station elevation 中文意思是什麼

station elevation 解釋
測站高度
  • station : n 1 站,臺,車站;航空站,機場。2 派出所;署,局,所。3 【無線電】電臺,電視臺。 4 駐地,部戍地,...
  • elevation : n. 1. 高舉,高陞;【醫學】挺起,隆腫。2. 升級;上進,向上。3. 高尚。4. 高處,高地,高度;海拔;(槍炮的)仰角,射角;【測】標高。5. 【建築】正視圖;立視圖。
  1. 2 ) the quantity of eal increased largely compared with the former set, for example each base station elevation 13 %. 3 ) operation receipt enhanced by 20 %

    我通過多次試驗總結出了500mw於10mw基站共同組網的方法,從而制定出完整可行的網路改造方案。
  2. To provide necessary data for design bypass pipe, an enlargement to bi liu river reservoir, the following problems have been studied by hydraulic model and theoretical analysis : the energy losses in water head of the bypass pipe system and of the flow - control valve and their scale effects, measurement and calculation of the discharge of the bypass pipe system during the bypass pipe system operation with and without the new water power station, the hydraulic characteristics of the water tunnel and draw - off pipe, the flow rate of the aqueduct bridge and the draw - off pipe and the water elevation of the flow in the aqueduct bridge during the old water power station operation with and without the new water power station

    大連市碧流河水庫供水工程取水頭部由引水渡槽、節制閘、進水閘、泄水閘等建築物組成。由於本工程場地條件限制,增設旁通管后布置非常緊湊,管道急轉角度大且轉彎距離較小,對于管內水流流態是否滿足要求,需要經過模型試驗進行論證,以確保工程的可靠性。旁通管具有上水與泄水要求,對其過流能力也要經試驗確定,為碧流河水庫增建旁通管設計提供依據。
  3. Because the elevation data we have acquired through gps is too variable to satisfy the mapping accuracy requirement the elevation value is solved by the water lever observation in the hydrology station and datum horizon correction of sounding observation

    由於gps的rtk模式測量所獲取的高程精度不能滿足測圖精度要求,因此其高程值是通過測量水深值、結合其統一到基準面的改正數、根據相關水文部門各水位站提供的水位觀測資料綜合計算獲得。
  4. Elevation of station : 55m above mean sea level

    氣象站的高度:高於平均海平面55米
  5. Elevation of station : 15m above mean sea level

    氣象站的高度:高於平均海平面15米
  6. Elevation of station : 94m above mean sea level

    氣象站的高度:高於平均海平面94米
  7. Elevation of station : 24m above mean sea level

    氣象站的高度:高於平均海平面24米
  8. Elevation of station : 32m above mean sea level

    氣象站的高度:高於平均海平面32米
  9. Elevation of station : 89m above mean sea level

    氣象站的高度:高於平均海平面89米
  10. Elevation of station : 21m above mean sea level

    氣象站的高度:高於平均海平面21米
  11. Elevation of station : 34m above mean sea level

    氣象站的高度:高於平均海平面34米
  12. Elevation of station : 16m above mean sea level

    氣象站的高度:高於平均海平面16米
  13. Question 19 : since the elevation on the spot varies, shall we design the station according to the topography or make some alterations on the topography there

    現狀基地高差較大,是否結合地形設計站場還是對地形進行調整? ?
  14. Analysis and application of topcon gts - 602 total - station instrument to measure elevation

    602全站儀高程聯系測量的分析及應用
  15. Note 7 - remarks as to the origin may take the form of a boring number and sample number in conjunction with a job number, a geologic stratum, a petrologic horizon or a location description with respect to a permanent monument, a grid system or a station number and offset with respect to a stated centerline and a depth or elevation

    注7 -對于原狀樣的記號可以採用下面的形式,一個鉆孔編號和一個樣品編號聯合一個工作編號,一個地質地層,一個巖石層位或者一個考慮為永久界標的原地描述,一個柵格系統或者一個測站編號和考慮到規定的中心線和深度或海拔的偏移量
  16. Collecting enough quantity and densities three - dimensional coordinates of characteristic points on the earth ' s surface with total station. seting up the digital elevation model ( dem ) with region manager

    應用全站儀在規劃區域的地表採集足夠數量和密度特徵點的三維坐標,在gis軟體regionmanager輔助下,建立流域數字高程模型( dem ) 。
分享友人