slope area method 中文意思是什麼

slope area method 解釋
比降面積法
  • slope : n 1 傾斜,坡度;坡,斜坡,斜面;【印刷】斜體。2 【軍事】掮槍的姿勢。3 【數學】斜率。4 【礦物】斜...
  • area : n. 1. 面積;平地;地面。2. 空地;〈英國〉地下室前的空地。3. 地區,地方;〈比喻〉區域;范圍。
  • method : n 1 方法,方式;順序。2 (思想、言談上的)條理,規律,秩序。3 【生物學】分類法。4 〈M 〉【戲劇】...
  1. The elementary idea of the reference units method can be described as follows : firstly, by the setting of double series of reference units, we can control the highest and lowest land quality class of each village or town ; secondly, the class of the arable land will be get through the contrast between the arable land with the reference unit which has been selected in the same area, the difference in quality is the key factor to classify the land. the results show, 87. 6 % of the lands from i to iii distribute on alluvial and lacustrine plains, where the associated soils are mainly grey fulvo - aquic and calcareous concretions black ones. and 61. 4 % of them from iv to vi distribute on slightly rolling parts with mainly yellow - cinnamon soil developed from the diluvial and slope deposits

    分等結果表明:臥龍區等的耕地中,有87 . 6分佈在沖積、湖積平原區,主要土壤類型是在河流沖積物上發育形成的灰潮土、在湖相沉積物上發育形成的砂姜黑土;等耕地中,有61 . 4分佈在壟崗區,主要土壤類型是洪坡積物上發育形成的黃褐土:而、等耕地集中分佈在丘陵區,主要土壤類型是殘坡積物上發育形成的粗骨性黃褐土,等別結果分佈總體上體現了不同地貌類型、土壤條件下耕地質量的差異。
  2. Liquid flow measurement in open channels. slope - area method

    明渠液體流量的測量.坡度面積法
  3. Through the investigation and theoretical analysis, a design method of deep - cutting loess slope in sanmenxia area is presented in this thesis

    為此,在工程調查和理論分析的基礎上,本文提出了三門峽地區深路塹黃土邊坡的實用設計方法。
  4. At the same time, on the base of the analysis and study of the characteristic of sliding stability failure of loess slope in sanmenxia area, a method, which is suitable for many horizons of soil and slopes of different shape, is adopted to analyze the stability of four deep - cutting loess slope solid projects

    同時,在對三門峽地區黃土邊坡滑動失穩特徵進行分析研究的基礎上,採用了一種適合多種土層、不同坡型的邊坡穩定性分析方法,對三門峽地區四處深路塹黃土邊坡實體工程穩定性進行分析及評價。
  5. By surveying the sample plot, the relations between the stabil ity of the mountai n slope of soil preparation for planting by using explosion and other factors s uch as precipitation, terrain , were studied. by using the method of quantitative t heory i, the interrelation between the damaged degrees of soil preparation progra ms by using explosion in low mountain area with abundant precipitation and terrain factors was systematically analysed, and the mathematical models relate d were developed. the results show that the precipitation in early days and the m aximum precipitation per day are the primary factors causing the soil prepara tion program damaged. the main terrain factors of the mountain slope that affect the program stability are according to their importance, slope, position and dir ection. the suitable mountain slope for soil preparation by using explosion is th e slope of less than 25

    通過典型標準樣地調查資料,探討了造林爆破整地工程的坡地穩定性與降水、地形等因子的相互關系,應用數量化理論,對在有充分降水條件下的低山丘陵區的爆破整地工程損失程度與地形因子之間的關系進行了系統分析,並建立了相應的數學模型,研究指出,充分的前期降水和日最大降雨量是引起爆破整地工程損失的激發因素;影響爆破整地工程穩定性的主要地形因子是地面坡度,其次為坡位、坡向,實施爆破整地工程的地面坡度以不超過25為宜。
  6. In a word, there are some achievements as following : 1 ) ecological restoration of the abrupt rock slope in high - cold area should adopt junior planting method. 2 ) the grass seeds for protecting slope in high - cold area should be anti - frost, anti - meager and extensive farming. there are some grass seeds recommended for ecological restoration, for example, kentucky bluegrass, ryegrass, coronilla, festuca arundinacea, sword - bamboo and euonymus fortunei

    ( 2 )高寒地區生態護坡的草種應選用具有抗寒、抗貧瘠和適宜粗放管理的冷季型草種,推薦使用的川西高寒地區生態護坡植物種屬為:草地早熟禾、黑麥草、小冠花、高羊茅的草種組合,劍竹灌木種,以及小葉扶芳藤藤蔓植物種。
  7. After the reservoir sluices, the national highway 213 in this area will be submerged. so the national highway 213will increase its elevation to about 920 meters. in order to estimate the influence of the slope - sliding and bank - collapsing which caused by the reservoir sluices to the elevated highway, and to estimate possible emigration problem, stability analysis of landslide body no. l, 2, and 3 in i, ii area which located in bank accumulation body of zipingpu reservoir in national highway 213 is made by transfer coefficient method and 2 - d 3 - d fem in this paper

    紫坪鋪水庫正常蓄水位高程877m ,水庫蓄水后將淹沒該段現國道213線,因此國道213線將改線抬高至920m高程附近,為正確評價因水庫蓄水造成的滑坡、塌岸對改線公路的影響,以及可能產生的移民問題,本文用傳遞系數法和二維、三維有限元方法對有可能失穩的213國道紫坪鋪庫區庫岸堆積體、區的1號、 2號、 3號滑坡體進行了穩定性分析。
  8. With the using of microsoft visual basic 6. 0, a multimedia computer - aided design system of small type pumping irrigation district is developed in this paper. provided with the live multimedia messages as well as a good man - machine conversation mechanism, this system can help the user to finish the planning of an pumping irrigated area such as the layout of canal system, the selection of pump models, the establishment of the irrigation program, the calculating of canals " parameters, the estimate of the project magnitude, the selection of the field constructions, the economic analysis of the project, the output of results, etc, a new oo ( object oriented ) programming method is adopted in this system, various softwares are integrated in this systems as well by the " automation " technic provided by vb, in addition, the multimedia technic is applied to this system for the first time, it makes the system easy to ope rate. as for the optimization of the canals " section, a new optimization method is adopted based on the existing theories about the canals " section, and in this way, with the purpose of minimizing the project ' s investment as well as a stalized canal, limited by the longituding slope, the canals " best feasible parameters can be deduced. furthermore, a integral method to reckon the earth work is developed in this paper, by this way, the estimate precision of the earthwork is enhanced notably. this paper includes the particular illumination for the developing procedure of each systems " segment, and in the end, the directions of the system are demonstrated in a sample area which lies in the zhaija village, taizhou city, jiangsu province, the running results showed that the initial purposes are achieved effectively, and it has a preferable practicability

    在渠道縱橫斷面優化方面,本文在利用已經比較成熟的縱橫斷面優化理論的基礎上,提出以工程總費用最小為目標函數,以渠道縱坡i為控制變量,以渠道不沖不淤流速及灌區允許地面比降為約束條件,通過縱橫斷面聯動優化的方法得到渠道的最佳工程可行的斷面參數。另外,針對部分地區的取土困難的狀況,本文採用積分法計算渠道工程土方量,從而大大提高了土方量的估算精度,有助於準確控制工程投資規模及資金投向。本文詳細闡述了該系統所採用的編程方法、系統構成、系統各組成模塊的開發過程以及灌區規劃所採用的優化方法及原理,最後應用本系統對泰州市翟家村機電灌區進行規劃設計,運行結果證明其操作比較簡便,界面友好,運行速度快,規劃成果合理,基本達到了系統預定的要求,具備較強的實用性。
  9. The choice dam type is especial importance, during the designed research of the rock - fill dam, particular under the rock - fill dam with very deeply cover layer, the stress and strain of the middle wall and cutting interpenetration wall of the dam foundation is mostly sensitive, whether the. design of dam is scientific and reasonable, it is very important for cutting interpenetration and stability of the dam, the article offer the reference for the design of cutting interpenetration in the foundation with deep cover with earth the water conservancy in xiaban zone, based on the study and analysis the design of cutting seep in the foundation with deep cover with earth, cutting interpenetration concrete wall and the joining model of cutting interpenetration material in body of dam and the applying effect in the practical worko based on the foundation which absorbed and summarize the achievement of design and research in the inter and outer country, for the project of the clay vertical middle wall and vertical cutting interpenetration, the asphalt concrete vertical middle wall and vertical cutting interpenetration the clay inclined middle wall and the lever carpet layer cutting interpenetration, respectively in terms of the different stage of complete period sluice period and working condition, adopting nonlinear calculate and analysis with the finite element method ; carrying the analysis and study with the 3d finite element method as to the different joining model of the left bank high slope cutting interpenetration body and the foundation concert cutting interpenetration wall ; carrying the analysis and study with the 3d finite element method as to the effect of the wall stress and strain because of the different elasticity modulus of the concert cutting interpenetration wall through the analysis and study with the different project. have comparatively all - around comprehended the various model dam, particular the distribute rule of stress and strain of the cutting interpenetration system, provide for the important evidence of the plastic area size the join model of the foundation cutting interpenetrate wall and dam body cutting interpenetrate system the choice of the dam model and the design of the structure of the dam body, the result of research and advice have very importance value in design and building for the similarity project

    工程設計中,壩型的選取顯得尤為重要,特別對于壩基有深厚覆蓋層的堆石壩,心墻和壩基防滲墻的應力和變形是壩體、壩基最敏感的部位,設計方案是否安全、科學和合理,對大壩防滲和穩定起到至觀重要的作用。本文研究分析了國內外深厚覆蓋層基礎防滲設計、壩基混凝土防滲墻與壩體防滲體銜接形式及工程實際應用效果,為下坂地水利樞紐工程深厚覆蓋層基礎防滲設計的方案選擇提供了參考;在吸收和歸納了國內外堆石壩的設計研究成果的基礎上,對粘土心墻和壩基垂直防滲方案、瀝青混凝土心墻和壩基垂直防滲方案以及粘土斜心墻和壩基水平鋪蓋防滲方案,分別按竣工期和蓄水運行期的不同工作情況進行了有限元非線性計算分析;對左岸高陡邊坡的大壩防滲體與基礎混凝土防滲墻的不同結合型式進行了三維有限元靜力計算分析和研究;對混凝土防滲墻不同彈性模量對墻體應力和變位的影響進行了三維有限元靜力計算分析和研究。通過對不同方案的計算分析和研究,比較全面的了解了各方案壩體,尤其是防滲體的應力和變形分佈規律,為壩型選擇、壩體結構設計、基礎防滲墻與壩體防滲體的結合型式以及塑性區大小的確定提供了重要依據。
  10. Standard test method for open - channel flow measurement of water indirectly by slope - area method

    使用比降面積法迂迴測量明渠水流流量的標準試驗方法
  11. On the basis of a full investigation and study and an integrated analysis of the geological setting and rock - mass mechanical environment of the bank slopes of the hydroelectric project area on the mainstream of the jinsha river and by combining the qualitative analysis with the quantitative evaluation, the authors calculated the instability of the sliding masses according to 1 / 8 and 1 / 11 of the total cubic capacity of the materials falling into the river and the surge wave heights at the falling sites as well as at the xiangjiaba and xiluodu dam sites and in adjacent townships according to the calculation method of the surge wave diagram given by the american society of civil engineers, made the risk evaluation of the bank slope instability with respect to the operation safety at the dam, safety of the cities and townships around the reservoir and safety of the reservoir operation, and put forward precautionary measures for bank slope instability

    摘要筆者通過調查研究和綜合分析金沙江幹流水電工程區岸坡地質背景和巖體力學環境條件,定性分析與定量評價相結合,採用與三峽工程庫區岸坡失穩危險性評價相類比的方法,針對崩滑體失穩按總體積的1 / 8和1 / 11入江方量進行了計算和按美國土木工程學會涌浪圖解計演算法計算了入水點及在向家壩壩址、溪洛渡壩址和鄰近城鎮的涌浪高度,並圍繞大壩施工安全、庫區周邊城鎮安全,水庫運營安全等方面對岸坡失穩的危險性進行了評價預測,提出了岸坡失穩的防治對策。
  12. Abstract : because the shenfu - dongsheng mine area is located in intermediate of arid and semiarid zone, its ecological environment is very fragile. based on the fragileeco - environmental, the coal mining and construction have brought out some new environmental problems. man - made debris flow problems is the most serious of them which caused by coal mining, construction of railway and highway as wellas exploiting stone. through a great deal of experiments of artificial simulation setting water rushing to two types of slope debris flow and debris flow gully in shenfu - dongsheng mine site, the characteristics is favourable to formation of debris flow ; ( 2 ) the waste gangue is easy to initiate and is main solid material of debris flow in this area ; ( 3 ) the whole debris flow process could be observed through the model simulation experiment of debris flow gully. at present, this experiment method is the best way to analyze debris flow genesis and process

    文摘:神府東勝礦區位於黃土高原北部乾旱半乾旱過度地帶,由於煤田的大量開采,誘發了大量的環境問題,尤以人為泥石流最為嚴重.本文以神府-東勝礦區人為泥石流為研究對象,採用人工放水沖刷模擬實驗的方法,分析了坡面型和溝谷型泥石流源地鬆散體起動、產沙、泥石流過程的特性,所得結論為: ( 1 )放水歷時長、強度大,有利於泥石流的形成; ( 2 )棄土石渣易起動,是該區泥石流固體物質的主體; ( 3 )溝道型泥石流放水沖刷模擬實驗,便於觀測泥石流的全過程,坡面型泥石流放水沖刷模擬實驗,利於統計產沙、觀測侵蝕形態
  13. Because the shenfu - dongsheng mine area is located in intermediate of arid and semiarid zone, its ecological environment is very fragile. based on the fragileeco - environmental, the coal mining and construction have brought out some new environmental problems. man - made debris flow problems is the most serious of them which caused by coal mining, construction of railway and highway as wellas exploiting stone. through a great deal of experiments of artificial simulation setting water rushing to two types of slope debris flow and debris flow gully in shenfu - dongsheng mine site, the characteristics is favourable to formation of debris flow ; ( 2 ) the waste gangue is easy to initiate and is main solid material of debris flow in this area ; ( 3 ) the whole debris flow process could be observed through the model simulation experiment of debris flow gully. at present, this experiment method is the best way to analyze debris flow genesis and process

    神府東勝礦區位於黃土高原北部乾旱半乾旱過度地帶,由於煤田的大量開采,誘發了大量的環境問題,尤以人為泥石流最為嚴重.本文以神府-東勝礦區人為泥石流為研究對象,採用人工放水沖刷模擬實驗的方法,分析了坡面型和溝谷型泥石流源地鬆散體起動、產沙、泥石流過程的特性,所得結論為: ( 1 )放水歷時長、強度大,有利於泥石流的形成; ( 2 )棄土石渣易起動,是該區泥石流固體物質的主體; ( 3 )溝道型泥石流放水沖刷模擬實驗,便於觀測泥石流的全過程,坡面型泥石流放水沖刷模擬實驗,利於統計產沙、觀測侵蝕形態
  14. This thesis, according to limestone environmental characteristic and characteristic of construction of highway of mountain area of limestone, sets out in excavating from the road bed of the angle of environmental protection, according to trying not to excavate, how to reduce to excavate, how to reduce and excavate the impact on surrounding environment of the course, how to go on the expressway view and ecological environment and how to carry on environmental quality resume, we employ theories such as engineering of traffic, rock soil engineering, traffic psychology, traffic aesthetics, operations research, etc. we have excavated environmental protection theory and method and carried on research to the mountain area expressway road bed of limestone systematically, propose the road bed to excavate and optimize, slope protect, discard cubic meter of earth and stone deal with, natural river system recuperate recovery, view environmental recovery, environmental quality resume theory system of appraising etc.

    本論文依據石灰巖山區環境特徵和石灰巖山區高速公路建設特徵,從路基開挖中環境保護角度出發,按照盡量不開挖、如何減少開挖、如何減少開挖過程對周圍環境的影響以及如何對高速公路景觀和生態環境進行恢復、如何對建設項目進行環境質量評價等思路,應用交通工程學、巖土工程學、交通心理學、交通美學、運籌學等理論與方法,系統地對石灰巖山區高速公路路基開挖環境保護理論與方法進行了研究,構建了包括路基開挖優化、邊坡防護、土石方處理、自然水系調治恢復、景觀環境恢復、環境質量評價等理論或方法的石灰巖山區高速公路環境保護理論框架,為促進石灰巖山區高速公路的可持續發展提供了基本思路。
  15. On the basis of on - the - spot investigation and information, this article puts forward the stratum separation scheme and field criterion for projects in gansu loess areas ; presents the geological structure model of the natural slope in this area for the first time ; counts and analyses the parameter of the loess ; analyses the stability of loess cut with the method of ultimate balance and finite element ; recommends different transect forms for the cut subgrade in gansu ' s loess areas ; evaluates these forms with grey system theory concerning stability, economy and anti - scour capability ; finally, puts forward the design method and procedures of reasonable heavy cuts transect

    本文通過大量的現場調查和資料收集,提出了甘肅省黃土工程地層劃分方案和野外判定標準;首次提出了甘肅省黃土自然邊坡的不同地質結構模型;統計和分析了甘肅省黃土的土性參數;運用極限平衡法和有限元法對黃土路塹高邊坡穩定性進行了分析;推薦了甘肅省不同黃土地區路塹高邊坡的斷面形式,並結合穩定性、經濟性和抗沖刷性能,應用灰色系統理論對其進行評價;最後,提出了黃土路塹高邊坡合理斷面設計方法和設計步驟。
  16. The national highway of hurong is a backbone artery of the national west - east direction, and the traffic main artery of the development of the west regions, following the rising of our country high grade highway networked, the problem about geology of mountainous area of the highway building is becoming outstanding. so the paper puts forward the integrated control countermeasure to the slope stability, through taking the state specific geological environment of enshi area as the background, regarding the south lidu landslide as the research object, and using the method of finite element analysis

    滬蓉國道是國家級東西方向的主幹動脈,是西部大開發的交通要道,隨著我國高等級公路網路化的興起,山區公路建設面臨的環境地質問題也日益突出。本研究論文就是以恩施州特定的地質環境為背景,以南里渡滑坡為具體研究對象,通過運用有限元分析的方法,對山體斜坡穩定性進行分析並提出綜合防治對策。
  17. Allocate the principle of the basis of the cubic metre of earth and stone, combine the characteristics of limestone geology of mountain area and ecological environment, we set up the mathematical model of the linear programming, which is suitable for limestone mountain area large system cubic metre of earth and stone of expressway, meanwhile we put forward systematic thinking of treatment and method through the remaining cubic metre of earth and stone after allocating, at the same time, we give the protective measure on abandon soil field and fetch earth field about environmental ; making the discussion on medical treatment of natural river system and underground river system of the slope recover

    根據土石方調配原則,結合石灰巖山區地質和生態環境的特點,建立了適合於石灰巖山區高速公路的大系統土石方調配線性規劃數學模型,同時對通過調配后剩餘的土石方提出了系統的處理思路和方法,並對棄土場提出了系統的環境保護措施;對各種排水設施的設置與自然水系的調治恢復相結合做了初步探討。第三,路塹邊坡環境恢復。邊坡景觀是公路景觀的重要組成部分,是高速公路環境保護研究的主要內容。
  18. This paper study the jinjiang landslide, integrative application of geological history genetic analysis, limiting equilibrium method and numerical analysis, by analyzing physical geography condition and geological background of the investigated area, this paper researched basic features and genetic mechanism about the landslide, and evaluated sensitivity factors and the current stability as well as development tendency about the landslide ' s stability ; based on these, recurring to experience formula and correlation theory, this paper forecasted the events about landslide damming of river and surge caused by the slope failure, in addition, and evaluated the harmfulness

    本文以該滑坡為研究對象,綜合運用地質歷史成因法、極限平衡方法及數值分析法等方法,通過對研究區自然地理及地質背景的分析,研究了滑坡的基本特徵及成因機制,評價了影響滑坡穩定性的敏感性因素及其發展演變狀況;在此基礎上,運用經驗公式以及相關理論計算對滑坡失穩可能引起的堵江及涌浪事件進行分析預測,並進一步對其危害性做出評估。
  19. Measurement of liquid flow in open channels - slope area method of estimation

    明渠液體流量的測量.斜面積估計法
  20. Measurement of liquid flow in open channels. slope area method of estimation

    明渠液體流量測量.第5部分:斜坡面積估演算法
分享友人