set completed 中文意思是什麼

set completed 解釋
布景完成
  • set : SET =safe electronic transaction 安全電子交易〈指用信用卡通過因特網支付款項的商業交易〉。n 【埃...
  1. A physical model of electrically induced optical activity of electrorheological fluids is derived. a set of electrorheological fluids and microemulsion with different concentration are prepared and their electrically induced optical activity are measured by means of an automatic polarimeter. on this foundation, the following results have been completed

    建立了電場誘導電流變液旋光的唯象物理模型,並應用wzz - 2a型自動旋光儀對不同材料的電流變液和微乳液的旋光效應進行了測量。
  2. Acceptance of the system ( " acceptance " ) for purposes of annex c shall be deemed to have occurred when all tests set forth in the acceptance test procedure for the system at buyer ' s facility have been successfully completed

    為附件三之目的,在系統的驗收測試程序中規定的一切測試已在買方設施地點成功完成時,系統的驗收(簡稱「驗收」 )應被視為已經進行。
  3. Completed set of not less than two clean ocean bills of lading to order and blank endorsed

    不少於兩份的全套清潔,憑指示,空白背書的海運提單。
  4. In this paper, observation was conducted on pollen germination and growth behavior in distant hybridization between cerasus fruticosa and c. avium and hybridization between varieties in c. fruticosa through fluorescent light system of microscope. the results showed that pollens could normally germinate and pollen tubes could reach ovary through style to completed fertilization in intraspecific hybridization in c. fruticosa. the average fruit - set rate was 27 %

    通過對草原櫻桃與歐洲甜櫻桃種間遠緣雜交及草原櫻桃品種間雜交后花粉管行為的熒光觀察發現,草原櫻桃品種間雜交授粉后花粉在柱頭上能正常萌發生長,花粉管沿花柱到達胚珠完成受精過程,平均座果率為27 。
  5. In particular, the hand - over costs should also cover costs required for compliance with the requirements set out in the ifp including section 8. 4 in connection with or for handover of the completed facilities

    這里更須指出,移交費用應包括為履行發展建議邀請書(包括第8 . 4節)內就有關或為移交竣工設施而訂明的規定所需的費用。
  6. Following is the primary work and contributions of this thesis. first, the concepts about data lineage tracing are completed and refined, and the formal definition of derivation set and supplementary set are provided. these definitions form the basis for derivation set tracing

    本文的主要工作與創新有以下幾個方面:作者首先對與數據志相關的概念進行了完善和細化,給出了起源集的形式化定義,並提出了補集無關和補集相關的概念。
  7. The study has completed the design of two - phase inverter and made up of the two - phase inverter - motor system for experimental use it is a variable frequency adjustable speed system with a open - loop control of rotational speed, which consists of voltage - controlled oscillator circulating assign device inverter circuit and two - phase induction motor a accurate mathematical model is set based on the whole system, and simulator program of dynamic and steady condition is established, which is used to calculate the dynamic and steady performance by kron and symmetrical coordinate converter by simulator calculation and experimental research with specific parameter of the system, a comparison is made between predicted and experimental characteristics, experimental measurements are shown to compare closely with corresponding theoretical result it is compared with some variable frequency adjus table speed system comprising inverter and single - phase induction motor from the system efficiency torque pulsation and the effect of two - phase inverter capacitance based on the conclusion, harmonic cancellation pulse width modulation control of a two - phase inverter - fed induction - motor drive system is researched, which cancelled the low harmonic and improve the system performance

    通過對電機的kron變換和對稱分量變換,建立了系統較精確的數學模型,編制了系統動態及穩態運行的模擬計算程序分別計算系統的動態和穩態性能。通過對系統的具體參數進行了模擬運算和實驗研究,實驗和模擬結果進行比較,說明實驗和理論較為一致,並從系統效率、轉矩脈動及兩相逆變器電容的影響等方面與各種逆變器和單相異步電動機組成的變頻調速系統加以比較。在此基礎上,對兩相逆變器供電-異步電動機系統使用諧波抑制pwm控制進行了研究,由於減少了低次諧波,改善了系統性能。
  8. A quantitative appraisal of the prospect of uranium mineralization is completed based on a set of hydrochemical data acquired from the known in - situ leachable sandstone - type uranium, including radon content, acid - alkali ratio, oxidized and reduced electronic potential, hydrocarbonate radical and uranium content in water

    但是在找鈾過程中僅用水化學成份、氡含量、酸堿度和氧化還原電位等數值進行描述,說明它們與鈾礦化的關系,這種單一因素的描述不能綜合反映與鈾礦化的聯系程度,以定量評價鈾礦化與上述因素的關系,從而影響了水化學找礦的效果。
  9. Completed set technology of bolt support for seam gateway applied to lu ' an mining area

    煤巷錨桿支護成套技術在潞安礦區的應用
  10. Completed in 1648, the fort contains prime examples of moghul architecture, set amongst spacious and relaxing gardens. if you want to do some

    遊人亦可以登臨公園內依海而建的望海樓,盡覽一望無際的海景。
  11. Research, design and application of completed set rapid quantitative loadout technology

    快速定量裝車成套技術的研究設計及其應用
  12. Application for a special permit license prior to posting is required. a set of completed

    投寄前需向香港郵政財務科預先申請一個特許投遞牌照,而投寄時則需出示一式3份填妥的
  13. For those who wants to submit the above specified forms through electronic means, please return the completed word form as an attachment to an email to home affairs department and to incorporate with a digital signature supported by a recognised certificate and generated within the validity of that certificate as set out in the electronic transactions ordinance

    將填妥的word格式的指明表格以檔案附加致民政事務總署的電郵,及根據電子交易條例連同數碼簽署一同送交,但須有認可證書證明該數碼簽署及該數碼簽署是在該證書的有效期內產生的。
  14. As soon as data reception was interrupted, we searched the internet for wafs charts and were able to locate many but not all the required charts. we called the bureau of meteorology ( bom ), australia for help. altogether, we received via fax 5 wafs charts from their help desk, which completed the full set of charts required for our operation

    當資料接收中斷時,雖然我們未能在網際網路搜尋到所有wafs預報圖,但透過澳洲氣象局的協助,從他們的支援中心經傳真收到五張wafs預報圖,以補足運作所需的整套預報圖。
  15. As soon as data reception was interrupted, we searched the internet for wafs charts and were able to locate many but not all the required charts. we called the bureau of meteorology, australia for help. altogether, we received via fax 5 wafs charts from their help desk, which completed the full set of charts required for our operation

    當資料接收中斷時,雖然我們未能在網際網路搜尋到所有wafs預報圖,但透過澳洲氣象局的協助,從他們的支援中心經傳真收到五張wafs預報圖,以補足運作所需的整套預報圖。
  16. Palo alto villas, kunshan the first phase of the palo alto villas project will be developed with 75 percent of the land set aside for residential homes and the remaining 25 percent set aside for public open space and a few commercial buildings. the major roads of the first phase of the project have already been completed

    本公司即將在崑山石牌鎮進行房地產開發項目,規劃為自石牌鎮過橋向東沿中華路南面30米內一狹長地段,總長820米,以及向東至興華路,北起中華路,南至蘇杭路共747畝的地塊。
  17. 12 client satisfaction survey completed in 2003. a client satisfaction index was set up at end of 2003

    完成12項客戶滿意調查,並綜合所得資料,於2003年底設立客戶滿意度指數
  18. Article 12. the foreign invested companies who set up r & d center, the tariff and import link tax will be exempted if the self - used equipment, and the technology, components and spare parts which are completed with the said equipment within the total investing value can not made in china or their performances can not meet the requirements procured in china

    十二、外商投資企業設立的研究開發中心,在投資總額內進口國內不能生產或性能不能滿足需要的自用設備及其配套的技術、配件、備件,可按規定免徵關稅和進口環節稅。
  19. Kunshan fu printing electronic co, . ltd was set up in 2004, and we produce the nameplates, control panel and membrane switch, all the process are completed in our factory to meet the requirements for the quality and delivery

    崑山富展電子科技有限公司成立於2004年,主營高端銘板,控制面板,薄膜開關等,一貫製程在廠內完成,確保品質及交期滿意客戶。
  20. Feida company has set up completed marketing service systems in more than 40 cities, and the branch or all over the country, including beijing, shanghai, guangzhou, wuhan, chendu, changsha, shenyang, wulumuqi, nanjing, jinan, chongqing, haerbin, kunming, guiyang, xian, zhengzhoufairtall productions are bringing health life for chinese people

    廣州飛達運動按摩器材有限公司緊握國際上該行業的最新趨勢,不斷開發生產最新時尚潮流產品,已令自創品牌- " fitall飛駝"成為中國著名運動按摩器材的品牌。並成功在全國各大城市建立了完整的營銷服務體系,為全國人民打造健身時尚塑造健康生活。
分享友人