spot testing 中文意思是什麼

spot testing 解釋
抽查
  • spot : SPOT =satellite positioning and tracking 人造衛星定位及跟蹤。n 1 斑點;污點;疵點,缺點。2 地點...
  • testing : 測試系統
  1. In view of bearing capacity of the elastoplastic theory analysis, the author made a comparison between the achieved bearing capacity limit load pi / 4 of round base ( space problem ) and the limit load pi / 4 of bar groundwork foundation design ( plane problem ) from soil mechanics at home and abroad as well as foundation criterion, and explained why the value of formula in present design criterion from soil mechanics is inclined to be conservative. in the light of the author ' s many years experience of vibration test on the spot and the research work of relevant projects, the author worked over the dynamic pile testing of the bearing capacity of foundation and batholith, and gathered the parameter of dynamic analysis and testing. the author also talked over the difficult point of pile foundation design criteria in present batholith engineering world, i. e. the confirmation of batholith bearing capacity of pile end, from the following aspects : a ) confirmation of single axis counter - pressure strength of rock in house ; b ) f. e. m calculation of elastoplastic model ; c ) calculation of soil mechanics ; d ) deep well load test

    然後,對巖土工程領域至今尚未解決,甚至不為人注意的考慮地基變形的地基承載力問題進行了實用化的探討,提出了考慮地基變形的地基承載力上程計算方法;對基於彈塑性理論分析的地基承載力國內尚未見報道的空間問題得到了圓形基礎(空間問題)的承載力界限荷載p _ ( 1 / 4 ) ,並與國內外土力學專著及地基基礎設計規范中的條形基礎(平面問題)的界限荷載p _ ( 1 / 4 ) ,進行了對比,從而定量上解釋了目前設計規范引用土力學承載力公式值偏於保守的這一情況;根據本文作者多年從事現場地基工程振動試驗及相關課題的研究工作,本文以截頭錐模型模擬地基,對地基(巖基)承載力的動測法進行了研究,為各類地基(包括巖基) ,匯總了動力分析和檢測川的參數:針對日前巖土工程界應用樁基設計規范中的難點? ?樁端巖基承載力的確定問題,從巖石室內單軸抗壓強度確定、基於彈塑性模型的有限單元法計算、土力學計算及深斤載荷試驗四方面進行了深入討論;本文作者根據多年現場載荷試驗的工程實踐,對深井荷試驗裝置的核心部分? ?反力裝置,設計了側壁支撐反力加載系統,該加載系統具有實用、簡便、穩定及安個等優點。
  2. Shandong tengzhou huacheng metal co., ltd. enjoyed free mport anf export right awaeded by the state evonomic and trade co mmissiom, with 20years histoy of specolozed in metalwork. our favtory lovated in beauty spot of honghe everglade near weoshan lake in the south - eest of shandong rovince. we regisstered fund is 22 800 000rmb, and thr acreagr id 30000 squares, anthe workshop is 12000 squares, with 358 workerd ( not include the 16 filiale ) but 21 of them are advanced engineers, advances technology, completely testing equipment, good quantity of produces, and advance technology about surface producing, under the spirit of together effort with our clients, our company would make a new view on the surface making in many fields, such as : airplane, vessel, armory, car, container and so on

    山東省滕州市華成金屬製品有限公司是一家具有中華人民共和國自營進出口資格的企業,已有20多年專業生產金屬磨料的歷史,公司位於中國魯西南地區的微山湖紅荷濕地風景區,公司注冊資本2280萬元人民幣,工廠面積30000平方米,車間面積12000平方米,員工358名(不包括下屬16個分廠)其中高級工程技術人員21名,技術力量雄厚,質量檢測手段完善,產品質量穩定,具有先進的表面處理技術.公司本著與客戶共同努力的觀點,在材料和技術應用上不斷創新,不斷提高,把飛機,造船,兵工,車輛,集裝箱等行業的表面處理,強化,推向一個嶄新的局面
  3. The dissertatio n constructs the index system, introduces the coefficients of development, coordination, fairness, and the coefficient of sd, which is composed by the former three and can reflects the sd overall strength of watershed, brings forward the quantative criteria of in order that the research of wrcc is based on the good watershed ecology and environment, the dissertation, according to the ecological appropriate theory, builds the logarithm normal distribution model about the relation between the growth of natural vegetation and the depth of groundwater ; based on this relation model, proposes a quantitative method of ecological water requirement ( ewr ) of natural vegetation in arid area, which utilizes the results of rs technique and the spot testing data of vegetative physiology demand

    針對流域特點建立了基於水資源的流域可持續發展評價指標體系,引入發展系數、協調系數、公平系數,以及由其構成的衡量水資源支撐社會可持續發展綜合水平與能力的可持續發展系數,提出了可持續發展的定量判別方法。為保證在良好生態的前提下進行水資源承載能力研究,論文根據生態適宜性理論,建立了乾旱區典型天然植物生長與主要環境因子的偏態單峰對數正態分佈模型。基於此關系模型,利用遙感技術成果以及植物生理需水的現場實驗數據,提出了乾旱區天然植被生態需水量計算方法。
  4. A good effect is made by using the technology of horizontal subarea and building clustered index. in the testing environment on local machine, the response time of outputting 18, 422 pieces of records from the spot data table induing about 28 million pieces of records is about 8 second

    使用水平分區的技術和建立聚集索引的技術取得了較好的效果,在本機測試環境中,從測點數據表近2800萬條記錄中輸出匹配量為18422條記錄的時間約為8秒。
  5. Thickness testing method of the metal deposits for the light industrial products. spot test

    輕工產品金屬鍍層的厚度測試方法.點滴法
  6. Spot testing on mechanical characteristics of surrounding rock in gates of fully mechanized top - coal caving face

    綜放回採巷道圍巖力學特徵實測研究
  7. Torsion - shear specimen for testing resistance spot welds

    檢測電阻點焊用扭轉剪切樣件
  8. Suggestion on standardizing work of coal quality testing and spot - check

    對規范煤炭質檢抽查工作的建議
  9. Vickers hardness testing of resistance spot, projection and seam welds low load and microhardness

    電阻點焊凸焊和滾焊的維氏硬度試驗
  10. Specimen dimensions and procedure for mechanized peel testing resistance spot, seam and embossed projection welds

    電阻點焊滾焊和浮凸焊接機械剝離試驗的程序和樣品尺寸
  11. Method of fatigue testing for spot welded joint

    點焊接頭疲勞試驗法
  12. Resistance spot welding - destructive tests of welds - method for the fatigue testing of spot welded joints

    電阻點焊.焊接有損試驗.點焊接頭的疲勞試驗方法
  13. Resistance spot welding - destructive tests of welds - method for the fatigue testing of spot welded joints iso 14324 : 2003 ; german version en iso 14324 : 2003

    電阻點焊.焊接的有損檢驗.點焊接頭的疲勞試驗方法
  14. Specimen dimensions and procedure for shear testing resistance spot and embcossed projection welded joints

    剪切試驗電阻點焊和壓印凸焊焊接點的樣品尺寸和抽樣程序
  15. Testing method of the chemical protective coatings of the ferrous metal for the light industrial products. dipping spot test

    輕工產品黑色金屬化學保護層的測試方法.浸漬點滴法
  16. Specimen dimensions and procedure for shear testing resistance spot, seam and embossed projection welds

    電阻點焊縫焊和凸焊的剪切測試用試樣尺寸和程序
  17. The study mainly gets the outcomes through investigating on the spot, testing, inspecting, analyzing and computing as following : ( 1 ) breaking the traditional way, and extending the construction geology prediction " content from main geology condition prediction to the geology condition predication and the disaster predication all should be strengthened

    通過現場跟蹤調查、測試與試驗、監控量測及室內試驗、分析計算等工作,主要獲得了以下研究成果: ( 1 )打破傳統思路,將施工地質預報的工作內容由主要進行地質條件的預報擴展到地質條件預報與地質災害預報並重進行。
  18. Mathematical analysis, computer simulation and spot testing are three basic methods for performance analysis and evaluation

    數學分析法、計算機模擬法和實際測量法是三種基本的分析、評價方法。
  19. ( 3 ) by way of the spot testing for the unit actual operating condition, the emphases of this paper are the actual heating work condition and effecting factors of the vrv heat pump air condition system

    ( 3 )通過現場vrv機組實際運行測試,著重研究了vrv熱泵空調系統制熱運行的實際工況及影響因素。檢驗vrv熱泵空調系統冬季採暖的可行性及節能性。
  20. In the following spot testing, the percentage of the wheel treads irregularities detection precision is high

    在隨后的現場測試中,本系統運行正常,擦傷輪對的準確定位率高。
分享友人