slab beam 中文意思是什麼

slab beam 解釋
薄板梁
  • slab : n 1 平板,厚板;(圓木解成板時外面兩塊帶皮的)背板。2 (麵包等的)片,厚塊;鐵塊;土塊。3 混凝土...
  • beam : n 1 梁,棟梁,桁條;(船的)橫梁。2 船幅;(動物、人的)體幅。3 (秤)桿,杠桿,(織機的)卷軸,...
  1. Comparing with the same category overseas jointless bridges, the new type bridge has more reasonable structure, more simple and convenient construction, and better use effect etc. the main work in this paper is described as follows : ( 1 ) this paper introduces phylogeny and reseach survey of the joints bridge inland and abroad, and a new jointless bridge structure ? new type semi - integral abutment bridge is based on these, which characteristic of own structure and setting of primary component are expatiated. ( 2 ) this paper analyses influence of temperature effect, creep, shrinkage and circumambient soil of run - on slab on the new type structure, and analyses the forcing performance of beam, abutment and run - on slab of the new type semi - integral abutment bridge, and constrast to the same category joints bridges

    本文主要做了以下工作: ( 1 )介紹了無縫橋梁在國內外的發展歷史、研究概況,並在此基礎上提出了一種新的無縫橋梁結構形式-新型半整體式無縫橋梁,闡述了它特有的結構形式以及主要構件的設置; ( 2 )分析了溫度效應、徐變和收縮以及搭板周圍土體對這種新型結構的影響,對新型半整體式無縫橋主梁、橋臺以及搭板進行了受力性能分析,並和同類無縫橋梁進行了對比分析。
  2. Considering the special structure of multi - ribbed slab, founding diphase body mechanical model of compound material, strengthening rib beam and rib pillar by equivalent volume ratio of concrete and slice brick, the paper drew elastic compution constant and shear constant. based on the things, the paper simplified isotropy compution model to wall, gave practical design formula of elastic mold and shear mold, provided necessary parameter for practical design formula of elastic rigidity. finally the calculating results agree well with the text results

    結合密肋復合墻板的特殊構造,建立墻板的復合材料二相體力學模型,按照混凝土與砌塊體積比不變原則對肋梁肋柱同時加強,得出墻板的彈性計算常數及剪切常數,在此基礎上,進一步將墻板簡化為各向同性的計算模型,給出墻板彈性模量及剪切模量實用計算公式,為密肋復合墻板的實用彈性剛度計算公式提供必要的參數。
  3. The system is composed with concrete filled cold - formed square steel tube column, the beam with two cold formed c type steel welded together back to back, the slab with profiled - steel and concrete, the beam and the slab joined into composite steel - concrete beam. they all together make up of the bearing members. and the house also includes the light economical - energy sources heatproof walls

    該體系是以冷彎薄壁方鋼管混凝土為柱、冷彎薄壁c型鋼背靠背高頻焊接組成工字型梁、壓型鋼板上現澆築混凝土組成組合樓板並與梁一起構成組合梁作為承重構件,以輕質節能保溫型墻體作為圍護結構組成。
  4. This thesis investigated and researched on non - loaded crack, especially those caused by thermal - shrink, and analyzed the thermal - shrink stress of beam, slab and continuous - wall, found that according data of civil and overseas offered thermal - shrink calculating formula without considering effect of factors, such as the cement quantity, using of aruhuesiru, aggregate size and quantity of sand, which made the result data smaller. in addition, there are not enough construct measure in code

    本文對非荷載裂縫,特別是溫度?收縮裂縫進行了調查研究,並對兩端或四周約束的梁、板和底部約束的地下連續墻進行了收縮應力分析,發現國內外有關文獻給出的收縮計算公式沒有考慮泵送商品混凝土的水泥用量、外加劑使用、骨料粒徑和砂用量等因素的影響,計算出的混凝土收縮量往往偏小;另外, 《規范》中針對溫度?收縮裂縫的構造措施不足。
  5. Static loading tests of a 20m hollow slab beam

    空心板梁靜載試驗研究
  6. Construction technique for cast - in - situ continuous hollow - slab beam

    現澆連續空心板梁施工技術
  7. Experiment research on the bearing capacity of prestressed slab beam with defects

    有缺陷預應力板梁的承載能力試驗研究
  8. Control of early crack on beam - and - slab construction with ready mixed concrete

    商品混凝土梁板結構施工早期裂紋控制初探
  9. Beam and slab structure

    梁板結構
  10. Experimental study on properties of 16m pretensioned and prestressed concrete beam - slab structure

    先張法預應力砼梁板結構性能試驗研究
  11. These experiments mainly aim at determining the deflection and stress of beam slab structure before and after reinforcement

    靜載試驗的內容是測定加固前後梁板結構的混凝土應力和撓度。
  12. In this paper , static load experiments are illustrated and the reliability of cfrp reinforcement technology , used for reinforcing beam slab structure of large span bridge , is discussed

    文章結合對大跨度橋梁的梁板結構加固處理前後的靜載試驗,探討了大跨度梁板結構應用粘貼碳纖維加固處理技術的可靠性。
  13. Importance and means of signal measurement and processing in control of three main electric and mechanical equipment for walking beam heating furnace are discussed, the discussion includes time filtering processing of digital signal, measuring signal processing and measurement fault judging of translation stroke in charging machine and discharging machine, translation stroke measurement of walking beam and measuring method of slab output quantity

    摘要論述了步進梁加熱爐的三個主要電氣機械設備控制中信號檢測和處理的重要性及方法,包括四個方面:數字信號的時間濾波處理,裝鋼機、出鋼機的平移行程檢測信號處理和測量故障判斷,步進梁的平移行程檢測,板坯流出量的檢測方法。
  14. Results show that fracture of the slab originates from overfiring of the slab due to high temperature in certain local area of the walking beam furnace and in light of the result proper counter measures are accordingly put forward

    結果表明,板坯斷裂是由於步進爐中局部溫度過高產生的過燒現象,根據分析結果提出了相應的改進措施。
  15. Based on rizhao port bulk grain wharf construction, this paper presents a simple, practical and efficient construction technique of post - tensioned pre - stressing concrete beam and beam - slab

    摘要以日照港散糧碼頭施工為例,介紹一項簡單、實用、高效的后張預應力梁及梁板的施工工藝。
  16. Supervision of construction quality of prestressed hollow slab beam by post - tensioning method

    后張法預應力空心板梁的施工質量監理
  17. Introduction on putting prestressing in prestressed concrete hollow slab beam of qutan bridge

    曲潭大橋預應力砼空心板梁施加預應力簡介
  18. Hollow slab beam

    空心板梁
  19. So, the existed high - piled slab & beam wharf shall he demolished

    為此,需將舊的高樁梁板碼頭拆除。
  20. The structure analysis studies and design - essentials of the continuous hollow slab beam erected as simple - supported beam in advance

    先簡支后連續預應力空心板梁受力分析研究及設計要點
分享友人