steel structure work 中文意思是什麼

steel structure work 解釋
鋼結構工程
  • steel : n 1 鋼,鋼鐵。2 鋼製品;刀,劍,打火鐮;(女人胸衣等中的)松緊鋼條[絲];鋼磨;〈美國〉剃刀,小刀...
  • structure : n. 1. 構造,結構;組織;石理,石紋。2. 建造物。3. 【化學】化學結構。4. 【心理學】(直接經驗中顯現的)結構性,整體性;整體結構。adj. -d ,-less adj.
  • work : n 1 工作,操作,勞動,作業;工件;功課;努力;行為,作用。2 (待辦的)事務,業務;職業。3 〈前有...
  1. In order to study how the floor stiffnesses influence on the mega steel - frame structures, the results of mode 1 and mode 4 of example 1, and those of mode 2 and mode 3 of three examples are compared. some conclusions are obtained as follows : compared with beams and columns of the common steel - frame structures, the cross - sectional dimension of mega beams and mega columns in the main - frames of mega steel - frame structures are very large. because the mega structure system has great lateral stiffness and entirety work behavior, whether or not considering the floor stiffness has less influence on the entirety responses of the mega steel - frame structures and on the displacement and internal forces of columns of the mainframe, but larger influence on the response of columns of hypo - frame

    通過對算例1方案1和方案4及算例1 - 3方案2和方案3結構周期、位移和內力反應的比較,研究了樓板剛度對巨型鋼框架結構反應的影響,得到如下結論:與普通鋼框架的梁、柱相比,巨型鋼框架中主框架的巨型梁、巨型柱截面尺寸要大得多,並且由它們組成的這種超常規的大型結構具有巨大的抗側剛度和整體工作性能,因此,在地震作用下,考慮樓板剛度與否對巨型鋼框架結構整體反應影響不大,對主框架柱位移和內力反應影響也不大,但對次框架位移和內力反應的影響相對較大。
  2. The experimental study of twelve push - out specimens with different hole molds and different materials filled in holes and two composite steel - fdpcp ( full - depth precast concrete panels ) beams of a full shear connection and different hole mold, as well as a composite steel - fdpcp beams of a partial shear connection and square holes was conducted in this paper, the authors gain following results : three composite steel - fdpcp beams all have good composite action and perfect work behaviors as a whole and the composite steel - fdpcp beams is a new - style structure which should get further research and development

    摘要對12個不同預留孔形、孔內不同填充材料的推出試件及2根不同預留孔形的完全剪力連接與1根部分剪力連接的鋼混凝土預制板組合梁進行了試驗,結果表明,只要預留孔形設計合理,灌孔混凝土強度得當,鋼混凝土預制板組合梁就具有良好的組合效應和整體工作性能,是一種有發展前途和廣泛應用領域的新型組合結構。
  3. This processing line is composed of two sszym 1500a straight line double pencil edgers, with 90transfer worktable. which adopts plc control system sets processing parameters via interface to control width and speed, double screw rod and double straight line glide transmission, guarantee the active briges parallel moving precision, can grind 3 8mm thickness flat edge and pencil edge. this machine structure was designed tightly, function stabilized with high efficiency. it is mainly suit for large batch industrial glass which does deep process and production, be matched with glue printing steel etc. production line. this product is a master work with firenew design by our company, it is another contributisn for chinese glass double edger series

    採用plc控制系統通過界面設定參數,控制加工的寬度和速度,雙絲桿和雙直線導軌傳動,保證活動橋的平行移動精度,適用與加工3 8mm的小規格玻璃的平邊和圓邊。該機設計結構緊湊,性能穩定可靠,生產效率高。主要適應大批量工業玻璃深加工生產可以與夾膠印花鋼化等生產線配套使用。
  4. The climb up vehicle uses the high quality steel products manufacture to match by the high quality foot wheel ; has reliable, the structure safely is simple, the convenient quick characteristic ; suits specially under environment and so on factory, warehouse the light small material artificial climb up sorts the goods work

    登高車:登高車採用優質鋼材製造配以優質腳輪;具有安全可靠、結構簡單、方便快捷的特點;特別適合於工廠、倉庫等環境下輕小型物料的人工登高揀貨作業。
  5. The main work is described as follows : ( 1 ) this thesis introduces the phylogeny, research and application actuality inland and abroad of steel - concrete composite structure with corrugated steel webs, summarizes the basic construction and forcing characteristic of pre - stressed cantilever composite beam with corrugated steel webs

    主要做了以下工作: ( 1 )介紹了波形鋼腹板組合結構的發展歷史、在國內外的研究應用現狀,總結了預應力波形鋼腹板組合挑梁的基本構造特點和受力特徵。
  6. The main work of this paper was as fellows : ( 1 ) generalized the development of pre - stressed steel structure in our nation and abroad, and pointed out the main problem in practice ; ( 2 ) presented the mechanism of pre - stressed steel structure and revealed its applicable range ; ( 3 ) established the optimization design model for pre - stressed steel structure, which accounts for constraints on stresses and displacements of structure ; ( 4 ) brought forward the optimization design method, which combined linear programming and the principle of full restriction, through which we can obtain the magnitude of each time pre - stress and the optimized sections of each members of structure ; ( 5 ) analyzed the best times of pre - stress and pointed out that 2 ~ 3 times is preferable ; ( 6 ) conducted optimization design on large - space steel roof, horizontal parallel steel truss with local cables, horizontal parallel steel truss with global cable, and ultra - static steel truss, the result of which indicated that the multiple pre - stress structure is very economic ; ( 7 ) compared different schemes of cable placement for horizontal parallel steel truss, and the results showed that the local cable only unloaded the second girders, but had no response on the first girders and stomach poles, while global cable could unload the second girders and the stomach poles outside of turning point of cable, thus proving that global cable is more economic than local - cable

    本文的主要工作是:對國內外預應力鋼結構的發展歷史及現狀作了綜述和總結,指出當前預應力鋼結構工程實踐中存在的主要問題;闡述了預應力鋼結構的受力機理,並指出預應力鋼結構的適用范圍和特點;在考慮結構應力和變位約束的條件下,建立預應力鋼結構優化設計模型;提出多次預應力鋼結構優化設計方法和步驟,採用線性規劃和滿約束準則相結合的優化方法,可優化設計出施加的每一級預應力的大小,並得到結構各部分的優化截面;對多次預應力最佳的施加次數作了分析,並建議以2 3次為宜;為驗證文中理論和方法,分別對大跨多次預應力鋼屋架、局部布索的水平平行弦鋼桁架、整體布索的水平平行弦鋼桁架和局部布索的超靜定鋼桁架等算例進行了優化設計,經濟效益明顯;對水平平行弦鋼桁架的幾種施加預應力的方案進行比較,對于局部布索,預應力只對下弦起到卸載作用,對上弦和腹桿基本不起作用;而整體布索預應力除對下弦卸載外,對索折點以外部分腹桿也起到卸載作用,經濟效益好於局部布索。
  7. Abstract : the use of reinforcing steel welding mat in engineering construction requires special purpuse welding machine. this article introduces the structure design and work principle of the gwc series mat reinforcement automatic welding machine in briefing

    文摘:工程建設中鋼筋焊接網的引入應用,對專用焊接設備提出了需求,本文簡要介紹我廠開發的gwc系列鋼筋網自動焊接成型設備的結構設計和工作原理。
  8. The steel framework occupies a large portion of weight in the csicdc for its high density, and the foam sandwich structure occupies a large portion of volume in the csicdc and the costs is very high, therefore the optimum design work about the csicdc was focused on the steel framework and foam sandwich structure

    由於鋼骨架密度大,其重量在司機室中所佔比例大,同時玻璃鋼泡沫夾芯結構材料用量大且成本高。因此,混雜結構司機室優化設計工作主要圍繞鋼骨架和玻璃鋼泡沫夾芯結構展開。
  9. This thesis fetches cold - formed thin - walled c steel beam - to - column connections with self - drilling screw connecting for being researched object in cold - formed thin - walled light steel structure system, have done the following three parts of research work to the performance of beam - to - column connection : ( 1 ) the resisting shear strength experiments of 20 pieces of jointing connected by self - drilling screws

    本文取冷彎薄壁輕鋼龍骨住宅鋼結構中用自攻螺釘連接的c型鋼樑柱節點為研究對象,對節點的連接性能作了如下三部分研究工作: ( 1 ) 20個自攻螺釘連接試件的抗剪承載力試驗。
  10. On the basis of establishing the model of the axial tensile members of the prestressed concrete filled steel tubular, two - step design method is used to explain the principle of work and the stability bearing capacity of the structure at the stage prestressing is analyzed ; 2

    本文主要進行了如下工作: 1在建立預應力鋼管混凝土軸心受拉構件模型的基礎上,用兩階段設計法闡述了其工作機理,並對結構在預應力施加階段的穩定承載力進行了理論分析; 2
  11. Installation of steel structures and cladding. fabricate and install docking, front wall steel structure. precast concrete and stressing work

    安裝鋼結構及蓋面板、平臺和前墻結構建造安裝,混凝土預製件及張拉工程。
  12. Grid frame structure is a type of space structure consisted of steel components and joints. it is of high rigidity and can work as a whole to resist earthquake efficiently

    網架是由鋼構件(鋼管或角鋼)及其連接配件組成的空間結構體系。
  13. This machine has two vacuum rooms to work by turns, the upper and underside room are both made by stainless steel, the structure is very justified, very airtight, transfigure and stable, and it come up to food health and anti - corrosion demand. there is a set of hot pressing device and adopt balanced structure

    本機有兩個真空室輪流工作,左、右與上蓋工作室全部採用不銹鋼材料製成,結構合理,氣密性好,美觀耐用,並符合食品衛生與防腐要求,上蓋裝有一組熱壓封口裝置,並採用平衡結構,可在任何位置停留,並有緩沖保護。
  14. High pressure gas - quenching of work - pieces in the form of long pole made and high - speed steel, tool and mould steel, alloy structure steel etc. annealing of magnetic materials

    實例:適合長桿類的高速鋼工模具鋼合金結構鋼等材料的高壓氣淬,以及磁性材料的退火等。
  15. There are two reasons that this subject is selected. firstly, with the in - depth reform of our socialist market economy mechanism, the iron and steel industry is stepping into an important period of establishing modernized enterprise systems and adjusting. optimizing the industry structure. lt is an important work to increase economic benefit and enhance business strength for the iron and steel industry

    選題的動因主要有二:一是隨著社會主義市場經濟體制改革的不斷深入,我國鋼鐵企業的發展正處于全面建立現代企業制度,調整優化產業結構的重要時期,進行經營戰略研究,提高資本運營效率是增強鋼鐵經濟實力的一個重要課題。
  16. In the light of the characteristics that the joint parts between the concrete rigid - frame structure and steel box arch ring of caiyuanba changjiang river bridge in chongqing mainly work as the compressive elements, the design of the parts is carried out by means of improving the steel plates, and the design methods and local details design of prestressing steels are put forward in order to ensure the safety of the bridge structure

    摘要針對重慶菜園壩長江大橋混凝土剛構與鋼箱拱接頭主要為受壓構件的特點,採用改進鋼板形式進行設計,提出預應力鋼筋的設計方法及局部細節設計,確保結構安全可行。
  17. Introdution to construction management of steel structure work of main terminal of guangzhou new baiyun international airport

    廣州新白雲國際機場主航站樓鋼結構工程施工管理
  18. Construction should strictly follow check & accept specification for steel structure work ( gb50205 - 2001 )

    嚴格按照《鋼結構工程施工質量驗收規范》 ( gb50205 - 2001 )的要求組織施工。
  19. Content of construction : civil work, steel structure work, installation work, commissioning, construction and purchase management

    工程內容:土建施工、鋼結構、安裝、檢驗、工程施工及采購管理。
分享友人