selected walls 中文意思是什麼

selected walls 解釋
選定背景墻
  1. To ascertain how to produce differential pressure reasonably during the course of high temperature and pressure gas well testing, we must consider synthetically the following situations : both liquid in well bore and solid phase particles of mud in strata can be carried out through airflow ; we must avoid sand production out of borehole walls and make the selected differential pressure meet the demands of the testing instrument capability ; the calculation of differential pressure when no sand comes out of strata covers the calculation of strength of rock of borehole walls and airflow velocity, etc

    摘要高溫高壓氣井測試中合理生產壓差的確定需要綜合考慮使氣流能夠在井筒中攜液、返排侵入地層中的泥漿固相顆粒、避免井壁出砂、滿足測試工具性能要求等;地層不出砂壓差計算還涉及到井壁巖石的強度計算、氣流流速計算等。
  2. Total 18 simulated acceleration time histories for intensity 6, 7, 8 and 9 are adopted as inputs, 6 typical retaining walls heights and 2 bridge abutments with difference are selected as the structural models of soil - structure system, the seismic responses of the system and the horizontal variation of the maximum response accelerations at different height levels are analyzed by means of a wave propagation finite element program

    選用針對地震烈度6 、 7 、 8 、 9合成的總共18條地震動時程,選取具有代表性的6個不同高度的擋土墻以及2個不同高度的橋臺模型,利用波動有限元法既有程序分析地震反應,研究水平地震加速度沿高度的分佈規律。
分享友人