 1 on qin - shen passenger railway, the construction arrangement, scheme and task flow are summariaed for the construction of overinternal jointless rail on newly - built railway

    依據秦沈客運專線b26 - 1標段150km的正線軌道鋪設實際施工情況,對一次性鋪設跨區間無縫線路總體施工安排、施工方案和作業流程進行了總結。
  10. The construction contracts for the southern section ( tai wai to shek mun ) and the northern section ( shek mun to wu kai sha ) of ma on shan rail were awarded to necso - china state joint venture at a price of about hk $ 3, 300 million

    馬鞍山鐵路南段(大圍至石門)和北段(石門至烏溪沙)的土木工程合約同時由力豪-中建聯營投得,兩份合約總值港幣三十三億元。
  11. In view of the research situation of the technologic and economic evaluation on the constructed program of the pacific road " section in the no : 1 route of wuhan city ' s light rail transit at present, especially the researchment on the trend of the route, the paper discussed detail research of the constructing plans by using various theories of fundamental construction econnmics, etc, based on the the general urban constructing plan of wuhan, etc. the qualitative analysis method and the quantitative analysis method are connected to be applied into this paper for the research work

    本文根據《武漢市城市總體規劃》 ( 1996 - 2020 ) , 《城市快速軌道交通工程項目建設標準》 , 《武漢市綜合交通規劃》 ( 1996 - 2020 )以及運籌學、技術經濟學、投資管理學、基本建設經濟學等原理和相關理論,對武漢輕軌交通一號線太平洋路段這部分關鍵建設線路方案的比選進行了論述及細化研究。本文採用定性分析與定量分析相結合的方法,對軌道線網初始方案進行測試與調整;對多個線路走向的初始方案進行篩選,確定兩個備選方案,再對軌道交通線網優選方案進行綜合比選評價,最終得出軌道交通線網的推薦方案,增強了建設方案的科學性和合理性。
  12. A 60 - metre girder being positioned for the construction of west rail viaducts became unstable and moved backward above a work site at kam tin round - about, resulting in the temporary closure of a section of kam tin road

    當日,西鐵在近錦田迴旋處的工地進行高架橋工程時,用以興建高架橋的六十米長鋼陣突然松脫並向後墜,以致錦田公路需要臨時封閉。
  13. The government has earlier requested the two corporations to cover in their merger discussions how the hong kong section of the express rail link can be accommodated on the overall railway network in hong kong and to assess the impact on the business opportunities of the possible merged company

    政府較早前要求兩鐵在商討擬議合併時,須包括區域快線本港段如何配合香港整體鐵路網路及對擬議合併公司將來業務的影響。就此,兩鐵要求延長遞交擬議合併研究報告期限。
  14. Due to the road width shortfall on section 4 of wufu road and west river road, this section is planned as a single track 3. 14 kilometers long. this lrt line is planned to be mainly of the at - grade type, except for the area at the intersection of section 3 of chushan road and section 4 of kishon road, as well as on the north side of genko bridge over the love river, where underground sections are planned. there will be 23 stations on the double - rail sections and 9 stations on the single rail sections

    並提出其輕軌系統優先發展路網,建議路線全長約9 . 6公里,設置9個車站,總成本以88年幣值估算,約需新臺幣86億,包括2 . 2公里高架,佔全長之23 , 2個高架站; 0 . 7公里地下,佔全長之7 , 1個地下車站;其餘6 . 7公里為平面型式,佔全長之70 , 6個地面車站。
  15. The light rail grade separation works at tsing lun road involve the elevation of a 300 - metre long10. 5 - metre wide section of track across the light railroad junction at tsing lun road. a footbridge with lifts will also be built to the west of the elevated viaduct

    屯門青麟路架空輕鐵路軌工程涉及的架空路軌長三百米、闊十米半,橫跨現時的青麟路輕鐵路面交匯處,以及在輕鐵高架橋西面興建一條附有升降機的行人天橋。
  16. Temporary bus routes 505 and 506 commence service on 14 july to tie in with the grade separation works at pui to road a section of light rail tracks at kin on will be temporarily closed starting from 14 july as works begin at pui to road. light rail will introduce two temporary bus routes - bus routes 505 and 506 - for passengers affected by the closure

    配合九廣鐵路公司架空輕鐵路軌工程進行,屯門杯渡路一段輕鐵路軌將由七月十四日開始暫時封閉,輕鐵將增設兩條臨時巴士線- 505及506線,為受影響的乘客提供服務。
  17. Construction of the southern section of tai lam tunnel portion of west rail phase i, where tai lam tunnel is to connect tsuen wan west station in the south to kam tin station in the north

    建造西鐵第一期大欖隧道部分的南段,而大欖隧道會把南面的荃灣西站與北面的錦田站連接。
  18. On the hong kong side, we are studying the feasibility of using the west rail and the northern link to form the hong kong section of the erl

    在香港方面,我們正考慮利用西鐵及北環線作為廣深港高速鐵路香港段的可行性。
分享友人