stayed-cable 中文意思是什麼

stayed-cable 解釋
斜拉索
  • stayed : 待在某個地方
  • cable : n 凱布爾〈姓氏〉。n 1 【造船】錨鏈,錨索,(周長10英寸以上的)左捻三根三股索;粗索,巨纜;鋼絲繩...
  1. Design of inclined cable for aqueduct cable stayed bridge

    渡水管斜拉橋索的設計
  2. In single pylon cable stayed bridges, and cable stayed bridges without backstays, when the bottom of the tower bears the moment from the dead load, it is concluded that non - symmetric configuration of pile cluster corresponding to the upper structure is more practical than symmetric configuration of pile cluster

    當獨塔斜拉橋、無背索斜拉橋等橋梁塔底永久作用有彎矩時,與完全對稱的基礎形式相比較,和上部結構相協調的不對稱基礎形式更加適用。
  3. By its multi - solution idea, we can focalize discretionary detail of detection of cable - stayed bridge and process in time field and frequency field

    利用小波分析的多解析度分析思想,可以聚焦到信號的任意細節進行時頻域處理,適合斜拉橋振動狀態的監測。
  4. The cable-stayed bridge with its many geometrical configurations will be applied in great numbers in the future.

    多種幾何型式的斜拉橋以後將大量採用。
  5. The versatile cable-stayed bridge concept lends itself to a large variety of geometrical configurations.

    具有靈活性的斜拉橋設想,使其幾何型式有多種多樣變化。
  6. Based on using elementary ideas of the latest theories with the combination of extensive achievements of bridge condition assessment and the other correlative domains, the assessment model was established using analytic hierarch process and variable weight synthesizing, which evaluated pc cable - stayed bridge ' s condition in service by grading items in bottom level of assessment model

    在吸收和採用已有成果的基本思想的基礎上,結合國內外橋梁評估領域和其他相關領域的研究成果,建立了以層次分析法結合變權綜合原理為基礎,通過打分方式對pc斜拉橋的狀態進行評估的架構與模式。
  7. The studies of this paper is a beneficial porker to the cable - stayed bridges with long span, which will bring about a good social or economic benefit

    本課題研究與實橋應用,對大跨度斜拉橋施工監測監控做出了有益的探索,取得了較好的社會經濟效益。
  8. The stonecutters bridge, planned as a cable - stayed structure, will have a span of about

    昂船洲大橋屬斜拉橋式設計,跨距約為
  9. A comparison of steel deck weights indicates that the cable-stayed bridge again fills the void between the continuous girder and suspension bridges.

    以上鋼橋面重量的比較指出,斜拉橋介於連續梁和懸索橋之間。
  10. One of the most noticeable structrual differences between the cable-stayed bridge and the truss and girder types lies in the field of flexibility.

    斜拉橋與桁架和梁式類型橋之間,在結構上的一個最顯著不同之處,在於柔度方面。
  11. According to the information concerned, the analogous structure were adopted on the alamilo bridge in sevilla, spain and on the curved cable - stayed bridge on golf court in xiaoye city, bingbu country, japan. at present, this kind of structure has not utilized all over the country yet. nanjing, the region of basic seismic intensity 7, is an unfavorable site for anti - earthquake in terms of geological conditions according to seismic code for buildings

    但是,主塔屬于傾斜高聳結構,拱屬于柔性拱結構,索屬于特殊懸索結構,經檢索了解,西班牙sevilla的alamilo橋和日本兵庫縣小野市內高爾夫球場上的曲線斜拉橋採用過類似結構,國內目前尚未有此形態的結構記載,南京地區地震基本烈度為七度,地質條件按照建築抗震設計規范之規定,屬對抗震不利地段。
  12. This thesis studies shear lag effect on three representative forms of cable - stayed bridge cross sections by different theoretical methods

    本文針對斜拉橋具有代表性的三種截面形式,採用不同理論計算方法對其剪力滯效應進行研究。
  13. General view of cable stayed bridge main pylon

    斜拉橋及主塔之概況
  14. Cable stayed bridge - asphalt paving work

    斜拉橋-瀝青鋪設工程
  15. Cable stayed bridge main pylon construction

    斜拉橋及主塔建造
  16. Cable stayed bridge - pylon above deck

    斜拉橋-橋面主塔工程
  17. Nonlinear analysis of stayed cable

    斜拉索非線性分析
  18. According to the finite element method result, the parametric vibration of cables in cable - stayed arch bridge becomes prone to be exhibited. then a model of non - linear parametric excitation vibration coupling the stayed cable and the girder, namely, the mode of cable - stayed beam, is proposed in the thesis. and the nonlinear dynamical

    3 、首先利用有限元分析方法,得出了斜拉索發生參數共振的可能,然後建立了斜拉拱橋拉索-橋面耦合參數振動模型,即索-梁組合結構模型,推導了索-梁組合結構非線性運動方程,利用多尺度方法研究斜拉索的參數共振和亞諧波共振,並對穩態解的穩定性進行了分析。
  19. Aiming at main project of the xiaoxihu bridge, a low pylon cable - stayed bridge, based on the existing theory and method of the bridge construction controlling theory, using the basic function of " ansys ", farther exploitation was done on concrete elasticity and creep calculating distinguishingly, nonlinearity analysis theory was used to construct the space model, the main beam, string pylon and abutment were simulated by the beam elements which was considered the shearing effect. which is worthy of considering that using the geometric non - linear truss elements to simulate the stayed - cable, form traveler is modeled as structure elements and participate in stress analysis. four stages are used to model the construction stage, which are : ( 1 ) the erection of form traveler ; ( 2 ) placing the segmental concrete ; ( 3 ) jacking the tendons ; ( 4 ) tensioning the stay cables

    針對建設中的小西湖矮塔斜拉橋的主體工程,結合已有的橋梁施工控制的理論和方法,利用大型通用計算軟體ansys的基本功能,並著重在混凝土彈性計算及徐變計算方面做了相應的二次開發,採用非線性分析理論並建立了空間結構模型、用考慮剪切作用的梁單元模擬主梁、索塔和橋墩;用可考慮幾何非線性的桁元模擬斜拉索、施工掛藍作為結構單元進行拆裝,參與受力計算,整個施工過程按施工循環周期分為若干階段,每個階段又分為四個工況,即:空掛藍就位、澆築完畢階段混凝土、張拉預應力鋼筋和張拉斜拉索。
  20. Process in the anasyis method of wind - induced vibration for long span stayed - cable bridge

    大跨度斜拉橋風振響應研究進展
分享友人