solid waste project control 中文意思是什麼
solid waste project control
解釋
固體廢物處理方案管制-
Article 61 if a construction project is put into production or operation while its supporting installations required for the prevention and control of environmental pollution by solid waste have not been completed or have not passed examination, the competent administrative department of environmental protection that examined and approved the statement of the effect on the environment to be occasioned by the the construction project shall order suspension of production or operation and may also impose a penalty of not more than 100, 000 yuan
第六十一條建設項目中需要配套建設的固體廢物污染環境防治設施未建成或者未經驗收合格即投入生產或者使用的,由審批該建設項目的環境影響報告書的環境保護行政主管部門責令停止生產或者使用,可以並處十萬元以下的罰款。 -
Article 13 the necessary supporting installations for the prevention and control of environmental pollution by solid waste specified in the statement of the effect of the construction project must be designed, built and put into operation simultaneously with the main part of the project
第十三條建設項目的環境影響報告書確定需要配套建設的固體廢物污染環境防治設施,必須與主體工程同時設計、同時施工、同時投產使用。
分享友人