settlement measurement 中文意思是什麼

settlement measurement 解釋
沉降測量
  • settlement : n 1 解決。2 決定。3 鎮定;安定。4 固定;定著。5 澄清;沉澱;沉澱物;沉積物;【地質學;地理學】沉...
  • measurement : n. 1. 測量,計量,量度。2. 份量,尺寸,大小,寬度,厚度,深度(等)。3. 測量法。 measurement goods (按體積、容積計算的)體積貨物。
  1. The monitoring result proved that although the surface settlement velocity was rather great during the initial phase of enrockment, the foundation still maintained firm based on the integrated analysis of lateral displacement, lamination settlement and pore water pressure measurement

    監測結果表明:盡管拋石初期地表沉降速率很大,但綜合測斜、分層沉降、孔隙水壓力觀測結果分析,地基依然保持穩定。
  2. Deep settlement measurement

    原位測試深層沉降觀測
  3. According to the analysis of the precision and the comparision of the data of settlement measurement, the precision of this method meets the requirement of the observation of deformation

    通過精度分析,並與沉降觀測數據對比,其觀測精度滿足深基坑變形觀測的精度要求。
  4. By controlling the stress value of under - lying layer less than tits structure yield stress value, a new design method to decrease composite ground settlement is suggested. and the composite foundation settlements of 12 buildings with the deep mixing cement piles is calculated, which is in good accord well with the measurement in field. second, considering the influence of well resistance, smear effect and structure breakage of thick soft clay, the equivalent calculation method is proposed

    首先,結合溫州地區深厚軟土,通過對室內常規試驗結果的分析,發現軟土具有較強的結構性,並給出室內固結壓縮曲線校正的新方法;提出了通過控制未打穿水泥攪拌樁復合地基下臥層的應力水平,使其小於土體結構屈服應力,以大幅度減小沉降的復合地基設計方法,並通過與12幢住宅樓未打穿水泥攪拌樁復合地基的實測沉降對比,得到了良好的驗證,進一步完善了結構性軟土壓縮變形的計算方法。
  5. Article 18 the measurement of deferred income tax assets and deferred income tax liabilities shall reflect the effect of the expected asset recovery or liability settlement method on the balance sheet day on the income taxes, i. e. the tax rate and tax base, which is adopted at the time of measurement of the deferred income tax assets and deferred income tax liabilities and shall be identical with those of expected asset recovery or liability settlement method

    第十八條遞延所得稅資產和遞延所得稅負債的計量,應當反映資產負債表日企業預期收回資產或清償負債方式的所得稅影響,即在計量遞延所得稅資產和遞延所得稅負債時,應當採用與收回資產或清償債務的預期方式相一致的稅率和計稅基礎。
  6. This thesis gets forecasting ground settlement of sk3 + 355 section of shenzhen metro da ~ ke running tunnel after it is completed 6 months, also gets forecasting ground settlement of sk3 + 395 section after it is completed 15 months. finally, the model test data are compared with the site measurement data

    本論文通過多個模型試驗的研究,得到了深圳地鐵大~科區間里程sk3 + 355斷面在隧道竣工后6個月內地表固結沉降的預測值,也得到了sk3 + 395斷面三孔三線隧道施工引起的沉降和隧道竣工后15個月內地表固結沉降的預測值。
  7. Based on my investigation and actual settlement measurement of pile foundation done by the testing center of jiangsu province on site, i made a conclusion : the strength and deformation of the original design could satisfy the standard requirement with composite pile foundation theory, and strengthening was not required

    在現場調查和省檢測中心的沉降實測基礎上,經過對樁基設計的分析,採用了復合樁基理論,得出結論:原設計強度和變形能滿足規范要求,毋需進行加固處理。
分享友人