solid construction 中文意思是什麼

solid construction 解釋
實心結構
  • solid : adj 1 固體的;實心的,實質的,密實的。2 【數學】立體的,立方的,三維的。3 結實的,堅強的,堅固的...
  • construction : n 1 建築,結構,構造,架設,鋪設;建設;設計;工程;建築法,構造法,建築物;【戲劇】搭置,布景,...
  1. The cast iron horsing is of solid one - piece construction to provide maximum rigidity against deformation at mounting and wear resistance to any operating conditions

    鑄鐵座為整體座結構,軸承座剛性極好,防止軸承在裝配時產生變形,在任何情況下軸承座均持久耐用。
  2. And in the rear of one of the most imposing mansions in this rich neighborhood, where the various houses vie with each other for elegance of design and magnificence of construction, extended a large garden, where the wide - spreading chestnut - trees raised their heads high above the walls in a solid rampart, and with the coming of every spring scattered a shower of delicate pink and white blossoms into the large stone vases that stood upon the two square pilasters of a curiously wrought iron gate, that dated from the time of louis xii

    聖奧諾路是有錢人的住宅區,各區各樣的巨廈府邸都以其設計高雅和建築華麗而相互爭輝,靠近這條路的中段,在一座最富麗堂皇的大廈的後面,有一座很大的花園,園子里到處是栗子樹,樹冠昂然俯視著那象城堡似的又高又結實的圍墻。每年春天,粉紅的和雪白的栗花紛紛飄落,於是,在那路易十四時代築成的鐵門兩旁方頂上的大石花盆裡,就堆滿了這些嬌柔的花瓣。
  3. The characteristics of high pressure gyratory sprayed pumping discusses is presented, which is applicable in wide range of scope and ground layers, convenient for construction, long durability, wide source of materials. mechanism for subgrade strengthening : complex foundation of cement solid and earth between piles was formed by pulsant load of flowing pressure and spraying flow, water wallop, cavitation phenomenon, water wedge effect, extrusion force and air flow agitation etc so as to enhance foundation bearing force and reduce settlement and deformation

    高壓旋噴注漿技術具有適用范圍、適用地層較廣,施工方便,耐久性好,材料廣闊等特點;其加固地基機理主要是通過流動壓、噴射流的脈動負荷、水塊的沖擊力、空穴現象、水楔效應、擠壓力、氣流攪動等效應形成水泥固結體與樁間土的復合地基,從而提高地基承載力,減少沉降變形。
  4. It is one of the important means of solid model construction. constructing 3d model from 2d engineering drawings that express 3d object in fact, becomes on important aspect of intelligent understanding

    工程圖紙實際表達的是三維物體,二維工程圖樣構造三維模型也成為工程圖智能理解的主要方面。
  5. Latest solid dielectric technology - solid dielectric viper reclosers utilize g ws time proven epox polymer system to fully encapsulate the vacuum interrupters. this system provides excellent insulation properties while providing fully shielded, void - free construction

    最新乾式絕緣技術-乾式絕緣viper重合器利用g w的經過長期運行經驗證明的環氧樹脂完全封裝了真空斷路器。
  6. The paper analyzed synthetically the environmental impact that is produced in construction time of under - ground no. one of shenyang, studied the generant rule and quantity of pollutants such as noise, vibration, waste water, waste gas and solid offal and etc., proposed countermeasures to alleviate and control environmental impact

    摘要通過對沈陽地鐵一號錢施工期產生的環境影響綜合分析,研究該項目在建設中產生的噪聲、振動、廢水、廢氣及固體廢棄物等污染物產生的規律和發生量,並提出緩解和控制環境影響的措施。
  7. " both primary and mating ring are made of solid - block construction for greater reliability and longer service life compared to the soldered, welded or sprayed hard - face designs used by other manufacturers.

    與其他製造商所採用的低溫焊接、熔焊或噴射硬面設計相比,主密封環和配套密封環均採用固體單元結構,可靠性更高,使用壽命更長。
  8. We research the causes of concrete cracking, develop the high performance anti - cracking additive, optimize the concrete mix and construction techniques, increase the stability of concrete volume by shrinkage compensation, enhance splitting tensile strength, and can meet demand of high workability of fresh concrete. in the study, a thorough investigation of this problem is made from all points of view, with the aid of various modern measurement & testing technology and different theories & methods in surface physical chemistry, structural chemistry, solid - state chemistry, composite materials, fracture mechanics, etc. our research results have shown that the various shrinkage of concrete cause concrete cracking in building engineering, such as autogenous shrinkage, dry shrinkage, temperature shrinkage, plastic shrinkage, carbonized shrinkage, etc

    目前,解決混凝土開裂的方法是綜合的,我們調查研究了混凝土開裂的原因,開發研製了高性能抗裂外加劑,優化混凝土的設計和施工方法,並通過補償收縮達到混凝土體積穩定,提高抗裂強度,滿足混凝土拌和物高工作性能的要求。本研究採用多種測試技術,應用表面物理化學、結構化學、固體化學、復合材料學、斷裂力學等多學科的理論與方法,從不同的角度進行深入的研究和探討。通過調查研究建築工程中出現的混凝土開裂、滲漏問題,發現混凝土在非荷載作用下開裂主要是由混凝土的自收縮、乾燥收縮、溫度收縮、塑性收縮、碳化收縮等各種收縮變形引起的。
  9. In 2002, the company was awarded as no. 8 of the " 20 tops of real estate developers in 2002 " by jinan development removal management office for its outstanding achievements in development investment, construction acreage, completed acreage and sold acreage. it won the laurel of " jinan real estate enterprise of famous brand in 2002 " for the solid strength and great fame of luneng brand. the company advocates the thoughts of people first and focusing on customers and makes a developer of social responsibility

    2002年度,公司因在開發投資額施工面積竣工面積和銷售面積的出色表現被濟南市開發拆遷管理辦公室授予「二二年度房地產開發企業20強」位列第八名「魯能」品牌的雄厚實力和家譽戶曉的知名度,使公司榮獲「二二年度濟南市地產品牌企業」的殊榮公司倡導人本思想一切以顧客為中心,做有社會責任感的開發商,深入人心的誠信經營更為公司贏得「濟南市民最信賴的房地產品牌公司」的美譽, 2002年公司成為濟南市房地產廣告協會理事單位。
  10. Pfrang stotz, g., reichelt, t., “ municipal solid waste combustion ash : characteristics and the use in road construction. ” proceedings of the international symposium organized by the concert technology unit, uk, pp. 235 - 246 ( 2000 )

    林錫鈞、林志棟、姚志廷、蔣子平,應用於道路工程之焚化底灰貯存時間最佳化探討,鋪面工程學術研討會論文集,第129 - 168頁( 2003 ) 。
  11. In this thesis, the construction and monitoring general method of cable replacement work for qianwei minjiang river cable - stayed bridge is introduced firstly, then, using large - scale commercial finite elements analysis software, algor, a space solid model is developed. in order to give attention to internal force and deformation, the thesis simulates the factual situation of the bridge by adding boundary elements. the analyzed items include : cable forces, deflections, stress of box - girder and maximum horizontal deformation of tower under different cable - replacement cases, which can be used to tutor design and construction for other similar works

    本文以犍為岷江大橋換索工程為背景,首先介紹了該橋換索施工與監控工作的大致情況,並應用大型商業有限元軟體algor建立了該橋空間計算模型,建模過程中為了真實地模擬結構換索前的內力狀態,實現內力與線形兼顧,本文使用了「添加邊界元還原結構內力」的方法。
  12. General motors to hunan pump industry limited as the core, from over 30 industries, medium - sized enterprises, design institutes, institutions, and institutions of higher learning of the close strategic cooperation union, relying on a solid technical strength and product design and development capabilities, superb production technology and equipment and strong production base, extensive services in the fields of economic construction

    以湖南通用電機泵業有限公司為核心,由30餘家行業內大、中型企業,設計院所和高等院校組成的緊密戰略合作聯盟,依託雄厚的技術力量和產品設計開發能力,精湛的生產工藝裝備和強大的生產基地,廣泛地服務于經濟建設的各個領域。
  13. The scc has the following advantages : remarkably reducing the noisy pollution and the worker s labor intensity in construction, deducing the rough surface or segregation because of missing - vibration or excessive - vibration in conventional construction, resolving the quality - defect problems resulting from lacking - vibration in the section of complex shapes and densely - packed reinforcement area. at the same time, large of industrial solid waste such as fly ash and blast furnace slag is utilized in the proportioning of scc. it is helpful in comprehensive utilization of resource and environment protection, so the scc belongs to " green concrete ", it is a branch of hpc which will be developed in the future

    這種混凝土可以顯著降低混凝土施工中的噪音污染;大幅度減輕工人的勞動強度;減少傳統混凝土施工中因漏振或過振造成的麻面或離析;解決了配筋密集、結構復雜部位因振搗不足而造成的質量缺陷問題;同時,由於自密實混凝土在配製中,大量利用粉煤灰、高爐礦渣等工業固體廢棄物,有利於資源的綜合利用和生態環境的保護;從而被譽為「綠色混凝土」 ,是未來混凝土向高性能發展的方向之一。
  14. In the new era, we must hap in mind that the cpc ' s progressiveness construction is a long process so as to strengthen and improve it and provide a solid political foundation for the reform and development of institutions of higher learning

    在新時期,只有牢牢把握黨的先進性建設是一個過程的思想,我們高校才能全面加強和改進黨的先進性建設,才能為高等教育的改革和發展提供堅強有力的政治保證。
  15. Then check that the light energy orb is solid in construction and free of cracks and lines and if it is solid then well done

    然後檢查光能量球構造堅固以及無裂縫和裂紋線而如果它是堅固的然後做得不錯的話。
  16. Then check that the light energy star is solid in construction and free of cracks and lines and if it is solid then well done

    然後檢查光能量星構造堅固以及無裂縫和裂紋線而如果它是堅固的然後做得不錯的話。
  17. Then check that the light energy wall is solid in construction and free of cracks and lines and if it is solid then well done

    然後檢查光能量墻構造堅固以及無裂縫和裂紋線而如果它是堅固的然後做得不錯的話。
  18. Then check that the light energy spear is solid in construction and free of cracks and lines and if it is solid then well done

    然後檢查光能量矛構造堅固以及無裂縫和裂紋線而如果它是堅固的然後做得不錯的話。
  19. Then check that the light energy bubble is solid in construction and free of cracks and lines and if it is solid then well done

    然後檢查光能量泡構造堅固以及無裂縫和裂紋線而如果它是堅固的然後做得不錯的話。
  20. " field observation of high rock - fill dams and feedback data analysis " and " dynamic analysis of high earth and rock - fill dams and aseismatic measures ", the concepts and methods obtained in the above two consulting items were creative and evaluated by the ministry of electric power as being of international level. the research findings were adopted in such large - scale projects as the tianshengqiao water contral project, ming tombs water control project. dahe water contral project, ming tombs water control project, dahe water control project and lianhua water control project and awarded the second prize of scientific and technical advancement of the ministry of electric power. ( 2 ) the research on the stress - strain correlation of dam construction materials was awarded the second prize of scientific and technical advancement of the ministry of electric power. ( 3 ) the result of the field observation test and computational analysis for the tailing dam improvement project of xuzhou power plant was adopted by the east - china design institute of electric engineering with considerable economic benefit. ( 4 ) the result of the geotechnical test and data analysis of wenfu mine project was applied in the project with considerable economic benefit. ( 5 ) the field observation and data analysis of the kezier reservoir project provided a solid base for ensuring the normal operation and management of the reservoir

    「高堆石壩原位觀測和反潰分析研究」及「高土石壩動力分析及抗震工程措施研究」咨詢項目提出了具有開拓性的觀點與方法,經電力工業部鑒定評為國際先進水平,該兩項成果已應用於天生橋、十三陵、大河、蓮花等大型工程獲電力工業部科技進步二等獎; 「壩料土動力應力應變關系的研究」咨詢項目獲電力工業部科技進步二等獎, 「徐州發電廠灰壩加固工程勘測試驗與計算分析」咨詢成果已被華東電力設計院設計采納,工程效益顯著; 「甕福磷石膏渣場工程土工試驗與數值分析」咨詢成果已應用於國家重點工程甕福礦肥基地建設,效益顯著; 「克孜爾水庫工程原型觀測數據庫與資料分析」咨詢項目為水庫運行與管理提供了有力保證。
分享友人