steam reservoir 中文意思是什麼

steam reservoir 解釋
儲汽筒
  • steam : n 1 蒸汽,水蒸氣,水氣,霧,蒸氣壓力。2 〈口語〉精神,精力,氣力;怒氣。3 輪船,乘輪船旅行。vi 1 ...
  • reservoir : n. 1. 貯藏所;貯氣筒;貯水池,水庫;貯水槽,水槽;貯存器;貯油器,油筒,油箱;貯墨管;【解剖學】貯液囊。2. (知識、精力等的)貯藏,蓄積。vt. 貯藏;在…設貯藏所[貯水槽]。
  1. Within the rock which forms the highly permeable reservoir convection currents of hot water or steam occur.

    在形成高滲透性熱儲的巖體內,存在水或蒸汽的對流運動。
  2. A natural escape of hot fluids from the steam reservoir should be prevented by cap rocks with low permeability.

    只要存在通透性能低的蓋層,蒸氣儲放熱流體就不會自行外逸。
  3. The heat contained in a natural steam field is exploited by drilling a suitable number of wells down to the reservoir.

    天然蒸氣田所含有的熱能可以通過鉆井的方法,即打適當數量的井孔到達熱儲的方法進行開采。
  4. According to the reservoir conditions and fluid properties, a systematic feasibility study of hot - water injection development is conducted by using a numerical technique for lower interval of du66 block in three aspects : ( 1 ) adaptability of hot - water injection development ; ( 2 ) distribution of residual oil in a later stage of steam stimulation ; and ( 3 ) potential of hot - water injection development

    根據杜66塊下層系油藏條件及地層流體性質,從注熱水開發油藏適應性、吞吐後期剩餘油分佈規律和注熱水開發潛力等3個方面,利用數值模擬技術對杜66塊下層系注熱水開發可行性進行了系統研究。
  5. Technical requirement for steam injection development project design of heavy oil reservoir

    稠油油田注蒸汽開發方案設計技術要求
  6. Specification requirement for dynamic monitoring heavy oil reservoir development by steam injection

    稠油油藏注蒸汽開發動態監測錄取資料的內容及要求
  7. The 1owing material balance method, a new method for reservoir engineering dynamic analysis, is presented and applied to the well test analysis of heavy oil steam stimulation, calculating the heating radius and formation contaminant factor in this paper

    摘要介紹了一種新的油藏工程動態分析方法流動物質平衡方法,並將該方法應用於稠油蒸汽吞吐試井分析,計算出加熱半徑和地層污染系數。
  8. In the gucheng ( ancient city ) oil field, where isotope trace injection profile test is not suit for, by having applied and spread the temperature method injection profile testing technique, a comparatively accurate injection profile result has been got. furthermore, during the process of dynamic monitor in steam injection development reservoir, the testing technologies of general well ' s temperature throughput profile in injection steam throughput production well and general well ' s temperature taking in steam profile in intermission steam pushing injection steam well are initiated, which having extended the applied field of the conventional temperature logging equipments, reduced the dynamic monitoring cost of thermal production reservoir greatly and provided much accurate and reliable data for the study of reservoir ' s behaviors and adjustment of developing projects

    在不適宜進行同位素示蹤吸水剖面測試的古城油田,推廣應用了井溫法吸水剖面測試技術,取得了較為準確的吸水剖面,而且在注汽開發油藏動態監測工作中,首創了注蒸汽吞吐採油井普通井溫法吞吐剖面測試技術和間歇汽驅注汽井普通井溫法吸汽剖面測試技術,拓展了普通井溫測井裝備的應用領域,大大降低了熱採油藏動態監測成本,為油藏動態研究和開發方案調整提供了大量準確可靠的資料。
  9. Steam is formed if the boiling point pressure for the temperature of the reservoir is reached.

    如果達到對應于熱儲溫度的沸點壓力,就會形成蒸氣。
  10. This paper summarized the forming - distributing mode and its controlling factors of the remains in the dalinhe heavy oil reservoir of the shu district in the liaohe oilfield on the basis of the character of the steam - injecting pouring and steam flooding

    摘要從蒸汽吞吐和蒸汽驅採油特點出發,總結了遼河油田曙二區大?河稠油油藏剩餘油形成控制因素和分佈模式。
  11. Reservoir physical property variation features after steam injection for thermal recovery of the heavy oil reservoir at shengli petroliferous province

    勝利油區稠油油藏注蒸汽熱采后儲層物性變化特徵
  12. This paper presents the calculation formula for determination of reasonable soak time and heated radius at end of soaking by analysis of changes of oil layer and steam energy during soaking period, based on basic theories of reservoir engineering and heat transfer

    應用油藏工程、熱傳遞基本理論剖析了燜井過程中油層和蒸汽的能量變化,推導出確定合理燜井時間的計算公式和燜井結束后加熱半徑的計算公式。
  13. In order to improve the effect on the development of heavy oil well and prevent energy of the reservoir from decreasing in m120, nitrogen & steam soak technology should be adopted

    摘要八面河油田面120區儲層滲透率較低,油層原油粘度較大,出現了熱采效果差,地層能量下降快的現象。
分享友人