stage wall 中文意思是什麼

stage wall 解釋
舞臺的臺口墻
  • stage : n 1 講臺;舞臺;戲院,劇場;〈the stage〉戲劇,戲劇藝術;戲劇文學;〈the stage〉戲劇業;劇壇。2 ...
  • wall : n 1 墻壁;(石、磚等的)圍墻;城墻。2 (形狀、用途)像墻壁的東西,障壁;土堤,堤防。3 (礦井、容...
  1. In order to solve the quality problems occured in using new wall materials, cheap fa - gbs dry - mixed mortar confected in the former stage is used to meliorate its performance

    摘要針對各種新型墻材在使用過程中出現的質量問題,採用前期配製的低成本fa - gbs乾粉砂漿進行改性。
  2. 2 both the hanging wall and the footwail rock of ore bodies are garnet biotite schist, protoliths are alkaline volcanic rocks ( tracyh andesite ). according to characteristics of trace elements assemblages and the setting of tectonics, these alkaline volcanic rocks were derived from the lower degree melting of metasomatic and enriched mantle ( eml ) in the initial stage of middle proterozoic epoch. they strongly enriched in large ion lithophile elements ( lile ), such as ba

    2 、礦體頂、底板圍巖(石榴石黑雲母片巖、鈉長黑雲母片巖等)的原巖為堿性火山巖(粗面安山巖) ,相對富集大離子親石元素ba 、 cs 、 rb 、 k 、 lree及貧zr 、 sr 、 ti 、 hf 、 hree ,為早元古代末期-中元古代早期交代富集地幔低程度部分熔融所形成的堿性火山巖。
  3. Pilsenite is a rare mineral and its information is deficient. the first found pilsenite in china is in gaozhuang, henan province. pilsenite, associated with pyrrhotite, pyrite, hessite, gold, produced in pyrrhotite - polymetallic stage. three bismuth - tellurides produced in gaozhuang are well concordant with the standard pilsenite in composition, and other three are different from any of known bismuth - tellurium minerals. single crystal diffraction were made on a larger mineral grain of pilsenite. au growth and decline together with bi and te in ores and wall - rocks, which suggests that bi and te play a important role in migration and enrichment of au

    經電子探針分析,高莊金礦有多種鉍碲化物,有三粒礦物的成分與標準葉碲鉍礦完全一致。對一較大顆粒的葉碲鉍礦做了單晶x射線衍射分析。 au與bi在礦石和圍巖中的含量呈共消長關系, te與bi可能對au ag的遷移富集起了重要作用。
  4. Halocin c8 appeared to have a very wide activity spectrum, including most haloarchaea and even some haloalkaliphilic rods, but it showed no inhibitory activity against bacterial strains tested. when a sensitive strain of halorubrum saccharovorum atcc29252 was exposed to halocin c8, the treated cells swelled at the initial stage, the cell wall appeared to be nicked and the cytoplasm was extruded out afterwards, and the whole cell was eventually completely lysed

    將敏感菌株halorubrumsaccharovorumatcc29252的細胞用嗜鹽菌素c8處理后,採用電鏡觀察,發現處理2小時后細胞開始腫脹、膨大,接著在細胞的兩端出現裂口,細胞內容物開始向外溢出,隨著時間延長,裂口越來越大,發生這種變形的細胞也越來越多,最後,幾乎所有的細胞完全裂解。
  5. Cell plate a structure that appears in late anaphase in dividing plant cells and is involved in formation of a new cell wall at the telophase stage of mitosis

    細胞板:植物細胞分裂晚後期出現的一種結構,它和有絲分裂末期新細胞壁的形成有關。
  6. Dongzigou ag deposit and jianbaoshan au deposit are hosted in the sandstone of middle - proterozoic suberathem, which are developed from the proterozoic sediment metal source - rocks formed during the meso - proterozoic volcanism and reworked by the mesozoic tectono - magmatism during the formation of the metamorphic core complexes in eastern hebei. the dongzigou ag deposit has the characteristics of reformed strata - bound origin, the jianbaoshan au deposit, located in the detachment fault, is the alterated rock type. both deposits have the similar wall - rock alteration, and show the same trace element behavior, and ree patterns. they are the results of the multi - stage tectono - magmatism in the environment of continental extension in eastern hebei region. their mineralization depended on their wall rocks and relative location in metamorphic core complexs

    賦存於中元古宙長城系常州溝組的洞子溝銀礦床和尖寶山金礦床是由密雲-都山變質核雜巖構造體系所控制的一組礦床。其成因為中元古宙火山巖漿活動形成的沉積礦源,后經中生代的變質核雜巖構造巖漿體系疊加改造而成。洞子溝銀礦床具有層控迭加改造的特點尖寶山金礦床則具有破碎蝕變巖型礦床的特點。
  7. Design of demolition blasting of complicated structure of concrete cut - off wall in second - stage downstream cofferdam of three gorges project

    三峽二期下游圍堰砼防滲墻復雜結構拆除爆破設計
  8. Blasting monitoring and safety control during the demolition blasting of concrete cut - off wall in second - stage downstream cofferdam of three gorges project

    三峽二期下游圍堰混凝土防滲墻拆除爆破震動監測與安全控制
  9. On the basis of the experimental research, its hysteresis characteristics, calculation method of stiffness in different stage and ultimate bearing capacity are discussed. based on a seismic design method on the new lateral resistant system is concluded according to the research result in the paper. the effect of some parameters is discussed on steel frame with cavity sandwich wall infill and some design suggestion is presented

    在試驗研究的基礎上,建立了該體系的恢復力特性模型,提出了模型各受力階段的剛度計算公式、極限承載能力的計算方法和抗震計算方法;對影響空腔結構砌體填充墻鋼框架抗側力性能的因素進行了討論,提出了設計建議。
  10. It is discovered that the combustion condition of the second stage pc is up to the outlet temperature of the first stage pc and the content of combustible gases in first stage flue also plays positive effect on the ignition of second stage pc. the effects of parameters of two coal - air mixture, wall temperature of first ignition chamber and annular filling air on imfit are studied experimentally in this thesis. in this thesis, the numerical simulations of ignition and combustion of pc in imfit are conducted

    本文通過建立數學模型,對感應加熱煤粉多級無油點火進行數值模擬,研究了一級煤粉煤粉在點火室內的著火過程和二級點燃過程、煤粉粒徑分佈對煤粉多級無油點火的影響,研究了一級點火室壁面溫度、一級煤粉氣流和二級煤粉氣流的風粉參數在煤粉多級無油點火過程中的影響規律;根據二級點燃段的流場和溫度場分佈,研究了環形夾心風推遲二級煤粉著火的機理。
  11. Later, the sharks no longer crash that glass, and for those who colorful tropical fish are no longer concerned about, as if they would only move the wall murals, which began waiting for the day the carp will be fixed, and then used his quick instincts hunting, like to return to the sea insufferably arrogant vicious domineering, but it is all just fake like just experiment at the end of the stage, glass laboratory personnel will be removed, but the shark did not respond in a day is fixed regional travel to its tropical fish not only for those who turn a blind eye, even when those carp escaped to the side, he immediately abandon the chase, saying that the past does not wish, the end of the experiment, laboratory personnel sneer at sea it is the most cowardly of fish

    后來,鯊魚不再沖撞那塊玻璃了,對那些斑斕的熱帶魚也不再在意,好像他們只是墻上會動的壁畫,它開始等著每天固定會出現的鯽魚,然後用他敏捷的本能進行狩獵,好像回到海中不可一世的兇狠霸氣,但這一切只不過是假像罷了,實驗到了最後的階段,實驗人員將玻璃取走,但鯊魚卻沒有反應,每天仍是在固定的區域游著它不但對那些熱帶魚視若無睹,甚至於當那些鯽魚逃到那邊去,他就立刻放棄追逐,說什麼也不願再過去,實驗結束了,實驗人員譏笑它是海里最懦弱的魚。
  12. There are three plays : " wall - jumping & chess - playing ", emphasizing an implicit agreement among three characters full of interesting performance behind the back one another ; " the trident road ", noted for the fighting actions ; and " to pick up a jade bracelet ", performing a variety of basic stage actions such as to embroider, to clearly make an explanations of an agricultural woman life style in the olden days

    劇目有三:西廂記:跳墻著棋有很多背功的趣味戲,強調西廂記三個角色之間的默契;三叉口是以武打動作取勝的崑曲摺子戲;拾玉鐲以花旦為主,其中許多旦角的舞廳基本動作,如趕雞、繡花,詮釋出古代農村婦女的生活形態。
  13. The wall was equaled to an elastic composite slab with silica bricks as main body and concrete rib beams, columns and outer frame as reinforcing fiber. ( 2 ) elastic - plastic stage. the wall was equaled to a rigid frame - oblique compression bar model in which concrete frame was equivalent to a rigid frame while silica brick was equivalent to a oblique compression bar

    ( 1 )彈性階段? ?將墻體視為一種以輕質砌塊為基體,混凝土肋梁、肋柱、外框為增強纖維的復合材料等效彈性板; ( 2 )彈塑性階段? ?將墻體視為一個由鋼筋混凝土剛架和與之鉸接的砌塊等效斜壓桿組成的剛架斜壓桿組合模型; ( 3 )破壞階段? ?將墻體視為肋梁嚴重破損的梁鉸框架模型。
  14. The first stage will be built with two 88m long tunnel kilns, annual output 2 million m2 of exterior wall tiles

    工廠分兩期建設,第一期建88米長隧道窯兩條,年產外墻磚200萬平方米。
  15. 1994, each team arrived at beijing then took a train to head for the silk road. held 4 days stage race along the silk road, the finish point was tun - huang, which is famous for its world s legacy wall painting

    集北京的各國選手轉乘飛機和火車,將賽場移至甘肅省的黃河沿岸和絲綢之路,終點選在了以壁畫聞名界於世的敦煌。
  16. This paper analyzes and explores stress strain model and principle of the project of concrete diaphragm wall after concluding other engineers and project practices and describing the seepage and deformation character of the plastic concrete used in the cofferdam of the second stage of the three gorges project. we analyze and forecast the change trend by using mathematics statistics regression, then we get the best regression equation. finished it, we used this way to the cofferdam of the second stage of the three gorges project. it proves that the method which i have introduce in this article is effective for the stability of concrete diaphragm wall and it is also a valid for supervising cofferdam security after using it in many projects

    本文在總結前人和其他工程實踐的基礎上,結合三峽二期土石圍堰實例綜合分析塑性混凝土防滲墻的滲透和變形特性,對三峽二期圍堰砼防滲墻的應力應變模型、原理進行了分析、探討,在監測分析資料的基礎上進行數學統計回歸分析,並對變形進行預測,通過對砼防滲墻及堰體的應力應變監測數據進行數學統計回歸分析,得出了最佳回歸方程,並對三峽二期圍堰變形進行預測,達到了對圍堰安全性監測評價的最佳效果。
  17. Experimental research of blasting demolition of concrete cut - off wall in second - stage downstream cofferdam of three gorges project

    三峽二期下游圍堰混凝土防滲墻拆除爆破試驗研究
  18. The choice dam type is especial importance, during the designed research of the rock - fill dam, particular under the rock - fill dam with very deeply cover layer, the stress and strain of the middle wall and cutting interpenetration wall of the dam foundation is mostly sensitive, whether the. design of dam is scientific and reasonable, it is very important for cutting interpenetration and stability of the dam, the article offer the reference for the design of cutting interpenetration in the foundation with deep cover with earth the water conservancy in xiaban zone, based on the study and analysis the design of cutting seep in the foundation with deep cover with earth, cutting interpenetration concrete wall and the joining model of cutting interpenetration material in body of dam and the applying effect in the practical worko based on the foundation which absorbed and summarize the achievement of design and research in the inter and outer country, for the project of the clay vertical middle wall and vertical cutting interpenetration, the asphalt concrete vertical middle wall and vertical cutting interpenetration the clay inclined middle wall and the lever carpet layer cutting interpenetration, respectively in terms of the different stage of complete period sluice period and working condition, adopting nonlinear calculate and analysis with the finite element method ; carrying the analysis and study with the 3d finite element method as to the different joining model of the left bank high slope cutting interpenetration body and the foundation concert cutting interpenetration wall ; carrying the analysis and study with the 3d finite element method as to the effect of the wall stress and strain because of the different elasticity modulus of the concert cutting interpenetration wall through the analysis and study with the different project. have comparatively all - around comprehended the various model dam, particular the distribute rule of stress and strain of the cutting interpenetration system, provide for the important evidence of the plastic area size the join model of the foundation cutting interpenetrate wall and dam body cutting interpenetrate system the choice of the dam model and the design of the structure of the dam body, the result of research and advice have very importance value in design and building for the similarity project

    工程設計中,壩型的選取顯得尤為重要,特別對于壩基有深厚覆蓋層的堆石壩,心墻和壩基防滲墻的應力和變形是壩體、壩基最敏感的部位,設計方案是否安全、科學和合理,對大壩防滲和穩定起到至觀重要的作用。本文研究分析了國內外深厚覆蓋層基礎防滲設計、壩基混凝土防滲墻與壩體防滲體銜接形式及工程實際應用效果,為下坂地水利樞紐工程深厚覆蓋層基礎防滲設計的方案選擇提供了參考;在吸收和歸納了國內外堆石壩的設計研究成果的基礎上,對粘土心墻和壩基垂直防滲方案、瀝青混凝土心墻和壩基垂直防滲方案以及粘土斜心墻和壩基水平鋪蓋防滲方案,分別按竣工期和蓄水運行期的不同工作情況進行了有限元非線性計算分析;對左岸高陡邊坡的大壩防滲體與基礎混凝土防滲墻的不同結合型式進行了三維有限元靜力計算分析和研究;對混凝土防滲墻不同彈性模量對墻體應力和變位的影響進行了三維有限元靜力計算分析和研究。通過對不同方案的計算分析和研究,比較全面的了解了各方案壩體,尤其是防滲體的應力和變形分佈規律,為壩型選擇、壩體結構設計、基礎防滲墻與壩體防滲體的結合型式以及塑性區大小的確定提供了重要依據。
  19. Directing against tube - burst problem of austenitic stainless steel pipe in final stage superheater of boiler no. 1 in one power plant, it is believed that the main cause to be peel - off of oxide skin from inernal wall of steel pipe and blockage in the said tube through macroscopic examination, metallurgical analysis and oxide skin inspection

    摘要針對某電廠1號鍋爐末級過熱器奧氏體不銹鋼管爆管問題,通過宏觀檢驗、金相檢驗和氧化皮檢測,確定其主要由鋼管內壁氧化皮脫落堵塞所致。
  20. Abstract : a brief introduction to scientific research in the three gorges project ( tgp ) and the applications of research achievements is given, which include treatment of newly slited layer on the foundation of the first stage earth - rock cofferdam, dumping bottom technique of river closure in deep water, construction of cut - off walls in the second stage earth - rock cofferdams, 3 - d computer simulation of river closure, concrete casting alternatives and selection of major construction equipment for the second stage construction optimization of durability of raw materials of concrete, deep sliding resistance and stability of the intake dam section, the section of the intake of the power station, the intake penstock of the power station, layout and hydraulics problems of shiplocks, stability of high slopes of shiplocks, and optimization of the system structural anchor bars to reduce the risk of cracking in the concrete wall and 700mw turbine generator units

    文摘:介紹三峽工程的科研項目,綜述三峽工程開工以來的主要科研成果及工程應用情況,包括:一期土石圍堰基礎處理與施工技術;大江截流上下游土石圍堰平拋墊底研究;二期圍堰防滲工程研究;大江截流計算機科學管理;大壩混凝土澆築方案及主要施工機械選型;混凝土的原材料和耐久性優化試驗研究;大壩基礎深層抗滑穩定研究;三峽電站進水口型式研究;鋼襯鋼筋混凝土引水管道研究;蝸殼打壓、廠壩間伸縮節問題研究;永久船閘的引航道布置、輸水系統及水力學、高邊坡穩定、混凝土襯砌墻的結構與支護研究;特大型水輪發電機組的科學研究。
分享友人