span bearing 中文意思是什麼

span bearing 解釋
張索支索座
  • span : n 1 一?〈手指張開時,拇指尖至小指尖的長度,通常九英寸〉。2 (常有短的涵義的)一段時間;很小的間隔...
  • bearing : n 1 忍耐,忍受。2 態度,舉止,風采,姿態。3 關系,影響,方面,聯系 (on; upon); 意義。4 〈常 pl ...
  1. Based on the numerical simulation and accuracy analysis to previous slab ' s test with the ansys program, the study of composite wall, with various detail design under potential load action respectively or jointly is carried on and the wall ' s atress behavior and failure mode is obtained, also the influence to wall ' s stiffness and bearing capacity by kinds of factors, including wall ' s shear span ratio, member ' s section, bar arrangement, etc. based on the hammer blow test and stiffness test, a 1 / 3 scale ten - bay model ' s modality parameter and elastic deformation characteristic is analyzed

    在對密肋復合墻板運用ansys ~ ( ( ? ) )程序進行數值模擬、分析驗證的基礎上,對典型組合墻體在不同連接構造和不同荷載效應組合作用下的受力形態和破壞模式進行研究;計算分析了復合墻體剪跨比、邊框柱截面尺寸、邊框柱配筋大小以及墻板內肋梁肋柱配筋等諸多因素對密肋復合墻體承載力及剛度的影響,得出其變化規律。
  2. A new type of bearing - less disc pm motor is investigated. the motor consists of two functions, one part is a general short - span structure permanent motor and the other is the so - called hybrid type active magnetic bearing

    本文研究了一種新型的片狀無軸承永磁電機,該電機由兩部分組成:普通片狀永磁電機和永磁偏置混合式磁懸浮軸承。
  3. Due to exceedingly flat arched vault of the flat tunnel with outsized span and renewed stress allocation in surrounding rock after excavation, which would inevitably induce some excessively large load on the base of arch, therefore, larger load - bearing capability in the is " foundation is a must. on the other hand, smooth face explosion must be applied to excavation of the arch base to further ensure the integrity and continuity of country rock around tunnel

    特大跨超淺埋隧道拱部結構過于扁平,開挖后發生二次應力分佈,拱腳處的應力過大,要求有較大的地基承載力,拱腳開挖時必須採用光面爆破,保證圍巖的完整性和不受擾動,開挖后及時封閉,防止該處積水軟化圍巖。
  4. Abstract : the calculation method of temporary load of the continuous carrier bar with different distance span was discussed. the length calculation in design of the pressure bearing bar with the different distance span which has to be worked out can be done by means of this method , thus making the structure design in construction more accurate and convenient

    文摘:討論了不跨連續壓桿的臨時荷載計算方法,應用該方法可以解決不跨受壓桿件設計中必須解決的長度計算問題,從而使施工結構設計更為準確簡便
  5. The calculation method of temporary load of the continuous carrier bar with different distance span was discussed. the length calculation in design of the pressure bearing bar with the different distance span which has to be worked out can be done by means of this method , thus making the structure design in construction more accurate and convenient

    討論了不跨連續壓桿的臨時荷載計算方法,應用該方法可以解決不跨受壓桿件設計中必須解決的長度計算問題,從而使施工結構設計更為準確簡便
  6. In particular, the concealed bracings have more evident effects in improving bearing and energy - dissipation capacity of the wall slabs in coupled shear walls with lintel beams of relative smaller span - height - ratio. 4

    特別是在連梁跨高比相對小的雙肢墻墻肢中增加暗支撐對雙肢墻承載力、耗能提高的作用更為明顯。
  7. It shows that the method suggested in the paper is simple, applicable for engineering and has good precision. on the bases of the formulas deduced, and combining with relative test datas, it studies in the paper several factors influencing the bearing performance of the simple beams, such as shape of the external tendons, the equal moment segment length, span - to - depth ratio of the beam, valid initial prestress of the external tendons, area of the internal tension reinforcement, strength of the concrete, vertical distance between

    在公式推導的基礎上,結合相關試驗資料,研究了體外筋的形狀、等彎矩區長度、梁跨高比、有效張拉預應力、體內受拉筋配筋率、混凝土強度、錨固點到樑上邊緣在垂直方向上的距離、體外預應力筋水平段長度(雙折線型體外筋的情況)以及荷載類型等對體外預應力混凝土簡支梁受力性能的影響。
  8. The influences of different reinforcement style of the concealed bracings and different span - height ratio of lintel beams on bearing capacity, stiffness and deterioration process, ductility, hysteresity capacity, energy dissipation and failure features of coupled shear wall were studied through experiment of 7 specimens under low cyclic loading

    通過7個結構試件在低周反復荷載作用下的試驗,研究了不同暗支撐配筋形式、不同連梁跨高比對雙肢剪力墻的承載力、剛度及其衰減過程、延性、滯回特性、耗能、破壞特徵等方面的影響。
  9. The maximal load - carrying capability of the arch support is calculated by adopting mechanical model of curved beam based on its force analysis, and relationship between bearing capacity coefficient of small curvature arch support and radius and span of curved beam is gained based on supporting capacity comparison of curved beam and straight beam

    採用曲梁模型進行了支架系統的受力分析,得到其最大承載能力;通過與直梁支架承載能力相比較,得到了小曲率拱型支架承載能力系數與曲梁跨度和半徑的影響關系。
  10. The outer hull of the wire has been moulded by rolling with small volume and pretty appearance to insure its enough flexibility and high carrent bearing. it can be installed under the circumstances of over six meters of span

    1外殼採用冷軋鋼板一次性滾壓成型,外型美觀,大大增強母線抗彎強度,載荷性能強,適合於6米以上大跨距場所安裝。
  11. Experimental study on bearing capacity and seismic behavior of large - span two - storied vierendeel truss transfer structure

    大跨度疊層空腹桁架整體轉換結構模型受力與抗震性能試驗研究
  12. Model cs2 - dn high - speed bag sewing machine has fairly good capacity, adapted automatic lubrication system. we adapted roller bearing in some parts to accelerate the running speed and make sure the life span can be prolonged. this machine is suitable to make paper bag and woven plastic bag in the bag factories for mass produce. when it is equipped with automatic cutter, it formed high - speed bag making system

    :本機cs2 - dn為性能優越的高速縫袋縫紉機,採用自動加油系統,並局部採用滾動軸承,轉速提高后,能確保使壽命的延長,適用於紙袋廠及紙塑復合袋等的製作,更適合於制袋流水線上使用,特別是和自動剪刀箱配套后,組成高速制袋系統,成為製作紙塑復合袋最理想的設備,可極大地提高復合袋的產量。
  13. With the development of super - tall buildings and long - span bridges, it is necessary to massly use super - long piles because of their high bearing capacity

    隨著高層、超高層建築和大跨橋梁的建設,具有高承載力優點的超長樁的大量使用成為必然。
  14. Under present social economic condition, bridge design should satisfy criterions of design load and increase bearing capacity in order to strengthen service performance. these are contents of bridge structural optimization. diseases in superstructure make the life - span of bridges shortened

    在現今社會的經濟條件下,橋梁設計應該在滿足現行《橋規》設計荷載標準的前提下,適當提高橋梁的承載能力,增強其使用性能,而不是一味地強調造價最低,這就是橋梁結構優化的內涵。
  15. Model gk99 - 1 high - speed auto lubricated sew machine is the fastest bag sewing closer of all the machines, adopyed closed automatic lubrication system. the main running parts are adopted bearing and it prolongs the life span of the machine. this machine is equipped with automatic cutting machinery driven by air and it can cut the thread and tape automatically

    :本機gk99 - 1是所有封包機種中速度最高的封包縫紉機,採用封閉型自動潤滑系統,主要轉動部位採用軸承,使產品使用壽命延長,配有氣動自動切刀機構,能自動切斷線辮及紙帶,配上光電開關和時間繼電器,可實現滿包口袋的自動開車縫紉氣動切線自動停車的自動功能。
  16. The pc rigid frame bridge can meet with the carrying capacity of long span bridge. this kind of structure is fit for the comfortable steer with no other expansion joints except for those at the two ends. it characterized the wholeness of structure, good astigmatic ability and load - bearing ability, construction rapidness, bright and pithiness bridge style, easy to maintain and convenient for segmental construction using the cantilever technique, so rigid frame bridge have taken an increasingly great proportion in bridges constructed and those under construction at city and county

    剛構橋能滿足特大跨徑橋梁的受力要求,除兩端以外無其他伸縮縫,有利於行車平順舒適,具有結構整體性能好、抗震能力強、承載能力強、施工快捷、橋體簡潔明快、維護方便和便於懸臂施工等結構特點,因而在城鄉已建和在建的橋梁中占據了越來越大的比重。
  17. This thesis aims to analyze how to select and assign prestressed tendon, how to design anchorage bearing joint, how to control the crack, how to calculate the axial prestressed force and the third moment and how to design the edge column of top layer. on the base of the research in and out our country and construction of the prestressed structure, some helpful conclusion and suggestion are presented, which is suggestive for the design and construction of long span continuous prestressed concrete frame

    本文將綜合設計與施工兩個方面,對預應力筋的選用、布置,錨固區的設計及構造處理,裂縫問題,側向約束對梁軸向預壓應力及柱中第三彎矩的影響,頂層大跨邊柱設計等幾個問題進行系統的分析研究,並在國內外研究和大量工程實踐的基礎上,提出了一些建議和預防措施,對此類工程設計和施工有一定的參考價值。
  18. For its so many merits, cft ( concrete filled steel tube ) has gotten extensive application in the engineering practice, especially in long - span bridges and high - rise buildings. researches and investigations on the bearing capacities of cft and its time - dependent behavior have been widely carried out

    鋼管混凝土以其諸多優點而在高層建築和大跨度拱橋中得到廣泛應用,國內外很多學者對鋼管混凝土構件的極限承載力以及長期載荷作用下核心混凝土的徐變特性進行了大量的試驗研究和理論探索。
  19. This paper introduces the development and present situation of vibration absorb technology in the world ; generally analysis the rubber - bearing ( rb ) and lrb " s operative mechanism, function and the calculation of parameter ; advance the concept of standardization to lrb ; on the basis of generally analyzing the connected factor such as the site category, the diameter of lead bar, the height of bearing, the designing carrying capacity, the span of bridge, the inherent period and the displacement of rb, determine the parameter, the absorbing vibration target, the method and the process of standardization to lrb ; then according to the two - step rule of resisting and defending earthquake, and combining with the response spectrum theory in the seismic vibration of bridge, make a lot of calculation and analysis of vibration absorb design to the real bridge collected and combined by finite element program ; at last, gives the result of standardization through diagram and explains to its usage

    本論文介紹了國內外減震技術的發展和現狀;綜合分析了普通板式橡膠支座和鉛銷橡膠支座的工作機理、性能及參數的計算;提出了鉛銷橡膠支座標準化的概念;在綜合分析場地土、鉛銷直徑、支座高度、設計承載力、橋梁跨徑、固有周期以及支座變位等影響因素的基礎上,確定了鉛銷橡膠支座標準化的參數、減震目標、方法和過程;並根據抗震設防兩階段原則,結合橋梁地震振動理論的反應譜法,運用有限元程序對收集和組合的實橋進行了大量減震設計的計算和分析;最後以圖表的形式給出了鉛銷橡膠支座標準化的結果,並說明了其使用方法。
  20. For example, the large friction loss of prestressed tendons, complex anchorage bearing joint, the problem of cracks in large area structure, axial compress of long span continuous beam under prestress. all those hinder its use in long span structure. until now days, the cognition about the behavior of such structure under loads is not enough for the realm of prestressed concrete of all the world

    但是,預應力技術應用於大跨連續框架結構,在設計和施工中還存在一些缺點和不足,例如預應力筋的摩擦損失過大,節點錨固區設計和構造復雜、大面積結構的裂縫控制問題、大跨框架梁在預應力作用下的軸向縮短等,這些都是困擾大跨預應力混凝土框架結構應用的突出問題,特別是目前對于預應力混凝土超靜定結構的受力性能,國內外預應力界的認識尚不夠全面。
分享友人