spur line 中文意思是什麼
spur line
解釋
[track] 〈美鐵路〉短叉道,支路。-
We have consulted with american experts, who have seen our ornithological experts work for the spur line, and agreed with their findings
我們曾諮詢美國的專家,他們在了解我們的措施后,亦同意我們的說法。 -
Lok ma chau spur line control point public transport
落馬洲支線管制站(公共交通) -
Sheung shui to lok ma chau spur line the spur line
沙田至中環線上水至落馬洲支線 -
Access to the lok ma chau spur line control point
前往落馬洲支線管制站 -
Access to lok ma chau spur line control point
[前往落馬洲支線管制站] -
Spur line - environmental friendly or not
興建鐵路支線合符環保嗎? -
Transport department - access to lok ma chau spur line control point
運輸署-前往落馬洲支線管制站 -
Spur line from sheung shui to lok ma chau
上水至落馬洲鐵路支線 -
Road closure gn2888 sheung shui to lok ma chau spur line added
封閉道路第2888號公告上水至落馬洲支線 -
Referral from legislative council members meeting - cum - luncheon with yuen long district council on public transport arrangement of tin shui wai and lok ma chau spur line public transport interchange english version only
立法會議員與元朗區議會議員就天水圍及落馬洲支線的公共運輸交匯處的公共交通安排轉介的事宜只備英文本 -
The spur line project would cause a direct net loss of 9. 5 ha of wetlands at lok ma chau within the wetland conservation area adjacent to the mai po and inner deep bay wetland of international importance ramsar site and is ecologically unacceptable at both local and international levels. it would also set a very bad precedent for the conservation of the deep bay wetlands and would have implications for future developments within wca
支線工程將對落馬洲濕地保育區造成9 . 5公頃漁塘凈減少,其位置毗鄰米埔及后海灣內灣拉姆薩爾國際重要濕地,于本地和國際層面均為不可接受的生態損失,亦會對后海灣濕地的存護和濕地保育區的未來發展,立下極不良的先例。 -
Shenzhen district line 1 will connect with the kowloon and canton railway corporation s ( kcrc ) east rail at lo wu station whilst shenzhen district line 4 is planned to connect with kcrc spur line at lok ma chau
深圳市區1線將會在羅湖站與九廣鐵路的東鐵線連接,而市區4線則計劃在落馬洲與九廣鐵路的支線連接。 -
He also agreed that kcrc has not sufficiently proven that there are no other feasible alternative for the spur line
署長亦同意九鐵未能提供足夠資料證實未有其他可行的路線選擇。 -
Wwf hong kong is greatly disappointed by the decision of the epd to approve the kcrc s sheung shui to lok ma chau spur line eia report
自然基金對環保署批準九廣鐵路的環評報告深表失望 -
Wwf hong kong is greatly disappointed by the decision of the environmental protection department to approve the kcrc s sheung shui to lok ma chau spur line environmental impact assessment report. we found the adverse impacts incurred by the spur line project to be environmentally unacceptable, and the eia report failing to meet the requirements of the technical memorandum for the eia process under the eia ordinance because of the following reasons
世界自然香港基金會簡稱世界自然基金會對環保署批準九廣鐵路的上水至落馬洲支線隧道高架橋方案環境影響評估報告下稱環評報告深表失望,認為支線工程會造成不可接受的環境影響,而且環評報告亦未能符合環境影響評估程序的技術備忘錄的要求,因為: -
On 18 september 2001, the chief executive in council endorsed kcrc s proposal to adopt the bored tunnel approach for the construction of the spur line project. kcrc has discussed the tunnel approach with government departments concerned and is preparing a new environmental impact assessment report for the project
於2001年9月18日,行政長官會同行政會議同意九廣鐵路公司的建議,採用隧道方案建造支線項目工程。九廣鐵路公司已就該隧道方案與有關政府部門蹉商,並正制訂一份新的環境影響評估報告。 -
Improve cross - boundary traffic by building a kcr spur line from sheung shui to lok ma chau for completion in 2004
興建一條由上水至落馬洲的九廣鐵路延線,改善過境交通,工程預期在2004年完成。 -
The sheung shui to lok ma chau spur line is due to be finished by 2007
上水至落馬洲的鐵路支線的新建造方案已經擬定,預期二零零七年竣工。 -
The government is committed to implementing the spur line project to relieve the congestion problem at lo wu
政府承諾興建鐵路支線,以紓緩羅湖擠塞的問題。 -
In addition, the government is committed to the spur line project to relieve the congestion problem at lo wu
此外,政府承諾興建鐵路支線,以紓緩羅湖擠塞的問題。
分享友人