steel skeleton 中文意思是什麼

steel skeleton 解釋
鋼骨架
  • steel : n 1 鋼,鋼鐵。2 鋼製品;刀,劍,打火鐮;(女人胸衣等中的)松緊鋼條[絲];鋼磨;〈美國〉剃刀,小刀...
  • skeleton : n 1 骨骼,骷髏;(房屋、傘、扇子等的)骨架;殘骸;(葉子的)脈絡;筋。2 骨瘦如柴的人[動物]。 3 梗...
  1. Installation of multistory steel skeleton components in the suzhou jianyuan mansions

    蘇州建園大廈多層鋼骨構件安裝技術
  2. With the fea software ansys and shell element which has high - precision, this dissertation optimize the size and thickness of skeleton section and seek steel pipe which still have strength and stiffness surplus under static state working condition : sinkage of 240mm of rear wheel. it ' s fully loaded in the state of static bending and torsion. after that, amelioration is achieved for even strength design

    本課題運用ansys有限元分析軟體,並且使用精度較高的shell殼單元作為建模單元,在靜態條件下,通過對左右後輪下沉240mm的彎扭聯合工況的模擬分析,尋找出骨架中存在強度和剛度富裕的構件,使之達到輕量化改進的目的。
  3. Tianbao stainless steel products factory is a large - scale and skeleton enterprise that located at the " country of stainless steel products " - - caitang town, specializes in producing and designing series construction project products ( high - grade door handle ), sanitary fittings ( wall - hung clothes hood, wall - hung soap extruder, luxury shower, various kinds of bath towel holder and toilet brush ) etc

    天寶不銹鋼製品廠位於"不銹鋼製品之鄉-彩塘鎮. "是一家規模骨幹企業.專業生產設計工程產品系列(高級拉手等) .衛浴系列(壁式衣鉤,壁式皂浴器,豪華淋浴器,多款浴巾架及馬桶刷等)
  4. To meet the demands for large space and flexible compartmentation of buildings, laminated vierendeel trusses are adopted in high - position transfer story structures. first the bearing characteristics are analyzed, in which reasonable stiffness ratio of the upper chord, middle chord, and lower chord is derived. then combined with an actual engineering model ( 1 8 similar ratio ), the static loading and pseudo - dynamic tests of two models for laminated vierendeel truss used in transfer story structures are conducted, in which one model adopts reinforced concrete, and the other adopts prestressed concrete and shape steel concrete. seismic behaviors are analyzed, including inter - story displacement, base shear - displacement skeleton curves, and equivalent viscosity - damping curves. a program is programmed to carry out the elasto - plastic dynamic analysis, and displacement time - history curves of the two models are derived. the test and analysis results show that the laminated vierendeel truss with prestressed concrete and shape steel concrete has excellent seismic behaviors. it can solve the disadvantages of laminated vierendeel trusses used in transfer story structures. finally, some design suggestions are put forward, which can be referenced by similar engineering

    為滿足建築物大空間和靈活隔斷要求,在高位轉換層結構中採用迭層空腹桁架結構.首先分析了其受力性能,得出了空腹桁架各構件合理的截面剛度以及布局形式.然後結合一實際工程,進行了兩榀迭層空腹桁架轉換結構模型( 1 : 8相似比)的豎向荷載下靜力試驗以及擬動力試驗.其中一榀為普通混凝土迭層空腹桁架,另一榀配置了預應力和鋼骨混凝土,對比分析了兩模型的層間位移比、骨架曲線以及等效粘質阻力系數等抗震性能的比較,並進行了彈塑性動力分析.試驗和分析結果表明,配置預應力和型鋼混凝土的迭層空腹桁架轉換結構具有良好的抗震性能,可以成功地解決迭層空腹桁架作為轉換層結構所產生的弊端問題,最後對這類轉換層結構提出了相應的設計建議
  5. The moderate supersonic carbon added to the mold flux for ultra - low carbon steel is used to stay the melting speed as skeleton. then the mold flux coils have the good adiabatic, insulation and even flow property. at the same time it cause the carbon increase in the steel slabs and the operation of the ultra - low carbon is affected at last

    超低碳鋼連鑄結晶器用保護渣中,外加中超碳黑作為骨架降低熔化速度,使保護渣具有良好的絕熱保溫性、均勻流動的潤滑性,但同時卻會引起鋼鑄坯的碳增量,最終影響超低碳鋼的成功操作。
  6. Fabrication of the box beam is divided into such parts as reinforcement, formwork, concreting, prestressing, moving and storing of beam, pipe grouting under pressure, end sealing of the beam, water - proof layer on the bridge surface system, protective coating etc. the paper makes description of effective box beam construction technology and workmanship which can be adopted in other projects, such technologies as : manufacturing and fixing of reinforcement, steel reinforcement fixing baseplate, web plate and top plate respectively and lifting the steel skeleton into form, requirements of design and manufacturing and way of utilization for dismantling - erection type formwork and hydraulic formwork, optimization of concrete ratio, concrete pouring process of two ends of beam in priority over the middle, in sequence of first baseplate followed by web plate and top plate at last, concrete pouring in inclined section and in horizontal layer, concrete vibration mainly by external vibrator in assistance with internal vibrator, methods and regulation for steam curing of concrete, dual controls over stress and strain to ensure quality of prestressing workmanship, construction method of effective beam moving by heavy - weight special moving facility, some regulations and key notes about construction of grouting under pressure, beam ends sealing, water - proof layer on the bridge surface system, protective coating

    箱梁製造由鋼筋工程、模板工程、混凝土工程、預應力工程、移存梁工程、孔道壓漿工程、梁體封端工程、橋面防水層和保護層工程等施工環節組成。文中介紹的採用胎具製作和綁扎鋼筋,分底腹板和頂板分別綁扎並吊裝鋼筋骨架入模;拆裝式和液壓式兩種模板的設計、製作要求和使用方法;綜合考慮、優化混凝土配合比,混凝土灌注從兩端至中間、先底板、后腹板、再頂板的施工順序和斜向分段、腹板水平分層、附著式振搗為主、插入式搗固為輔的施工工藝,蒸汽養護的方法和規定;應力應變雙控制確保預應力施工質量的施工技術;採用重物移運器有效移梁的施工方法;壓漿、封端、橋面防水層和保護層施工的一些規定和注意事項等都是對箱梁製造行之有效的施工技術和施工方法,並可為以後類似施工作借鑒。
  7. Plastic - steel mesh skeleton - plastic composite pipe

    鋼絲網骨架塑料
  8. Application of composite steel skeleton reinforced plastic pipe

    鋼骨架增強塑料復合管及其應用
  9. Perforated steel skeleton polyethylene composite pipes for industry

    工業用孔網鋼骨架聚乙烯復合管
  10. Fittings of perforated steel skeleton polyethylene composite pipes for industry

    工業用孔網鋼骨架聚乙烯復合管件
  11. Steel skeleton compact

    鋼骨架坯塊
  12. Quality control of steel skeleton concrete casting

    鋼骨高強混凝土柱受力性能的試驗研究
  13. Concrete pylons are adopted for the fengdu yangtze suspension bridge, and normal construction methods for the pylons include slide formworks, turning shutters and climbing formworks. climbing formworks with assembled steel - pipe scaffolding is a newly - developed technique for this bridge. it causes saving of the steel skeleton for construction of the pylons. by utilizing regular simple rods and parts, construction progress is fast and the quality is good

    豐都長江大橋懸索橋採用混凝土橋塔,其常規的施工方法有滑模、翻模和爬模等幾種,本橋施工中採用了新開發的鋼管爬升架倒模新工藝,不僅節省了為橋塔施工而設計的橋塔型鋼骨架,而且利用常規的簡易桿件、施工速度快,施工質量好。
  14. Superposition method for calculating bearing capacity on normal section of beam with steel skeleton and bars reinforced concrete

    鋼骨混凝土梁正截面承載力計算的疊加方法
  15. Steel skeleton building

    鋼骨架房屋
  16. Steel skeleton construction

    鋼骨架結構
  17. It is the economy prefab of environmental protection of a kind of brand - new concept which designed by our company, divided ordinary type, standard type and top - grade types. but according to the customer s demand, this prefab carry on the space association with the standard modulus, adopt the light steel construction to form its skeleton system, and with internal wall panel and pu roof panel enclose protecting and roofing system

    是本公司推出的一種全新概念的環保經濟型活動房屋,分普通型標準型和高檔型三種。可根據客戶的需求,以標準模數進行空間組合,採用輕鋼結構形成其骨架系統,並以夾芯墻板及pu瓦形成圍護及屋面系統。
  18. According to unified theory and hysteretic model based on section, the hysteretic models of steel beam, reinforced concrete beam and concrete filled steel tubular ( cfst ) structure column were chosen respectively, then the nonlinear structural analysis program called idarc is employed to determine the skeleton curve of the concrete filled steel tubular frame structure

    摘要以鋼管混凝土統一理論為基礎,從截面層次的恢復力模型出發,鋼管混凝土柱構件選用三線型彎矩曲率滯回模型;鋼梁採用雙線型彎矩轉角滯回模型;鋼筋混凝土梁選用三線型彎矩轉角滯回模型。
  19. Based on experimental research and theoretical analysis, investigations on the new type of joint are made systematically, the main contents and results include the following items. 1 four specimens of new joints between cfrt columns and steel beams are designed. by low - cyclic reversed load test, skeleton curves of new joints and shearing deformation in joint core area are studied, the influence of parameters, such as concrete cores, length of stiffener, and relative dimensions of column and beam, is discussed

    本文在分析現有節點方案特點的基礎上,提出了角鋼加勁式節點方案,並採用試驗和理論分析相結合的方法,對這種新型節點進行了系統研究,主要研究內容與成果如下: (一)設計了4個新型方鋼管混凝土柱?鋼梁節點的試件,通過對新型節點的低周反復荷載試驗,研究了新型節點的骨架曲線和節點核心區剪切變形等,探討了內填混凝土、加勁肋長度和樑柱相對尺寸等對節點抗震性能影響。
分享友人